NV FLAP US93(1)_plans.pdf
PDF 26 MB Posted
- Attached to
- NV FLAP US93(1) Pahranagat NWR Access
- Solicitation number
- 6982AF20B000044
About this file
This solicitation is for a construction project providing improvements to US93 and Pahranagat National Wildlife Refuge Visitor Center Road and parking area in Nevada. The project includes safety improvements such as turn lanes on US93, reconstruction of Visitor Center Road, and paving of the Visitor Center parking area. It consists of roadway construction, addition of aggregate base, and asphalt pavement. Significant work includes embankment construction, aggregate base, and asphalt concrete pavement. Schedule A covers all work on US93 and Option X includes work on Visitor Center Road and parking. Construction is to begin in January 2021 with completion anticipated by August/September 2021. The estimate for the base schedule and options is between $5-10 million. The solicitation was issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/31/21
09/03/2020
Hahn, Philip R
Digitally signed by Hahn, Philip R Date: 2020.09.03 09:31:30 -06'00'
09/08/2020
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M U
S .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
08/26/2020
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
USFWS - United States Fish & Wildlife Service
HCL - Horizontal Control Line
HSS - Hollow Structural Sections
NRCS - National Resources Conservation Service
NRS - National Wildlife Refuge System
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
PROJECT SPECIFIC ABBREVIATIONS
DOI - Department of the Interior
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C
T L U
S .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1) A4
SURVEY CONTROL
0+
0+
0+
0+
0+
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
T E U
S .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
0+
0+
0+
0+
0+
0+
0+
+00
800'400'0
Scale in Feet
US93 North US93 South
SITE MAP
U p p e r L a k e A c c e s s R d
A la m o .1 m ile s
L a s V e g a s
.7 m ile s
A5
.4 M ile s to b e g in in g o f U
S N
.4 M ile s to e n d o f U
S S
138+15
US93 South
End Schedule A
400+40
Black Canyon Road
Begin Schedule A
401+45
Black Canyon Road
End Schedule A
US93 NORTH
END SHCEDULE A
NV FLAP US93(1)
END PROJECT
239+19
US93 NORTH
BEGIN SCHEDULE A
NV FLAP US93(1)
204+59
PARING AREA
VISITOR CENTER
BEGIN OPTION X
900+23
PARKING AREA
VISITOR CENTER
END OPTION X
905+35
US93 SOUTH
BEGIN SCHEDULE A
NV FLAP US93(1)
BEGIN PROJECT
107+114
ENTRANCE ROAD
VISITOR CENTER
BEGIN OPTION X
289+24
ENTRANCE ROAD
VISITOR CENTER
END OPTION X
312+51
503+71
BLACK CANYON TRAIL
END SCHEDULE A
500+00
TRAIL
BLACK CANYON
BEGIN SCHEDULE A
TYPICAL SECTIONS
A6
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
conditions.
variable sand and gravel varies 5-8" HMA over
Existing asphalt pavement conditions.
variable sand and gravel varies 5-8" HMA over
Existing asphalt pavement
NOTE:
TOTAL (mi)
(ft)Roadway
TOTALS (ft)
PROJECT
LENGTH OF
1. Typical sections are representative only.
107+14 to 110+98
EXISTING TYPICAL SECTION
US93 SOUTH
110+98 to 138+15
EXISTING TYPICAL SECTION
US93 SOUTH
Existing centerline rumble strip
LC
Average 26'
Existing width varies
Existing centerline rumble strip
LC
Average 26'
Existing width varies
Schedule A Option X
(ft)Roadway Station to Station
107+14 to 138+15
204+59 to 236+19
400+40 to 401+45
289+24 to 312+51
900+23 to 905+35
Visitor Center Entrance Road
US 93 South
US 93 North
Black Canyon Road
Visitor Center Parking Area
1.28 .54
500+00 to 503+71 Black Canyon Trail 371
Description
A7
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
See pavement detail for lift information.
6.25" Asphalt concrete pavement.
existing
Match existing
Match existing
Match
NOTE:
See pavement detail for lift information.
6.25" Asphalt concrete pavement.
SB Width
Sta Offset
NB Width
Sta Offset
138+15
130+50
128+00
126+56
117+04
114+52
107+14
12'
24'
24'
36'
36'
24'
12'
129+44
128+97
126+45
119+13
117+71
117+35
12'
12'
24'
24'
12'
12' sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement for lift information.
See pavement detail
2.75" mill and overlay.
information.
detail for lift
See pavement overlay.
2.75" mill and
129+44 to 138+15
107+14 to 117+36
TYPICAL SECTION
US93 SOUTH
117+36 to 129+44
TYPICAL SECTION
US93 SOUTH
1:2
Shldr
4'
Traveled WayShldr
4' 3' min
4'
1:4
1:4
LC
LC
rumble strip
Proposed centerline
5' limit stake
Slope
Clearing and construction limits seeding limits
Topsoil and
Traveled Way
Varies 12'-36'
Varies 12'-24'
MGS, type 2
*Guardrail system
See Detail A
1:3 max stake
Slope
Topsoil and
Traveled Way
Varies 12'-36'
Existing ground
Existing ground
Proposed centerline rumble strip
4'
Shldr
Clear zone 30'
12'
Traveled Way
Clear zone 30'
1:4
1:3 m ax stake
Slope
4' seeding limits
Topsoil and
3' min
See Detail A
Rumble Strip
Proposed Edge Line
Rumble Strip
Proposed Edge Line
1:3 1:3
1:
2.
m ax
Sawcut5
Sawcut5Sawcut 5
1' Shldr
Sta 100+93 and Sta 109+18
*Proposed guardrail Rt only between
Sta <100+00 and Sta 110+61
*Proposed guardrail Lt only between
MGS, type 2
*Guardrail system
Rumble Strip
Proposed Edge Line
8. Refer to Detail C204-50 for benching requirements.
traveled lanes.
7. 30' Clear zone is measured from edge of through
6. Install rumble strips according to Detail C633-50.
specified otherwise.
5. Sawcut 1' from existing edge of pavement unless height.
reduce the B and F dimensions to the actual cut
4. Round all earth slopes. For cut heights less than B,
3. See cross sections for cut and fill slope ratios stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
2. The gradient and width of roadway ditches and the
1. Typical sections are representative only.
5'
B=5'
F= 5' limit
Slope stake
F= 5'
B=5' limit
Slope stake
1:2.5 m ax
2" ACP Type I
US 93
MILL & OVERLAY
PAVEMENT DETAIL
asphalt lifts
Tack coat between
US 93
PAVEMENT DETAIL WIDENING
1:4
DETAIL A
30°
Asphalt concrete pavement base
Aggregate
0.82 sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway aggregate, method 2
Construct 30° pavement edge (safety edge) method 2
8" Roadway aggregate, aggregate, method 2
8" Roadway first asphalt lift applied prior to
Prime coat 2.5" ACP Type I
3" ACP Type I asphalt lifts
Tack coat between aggregate, method 2
8" Roadway Line Rumble Strip
Proposed Edge surface course
0.75" Open graded surface course
0.75" Open graded
Tortoise Fence
A8
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
conditions.
variable sand and gravel varies 5-8" HMA over
Existing asphalt pavement existing
Match existing
Match
NB Width
Sta Offset
NOTE:
217+09
214+23
205+73
204+59
24'
24'
12'
12' information.
See pavement detail for lift
6.25" Asphalt concrete pavement.
sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement lift information pavement detail for overlay. See
2.75" mill and US 93
PAVEMENT DETAIL WIDENING
2" ACP Type I
US 93
MILL & OVERLAY
PAVEMENT DETAIL
V a rie s
V a ri e s
Traveled Way
12'-24'
1:2
Average 26'
Existing width varies rumble strip
Existing centerline
MGS, type 2
Guardrail system
LC
Existing ground strip rumble centerline
Proposed
LC
Average 26'
Existing width varies
LC
rumble strip
Existing centerline
Slope stake limit
Shldr
4'12'
Through Lane
MGS, type 2
Guardrail system first asphalt lift applied prior to
Prime coat 2.5" ACP Type I
3" ACP Type I
222+00 to 236+19
EXISTING TYPICAL SECTION
US93 NORTH
204+59 to 217+09
TYPICAL SECTION
US93 NORTH
Sawcut5
Rumble Strip
Proposed Edge Line Rumble Strip
Proposed Edge Line
Shldr
1' sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement
204+59 to 222+00
EXISTING TYPICAL SECTION
US93 NORTH
asphalt lifts
Tack coat between asphalt lifts
Tack coat between
1:4
DETAIL A
30°
Asphalt concrete pavement base
Aggregate
8. Refer to Detail C204-50 for benching requirements.
traveled lanes.
7. 30' Clear zone is measured from edge of through
6. Install rumble strips according to Detail C633-50.
specified otherwise.
5. Sawcut 1' from existing edge of pavement unless height.
reduce the B and F dimensions to the actual cut
4. Round all earth slopes. For cut heights less than B,
3. See cross sections for cut and fill slope ratios stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
2. The gradient and width of roadway ditches and the
1. Typical sections are representative only.
0.82 sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway aggregate, method 2
Construct 30° pavement edge (safety edge) method 2
8" Roadway aggregate, aggregate, method 2
8" Roadway surface course
0.75" Open graded
A9
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement existing
Match existing
Match
Sta 204+20 and Sta 219+59
*Proposed guardrail Rt. only between sand and gravel conditions.
varies 5-8" HMA over variable
Existing asphalt pavement existing
Match existing
Match existing
Match
See pavement detail for lift information.
6.25" Asphalt concrete pavement.
existing
Match
SB Width
Sta Offset
NB Width
Sta Offset
NOTE:
236+19
227+72
217+09
12'
24'
24'
See pavement detail for lift information.
6.25" Asphalt concrete pavement.
See pavement detail for lift information.
6.25" Asphalt concrete pavement.
231+32
230+86
228+35
218+84
217+43
217+09
12'
12'
24'
24'
12'
12' for lift information.
See pavement detail
2.75" mill and overlay.
US 93
PAVEMENT DETAIL WIDENING
2" ACP Type I
US 93
MILL & OVERLAY
PAVEMENT DETAIL
for lift information.
See pavement detail
2.75" mill and overlay.
for lift information.
See pavement detail
2.75" mill and overlay.
Shldr
4' 3' min
4'
1:4
1:2
1:
stake
Slope
MGS, type 2
*Guardrail system
LC
seeding limits
Topsoil and
Shldr
4' limit stake
Slope
Traveled Way
Varies 12'-24'
1:4
Varies 12'-24'
Traveled Way
Varies 12'-24'
Traveled Way
Varies 12'-24'
Topsoil and
Detail A
See
Traveled Way
24'
Existing ground ground
Existing
Existing ground
Slope stake limit rumble strip
Proposed centerline rumble strip
Proposed centerline
See Detail A
Proposed centerline rumble strip
4'
Shldr
4'
Shldr
Clear zone 30'
12'
3' min
4'
1:4
Shldr
4' first asphalt lift applied prior to
Prime coat
MGS, type 2
Guardrail system
2.5" ACP Type I
3" ACP Type I
217+09 to 221+46
TYPICAL SECTION
US93 NORTH
221+46 to 231+32
TYPICAL SECTION
US93 NORTH
231+32 to 236+19
TYPICAL SECTION
US93 NORTH
Rumble Strip
Proposed Edge Line
Sawcut5
Sawcut5
Sawcut5 Sawcut 5
Sawcut 5
Clear zone 30'7
Clear zone 30'7
1:
:2 .5 m ax
1:3
Clear zone 30' 7
Rumble Strip
Edge Line
Proposed
Rumble Strip
Edge Line
Proposed
Shldr
1'
Rumble Strip
Proposed Edge Line
Rumble Strip
Proposed Edge Line asphalt lifts
Tack coat between asphalt lifts
Tack coat between limit
Slope stake
5'
B= 5'
F=
:2 .5 m ax
5'
B= 5'
F=
Topsoil and seeding limits
Topsoil and seeding limits 1:4
DETAIL A
30°
Asphalt concrete pavement base
Aggregate
:2 .5 m ax
0.82
8. Refer to Detail C204-50 for benching requirements.
traveled lanes.
7. 30' Clear zone is measured from edge of through
6. Install rumble strips according to Detail 633-A.
specified otherwise.
5. Sawcut 1' from existing edge of pavement unless height.
reduce the B and F dimensions to the actual cut
4. Round all earth slopes. For cut heights less than B,
3. See cross sections for cut and fill slope ratios stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
2. The gradient and width of roadway ditches and the
1. Typical sections are representative only.
8" Roadway aggregate, method 2
8" Roadway aggregate, method 2 method 2
8" Roadway aggregate, aggregate, method 2
8" Roadway limit stake
Slope surface course
0.75" Open graded
Fence
Tortoise
5' sides of roadway) left
(Detail applies to both right and aggregate, method 2
Shoulder up with Roadway
(safety edge)
Construct 30° pavement edge
5'
Fence
Tortoise
A10
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
2%
See pavement detail for lift information.
3" Asphalt concrete pavement.
2%
NOTE:
See pavement detail for lift information.
3" Asphalt concrete pavement.
400+40 to 401+45
EXISTING TYPICAL SECTION
BLACK CANYON ROAD
method 2
2" Roadway aggregate
500+00 to 503+71
TYPICAL SECTION
BLACK CANYON TRAIL
1:4
1'
Shldr
1'
Shldr
1:4
LC
LC
Existing ground
5'
Slope stake limit first asphalt lift applied prior to
Prime coat
Topsoil and
Slope stake limit
Existing ground
1:4
1'
Shldr
1'
Shldr
1:4
LC
LC
Existing ground
Slope stake limit
Topsoil and
Slope stake limit seeding limits
Topsoil and seeding limits
Topsoil and
Traveled way
9'
Traveled way
9'
Traveled way
9'
Traveled way
9'
LC
400+40 to 401+45
TYPICAL SECTION
BLACK CANYON ROAD
max
1:3 max 1:3 to top asphalt lift
Fog seal applied
2%2%
1:4
DETAIL A
30°
Asphalt concrete pavement base
Aggregate height.
reduce the B and F dimensions to the actual cut
4. Round all earth slopes. For cut heights less than B,
3. See cross sections for cut and fill slope ratios stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
2. The gradient and width of roadway ditches and the
1. Typical sections are representative only.
304+66 to 312+51
295+15 to 303+12
289+24 to 290+70
TYPICAL SECTION
VISITOR CENTER ENTRANCE ROAD
295+15 to 312+51
289+24 to 290+70
EXISTING TYPICAL SECTION
VISITOR CENTER ENTRANCE ROAD
0.40
1.8%
BLACK CANYON ROAD
VISITOR CENTER ENTRANCE ROAD
PAVEMENT DETAIL
sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway aggregate, method 2
Construct 30° pavement edge (safety edge)
4" Roadway aggregate, method 2
4" Roadway aggregate, method 2 aggregate, method 2
4" Roadway lifts placed in two equal
3.0" ACP Type I, Roadway reconditioning, 289+24 to 301+24
10' seeding limits
Topsoil and seeding limits
2" Crushed aggregate
A11
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
first asphalt lift applied prior to
Prime coat
NOTE:
LC
Existing ground
900+23 to 905+35
EXISTING TYPICAL SECTION
VISITOR CENTER PARKING AREA
See pavement detail for lift information.
3" Asphalt concrete pavement.
1:41:4
LC
Existing ground
Topsoil and
Slope stake limit seeding limits
Topsoil and
900+23 to 905+35
TYPICAL SECTION
VISITOR CENTER PARKING AREA
LC
roadway aggregate
Existing
LC
2% 2%
1'
Shldr
1'
Shldr Traveled way
9'
Traveled way
9'
See pavement detail for lift information.
3" Asphalt concrete pavement.
See Detail A
5' 5'
Clearing and construction limits
2%
See pavement detail for lift information.
3" Asphalt concrete pavement.
2% 1:4
1'
Shldr
1'
Shldr
Topsoil and
Slope stake limit
Traveled way
9'
Traveled way
9'
12-inch depth
Concrete curb, Slope stake limit
Slope stake limit
1:3 max
Existing ground
2% min edge of berm
Match existing
Varies Varies
Varies Varies
2%
Topsoil and seeding limits
Topsoil and seeding limits to top asphalt lift
Fog seal applied seeding limits
Topsoil and 1:4
DETAIL A
30°
Asphalt concrete pavement base
Aggregate dimensions.
5. See Visitor Center Parking Area plan sheet for roadway height.
reduce the B and F dimensions to the actual cut
4. Round all earth slopes. For cut heights less than B,
3. See cross sections for cut and fill slope ratios stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
2. The gradient and width of roadway ditches and the
1. Typical sections are representative only.
290+70 to 295+15
TYPICAL SECTION
VISITOR CENTER ENTRANCE ROAD
290+70 to 295+15
EXISTING TYPICAL SECTION
VISITOR CENTER ENTRANCE ROAD
303+12 to 304+66
TYPICAL SECTION
VISITOR CENTER ENTRANCE ROAD
0.40'
VISITOR CENTER PARKING AREA
VISITOR CENTER ENTRANCE ROAD
PAVEMENT DETAIL
4" Roadway aggregate, method 2
4" Roadway aggregate, method 2 sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway aggregate, method 2
Construct 30° pavement edge (safety edge)
4" Roadway aggregate, method 2 method 2
4" Roadway aggregate, lifts placed in two equal
3.0" ACP Type I, Roadway reconditioning
Roadway reconditioning
STATION
CLASS
TYPE1.
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach
(ft)
R
(ft)
R
(ft)
W 1 2
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road
Variable
W
Variable
3' minimum
16'x
20' desired
15' min.
1.3'
W
1.3' d
4' (typ.)
4' (typ.)
APPROACH ROADS
TYPICAL SECTIONS
widths greater than 15 feet.
Apply the normal crown to approach roads with
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT = 200
100 = ADT < 199
25 = ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
N/A
4' (typ.)
U
S E
R
A12
134+66 Rt. 1A 21 21 20
981601A221+94 Rt. 15 35
222+56 Lt. 1A 16 16 20 25 25
301+36 Lt. 3A 11 11 20 N/A N/A
Variable
V a ria b le
A s
B
A
B
M a in li e
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li grade (optional)
Typical maximum design
A
A B
B
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
NOTE:Paved length
NO SCALE
(1:6 desirable)
1:4 or flatter base edge
Aggregate thicknesses and foreslopes.
Refer to mainline typical sections for structural section
Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
TYPICAL PLAN
TYPE 3
APPROACH ROAD
REMARKS
APPROACH ROAD SUMMARY
base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle 8.
4.
3.
8.
2.
3.
1.
6.
2.
6.
2.
6.
7.
Subgrade edge
Aggregate base edge
End Section A-A
End Section A-A
Total length
Paved length
90° W
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
90°
Typical culvert location edge subgrade
Normal
Aggregate base edge
R
Total length
R1
WW
with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
8.
7.
6.
5.
4.
3.
2.
1.
maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d ty p a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
Sheet and Description
B5 B5 B6 B7-B8 B9 B10 B11-B12 B13-B15 B16
Surfacing
Summaries
Survey and
Grading
Summaries
Erosion
Control
Summaries
Removal
Summaries
Drainage
Summaries
Miscellaneous
Summaries
Signing
Summaries
Striping
Summaries
TTC
Summaries Allowance
Bid
Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 3 3
A0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 8 8
A0040 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 1 1
A0050 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 1.200 1.200
A0060 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 4.880 4.880
A0070 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0090 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 6,246 354 6,600
A0110 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 9 2 11
A0120 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 1 1
A0130 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0140 20101-0000 CLEARING AND GRUBBING ACRE 12.03 0.37 12.40
A0150 20301-0700 REMOVAL OF DELINEATOR EACH 10 10
A0160 20301-2400 REMOVAL OF SIGN EACH 22 22
A0170 20301-2700 REMOVAL OF STRUCTURE EACH 1 1
A0180 20302-0700 REMOVAL OF FENCE LNFT 2,295 115 2,410
A0190 20302-1200 REMOVAL OF GUARDRAIL LNFT 8,337 423 8,760
A0200 20302-1700 REMOVAL OF PAVED WATERWAY, ASPHALT LNFT 20 5 25
A0210 20302-1900 REMOVAL OF PAVED WATERWAY, CONCRETE LNFT 33 2 35
A0220 20302-2100 REMOVAL OF PIPE CULVERT LNFT 164 11 175
A0230 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 1,373 77 1,450
A0240 20315-0000 SAWCUTTING PAVEMENT LNFT 8,807 443 9,250
A0250 20420-0000 EMBANKMENT CONSTRUCTION CUYD 16,850 1,150 18,000
A0260 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 5,157 543 5,700
A0270 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A SQYD 409 41 450
A0280 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 5 1 6
A0290 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 71 9 80
A0300 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 35 5 40
A0310 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 6,870 630 7,500
A0320 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 6,409 591 7,000
A0340 40501-0100 OPEN-GRADED ASPHALT FRICTION COURSE, GRADING A OR B TON 1,305 195 1,500
A0350 41102-1000 PRIME COAT, METHOD 1 SQYD 14,682 738 15,420
A0360 41105-0000 BLOTTER TON 107 8 115
A0370 41106-0000 CRUSHED AGGREGATE TON 42 3 45
A0380 41201-0000 TACK COAT TON 20.5 4.5 25.0
A0390 41301-0000 ASPHALT PAVEMENT MILLING SQYD 17,621 1,379 19,000
A0400 60201-0600 18-INCH PIPE CULVERT LNFT 164 11 175
A0410 60201-0800 24-INCH PIPE CULVERT LNFT 378 22 400
MileStone: AD Submittal
Date Completed: 10/02/20
Report Date: 10/05/20
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -O c t-
:4 A
M
Remarks and/or
Determination of
Estimated
Quantity
Pay Item Description Unit
Estimated
Quantities c p w w o rk in g \c e n tr a l0
\d
S O
Q .x ls m
]S h e e t
STATE PROJECT
B1NV FLAP US93(1)NV
SHEET
NUMBER
10/06/2020
Surfacing
Summaries
Survey and
Grading
Summaries
Erosion
Control
Summaries
Removal
Summaries
Drainage
Summaries
Miscellaneous
Summaries
Signing
Summaries
Striping
Summaries
TTC
Summaries Allowance
Bid
Schedule
A0420 60201-1000 36-INCH PIPE CULVERT LNFT 94 1 95
A0430 60201-1100 42-INCH PIPE CULVERT LNFT 45 5 50
A0440 60202-1000 60-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 28 2 30
A0450 60401-1000 MANHOLE, FLH EACH 1 1
A0460 60404-0000 CATCH BASIN (DROP INLET TYPE 2B) EACH 2 2
A0470 60420-0000 OUTLET STRUCTURE EACH 1 1
A0480 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 8,300 100 8,400
A0490 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 10 10
A0500 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 2,331 119 2,450
A0510 61901-3300 FENCE, TORTOISE BARRIER LNFT 9,446 504 9,950
A0520 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0530 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40
A0540 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER HOUR 40
A0550 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 40
A0560 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0570 62301-0000 GENERAL LABOR HOUR 40
A0580 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES TORTOISE BIOLOGIST HOUR 1,210 1,210
A0590 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40
A0600 62407-0000 PLACING CONSERVED TOPSOIL CUYD 5,157 543 5,700
A0610 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 9.6 1.4 11.0
A0620 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 9.6 1.4 11.0
A0630 62903-0000 CELLULAR CONFINEMENT SYSTEM SQYD 194 16 210
A0640 63301-0000 SIGN SYSTEM EACH 31 31
A0650 63302-0000 SIGN SYSTEM SQFT 487.3 487.3
A0660 63309-0200 DELINEATOR, TYPE 2 EACH 98 98
A0670 63313-0000 RUMBLE STRIP LNFT 15,306 769 16,075
A0680 63316-1000 REMOVE AND RESET SIGN EACH 4 4
A0690 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID LNFT 33,940 410 34,350
A0700 63405-2900 PAVEMENT MARKINGS, TYPE H, TURN ARROW EACH 47 47
A0710 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 40 40
A0720 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION EACH 2 2
A0730 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 23 23
A0740 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 3,100 3,100
A0750 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 20,320 20,320
A0760 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL LNFT 20,320 20,320
A0770 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 500 500
A0780 63508-1000 TEMPORARY TRAFFIC CONTROL, MAINTENANCE OF TRAFFIC, PAVEMENT PATCH TON 260 260
A0790 63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR WEEK 19 19
A0800 63640-0400 RELOCATE POLE LPSM All ALL
A0810 63713-0000 FIELD OFFICE SERVICES MO 7 7
-O c t-
:4 A
M
MileStone: AD Submittal
Date Completed: 10/02/20
Report Date: 10/05/20 c p w w o rk in g \c e n tr a l0
\d
S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated
Quantity
STATE PROJECT
B2NV FLAP US93(1)NV
SHEET
NUMBER
Surfacing
Summaries
Survey and
Grading
Summaries
Erosion
Control
Summaries
Removal
Summaries
Drainage
Summaries
Miscellaneo us
Summaries
Signing
Summaries
Striping
Summaries
TTC
Summaries Allowance
Bid
Schedule
X0010 15101-0000 MOBILIZATION LPSM ALL
X0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 1 1
X0030 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 2 2
X0040 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.540 0.540
X0050 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 2.160 2.160
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0070 15401-0000 CONTRACTOR TESTING LPSM ALL
X0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0090 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 4,964 286 5,250
X0100 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 1 1
X0110 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
X0120 20101-0000 CLEARING AND GRUBBING ACRE 2.05 0.15 2.20
X0130 20301-2400 REMOVAL OF SIGN EACH 3 3
X0140 20301-2700 REMOVAL OF STRUCTURE EACH 1 1
X0150 20302-2100 REMOVAL OF PIPE CULVERT LNFT 42 3 45
X0160 20303-3700 REMOVAL OF PAVEMENT MARKINGS SQYD 4.33 4.33
X0170 20420-0000 EMBANKMENT CONSTRUCTION CUYD 6,160 6,160
X0180 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 821 129 950
X0190 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,600 400 2,000
X0200 30303-3000 ROADWAY RECONDITIONING SQYD 4,827 243 5,070
X0210 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,263 87 1,350
X0220 41102-1000 PRIME COAT, METHOD 1 SQYD 7,618 382 8,000
X0230 41105-0000 BLOTTER TON 56 4 60
X0240 41201-0000 TACK COAT TON 0.17 0.03 0.20
X0250 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 445 25 470
X0260 60915-1000 WHEELSTOP, CONCRETE EACH 15 15
X0270 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 50 50
X0280 61702-1600 TERMINAL SECTION, TYPE MGS FLARED EACH 2 2
X0290 61902-1400 GATE, METAL, 16 FEET WIDTH EACH 2 2
X0300 61902-1800 GATE, METAL, 24 FEET WIDTH EACH 1 1
X0310 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 10
X0320 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH
WIDTH HOUR 10
X0330 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 10
X0340 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
X0350 62301-0000 GENERAL LABOR HOUR 40
X0360 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES TORTOISE BIOLOGIST HOUR 210 210
X0370 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES ARCHAEOLOGICAL MONITOR HOUR 70 70
X0380 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40
X0390 62407-0000 PLACING CONSERVED TOPSOIL CUYD 821 129 950
-A u g -2
:3
P
M
MileStone: 100% Submittal
Date Completed: 08/28/20
Report Date: 08/28/20
C
U s e rs
\c h h o w a r\
D e s k to p \N
V P
A H
R \1
S O
Q .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule X
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
STATE PROJECT
B3NV FLAP US93(1)NV
SHEET
NUMBER
08/28/2020
Surfacing
Summaries
Survey and
Grading
Summaries
Erosion
Control
Summaries
Removal
Summaries
Drainage
Summaries
Miscellaneo us
Summaries
Signing
Summaries
Striping
Summaries
TTC
Summaries Allowance
Bid
Schedule
X0400 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.5 0.5 2.0
X0410 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.5 0.5 2.0
X0420 63301-0000 SIGN SYSTEM EACH 15 15
X0430 63309-0200 DELINEATOR, TYPE 2 EACH 71 71
X0440 63316-1000 REMOVE AND RESET SIGN EACH 2 2
X0450 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID LNFT 11,074 26 11,100
X0460 63405-2950 PAVEMENT MARKINGS, TYPE H, STRAIGHT ARROW EACH 7 7
X0470 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL EACH 2 2
X0480 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6
X0490 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 37 37
X0500 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 14 14
X0510 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 70 70
X0520 63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR WEEK 2 2
X0530 64605-0000 FIXTURE LPSM All ALL
-A u g -2
:3
P
M
MileStone: 100% Submittal
Date Completed: 08/28/20
Report Date: 08/28/20
C
U s e rs
\c h h o w a r\
D e s k to p \N
V P
A H
R \1
S O
Q .x ls m
]S h e e t
(4
SUMMARY OF QUANTITIES - Schedule X
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
STATE PROJECT
B4NV FLAP US93(1)NV
SHEET
NUMBER
08/28/2020
B5
SURFACING SUMMARIES
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B6
SUMMARIES
SURVEY AND GRADING
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B7
SUMMARIES
EROSION CONTROL
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B8
REMOVAL SUMMARY
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B9
DRAINAGE SUMMARIES
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B10
MISCELLANEOUS SUMMARIES
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B11
SIGNING SUMMARY
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B12
SIGNING SUMMARY
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B13
SUMMARY
PAVEMENT MARKINGS
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B14
PAVEMENT MARKINGS
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
B15
PAVEMENT MARKINGS
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B16
CONTROL SUMMARIES
TEMPORARY TRAFFIC
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B U
S .d
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
3300 3300
33003300
3300 3300
33003300
3305 3305
33053305
3305 3305
33053305
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1) C1
101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00
200'100'0
Scale in Feet
114+00 115+00113+00
NOTE:
survey limits with CO prior to construction.
Contractor to verify location and limits of guardrail outside of
Replace existing guardrail with MGS guardrail in locations shown.
UNITED STATES FISH & WILDLIFE BLM
UNITED STATES FISH & WILDLIFE BLM
Existing Ground
HCL US93 South
Existing fence
107+14
Pavement connection, 107+29, 16' RT
Begin taper match existing grade.
Profile grade to
100+93 to 109+18 RT
Remove existing guardrail pavement
Proposed edge of pavement
Existing edge of
US93 SOUTH - SCHEDULE A
Begin Schedule A
NV FLAP US93(1)
Begin Project
107+14
100+11 to 110+98
Remove existing guardrail, 114+52, 28' RT
Taper 100+55 to 109+55
MGS flared terminal section
Install MGS guardrail and
Begin Limits of Construction.
<100+00 to 110+98
MGS flared terminal section
Install MGS guardrail and
Begin Limits of Construction.
107+10
Begin Tortoise Fence
(See Points Table STA 109+46)
Slope Stabilization
Cellular Confinement System
109+46, 29' RT
(See Points Table STA 111+36)
Slope Stabilization
Cellular Confinement System
111+36, 32' RT
E: 792936.91
N: 27164326.79
Begin Schedule A
NV FLAP US93(1)
Begin Project
= NDOT 359+74
107+14
333533353335
33353335 33353335
33353335
33353335
333533353335
33353335 33353335
33353335
33353335
3340334033403340 33403340
3340 3340 3340
3340334033403340 33403340
3340 3340 3340
33453345
400+00
500+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1) C2
129+00
200'100'0
Scale in Feet
128+00127+00126+00125+00124+00123+00122+00121+00120+00119+00118+00117+00116+00115+00
UNITED STATES FISH & WILDLIFE
UNITED STATES FISH & WILDLIFE
UNITED STATES FISH & WILDLIFE
BLM
Existing Ground
HCL US93 South
R=35' R=35'
R=35'
R=35'
Protect in place
Existing pipes
123+31
123+31
117+04, 40' RT
End taper
117+36, 13' LT
Begin taper
119+13, 28' LT
End taper
Entrance Road
HCL Visitor Center
126+56, 40' RT
Begin taper
See Sheet D2 for Outfall
Road
HCL Black Canyon
126+45, 28' LT
Begin taper
HCL Trail
122+38
122+38 structure
Remove
Sta 400+00 Trailhead
Center Entrance Road
Sta 312+92Visitor
Sta 122+85 US 93
Install gate
128+00, 28' RT
End taper match existing grade.
Profile grade to
Existing Pipe
Connect to
142 LF 24" CMP
Place Manhole and
124+57, 118' LT
detail 602-A (Flashboard Riser)
Place Outlet Structure. See
Structure
Remove Existing Water Control
124+93, 95' RT
Note - Riprap/Geocell Aprons are Dimensioned as L X W1 X W2 X T of pavement
Proposed edge of pavement
Existing edge
US93 SOUTH - SCHEDULE A
install fence
Remove and install fence
Remove and install fence
Remove and
'x
'x
'x
.6
P la c e R ip r a p
C la s s R
T
D ia m e te r A r c h C
M P
P la c e
L
F
I n c h E q u iv il a n t
E x is ti n g
X
A r c h C
M P
P la c e
L
F
C
M P
R e m o v e E x is ti n g
C
M P install fence
Remove and
Reset utility pole
117+31
Begin Tortoise Fence
122+50
End Tortoise Fence
122+54
End Tortoise Fence
123+15
Begin Tortoise Fence
124+16
Fence
End Tortoise
123+23
Fence
Tortoise
Begin
124+25
Fence
Tortoise
Begin 127+74
End Tortoise Fence
127+76
Begin Tortoise Fence
334033403340 33403340
33403340
3340 3340
3340 3340
334033403340 33403340
33403340
3340 3340
3340 3340
33453345
33453345
33553355
33553355
33653365
33653365
53395
53395
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
143+00142+00141+00140+00139+00138+00137+00136+00135+00134+00133+00132+00131+00130+00129+00
C3
200'100'0
Scale in Feet
A
UNITED STATES FISH & WILDLIFE
UNITED STATES FISH & WILDLIFE
UNITED STATES FISH & WILDLIFE
UNITED STATES FISH & WILDLIFE
Existing Ground
HCL US93 South
53' LT
Remove asphalt
129+44, 14' LT
End taper match existing grade.
Profile grade to
Protect in Place
Existing Pipes fence
Remove and install install fence
Remove and
Install fence
130+50, 28' RT
Begin taper
US93 SOUTH - SCHEDULE A
NV FLAP US93(1) South
End Schedule A
138+15
E: 791537.02
N: 27167093.94
NV FLAP US93(1) South
End Schedule A
138+15
P la c e
L
F
C
M P
E x is ti n g
C
M P
137+85, 16' RT
End taper
138+15
Pavement connection, Existing Pipe
Connect to of pavement
Proposed edge of pavement
Existing edge
129+44
End Tortoise Fence
134+56
End Tortoise Fence
134+79
Begin Tortoise Fence
138+17
End Tortoise Fence
3390 3390
3395 3395
3400 3400
3405 3405
34053405
3410 3410
3410 3410
34103410
34153415
34203420
STATE PROJECT
A
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
204+00 205+00
C4
206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00
Existing Ground
200'100'0
Scale in Feet
217+09, 14' LT
Begin taper
214+24, 28' RT
End taper
BLM
match existing grade.
Profile grade to
Note - Riprap/Geocell Aprons are Dimensioned as L X W1 X W2 X T
Existing 36" CMP
216+36, Remove
UNITED STATES FISH & WILDLIFE
E: 789189.33
N: 27179876.59
NV FLAP US93(1) North
Begin Schedule A
204+59 guardrail continuation of
See Sheet C7 for
NV FLAP US93(1) North
Begin Schedule A
204+59
204+59
Begin Taper, Pavement connection, US93 NORTH - SCHEDULE A
<200+00 to 221+21
Install guardrail
<200+00 to 221+21
Remove guardrail
<200+00 to 221+09 install guardrail
Remove and
'x
'x
'x
.5
S lo p e S ta b il iz a ti o n a t
C u lv e r t
O u tl e ts
C e ll u la r C o n fi n e m e n t
S y s te
P la c e
L
F
C
M P
R e m o v e E x is ti n g
C
M P
'x
'x
'x
.5
S lo p e S ta b il iz a ti o n a t
C u lv e r t
O u tl e ts
C e ll u la r C o n fi n e m e n t
S y s c e
L
F
C
M P
E x is ti n g
C
M P
Existing Pipe
Connect to of pavement
Proposed edge of pavement
Existing edge
204+70
Begin Tortoise Fence
216+00
Begin Tortoise Fence
3435 3435 3435
34403440
344534453445
34503450
P C
.7
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
218+00
C5
219+00 220+00 221+00 222+00 223+00 224+00 225+00 226+00 227+00 228+00 229+00 230+00 231+00 232+00
Existing Ground
HCL US93 North
U p p e r L a k e A c c e s s R d
228+35, 28' LT
Begin taper
230+87, 16' LT
End taper
227+72, 24' RT
Begin taper
218+83, 28' LT
End taper
A
A
BLM
BLM BLM
U.S. FISH & WILDLIFE SERVICE
BLM
match existing grade.
Profile grade to
231+32
Note - Riprap/Geocell Aprons are Dimensioned as L X W1 X W2 X T
227+98)
(See Points Table STA
Place Riprap Class 3 RT
228+59)
(See Points Table STA
Place Riprap Class 3 RT
229+78)
(See Points Table STA
Place Riprap Class 3 RT
<200+00 to 221+09
MGS end sections
Install MGS guardrail and
<200+00 to 221+21 and MGS end sections
Install MGS guardrail
<200+00 to 219+21
Remove guardrail
<200+00 to 221+16
Remove guardrail
US93 NORTH - SCHEDULE A
'x
.5 'x
.5
S lo p e S ta b il iz a ti o n a t
C u lv e r t
O u tl e ts
C e ll u la r C o n fi n e m e n t
S y s c e
L
F
C
M P
E x is ti n g
C
M P
Existing Pipe
Connect to of pavement
Existing edge of pavement
Proposed edge
222+22
End Tortoise Fence
(See Points Table STA 221+10)
Slope Stabilization
Cellular Confinement System
221+10, 41' RT
221+23
Fence
Tortoise
End
222+43
Begin Tortoise Fence
223+00
Begin Tortoise Fence
200'100'0
Scale in Feet
(See Points Table STA 219+25)
Slope Stabilization
Cellular Confinement System
219+25, 36' RT
137 LF 18" CMP
Place Drop Inlet Type 2B
222+58, 36' RT
Place Drop Inlet Type 2B
222+66, 36' RT
3435 3435
3435 3435
3440 3440
3445 3445
344534453445
34503450
34553455
34653465
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00 241+00 242+00 243+00
C6
Existing Ground
200'100'0
Scale in Feet
HCL US93 North
236+19, 11' RT
End taper
Pavement connection.
BLM SHARP, JOSEPH L RANCH, LLC
LEE, JOHN KEVIN & ALYSSA
SHARP, JOSEPH L RANCH, LLC
BLM
BLM
match existing grade.
Profile grade to
235+88, 16' RT
Taper
US93 NORTH - SCHEDULE A
'x
'x
'x
.5
C u lv e r t
O u tl e ts
S lo p e S ta b il iz a ti o n a t
S y s
C ll u la r C o n fi n e m e n t
F
E S
P la c e L
F
C
M P
E x is ti n g
C
M P
End Schedule A
NV FLAP US93(1) North
End Project
236+19
Note - Riprap/Geocell Aprons are Dimensioned as L X W1 X W2 X T
Existing Pipe
Connect to of pavement
Proposed edge of pavement
Existing edge
236+10
End Tortoise Fence
233+40
End Tortoise Fence
E: 787302.81
N: 27182407.01
End Schedule A
NV FLAP US93(1) North
End Project
= NDOT 555+15
236+19
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d G
R U
S .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1) C7
200'100'0
Scale in Feet
UNIV.OF NEV BOARD OF REGENTS
BLM
NOTE:
survey limits for approval by CO.
Verify location and limits of guardrail outside
(flared or nonflared) to existing end anchorages.
locations shown. Match new end anchorages existing guardrail with MGS guardrail in approximate based on aerial imagery. Replace
Limits of guardrail shown in this plan are
UNITED STATES FISH & WILDLIFE
UNITED STATES FISH & WILDLIFE
<200+00 to 221+09 guardrail and MGS end sections
Remove and Install MGS guardrail and MGS end section
Remove and Install MGS
<200+00 to 221+21 guardrail and MGS end section
Remove and Install MGS
<200+00 to 221+21 guardrail and MGS end section
Remove and Install MGS
<200+00 to 221+09 guardrail and MGS end sections
Remove and Install MGS
NV FLAP US93(1) North
Begin Schedule A
204+59
GUARDRAIL PLAN
SCHEDULE A
US93 NORTH
.9
.9
.9
.0
33353335
Curve = P_US93_VC-1
PI 289+82.39
D
R = 300.00'
T = 32.00'
L = 63.77'
Curve = P_US93_VC-2
PI 293+20.03
D
R = 1,500.00'
T = 102.81'
L = 205.30'
Curve = P_US93_VC-3
PI 294+38.29
D
R = 400.00'
T = 15.77'
L = 31.51'
Curve = P_US93_VC-4
PI 295+11.68
D
R = 400.00'
T = 14.61'
L = 29.20'
Curve = P_US93_VC-5
PI 298+26.93
D
R = 1,200.00'
T = 157.73'
L = 313.67'
Curve = P_US93_VC-6
PI 301+46.75
D R = 100.00'
T = 84.70'
L = 140.55'
Curve = P_US93_VCP-2
PI 904+55.58
D
R = 100.00'
T = 38.66'
L = 73.77'
P O
T
.0
P C
.3
P T
.1
P C
.2
P C
C
.5
P T
.0
P C
.0
P T
.2
P C
.1
P T
.8
P C
.0
P R
C
.7
7 PT 304+58.01
P O
T
.0
PC
901+
84.76
PT 903+09.73
PC 904+16.92
PT 904+90.70
905+00
P O
T
.4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NV NV FLAP US93(1)
,3
.1
V P I
E L
,3
.5
+0.841% +2.559%
90' VC
K = 52
V P I
E L
,3
.5
+1.240%
50' VC
K = 38
SSD = 843'
V P I
E L
,3
.7
-1.599%
40' VC
K = 14
SSD = 400'
V P I
E L
,3
.0
-0.200%
40' VC
K = 29
V P I
E L
,3
.7
100' VC
K = 113
V P I
E L
,3
.9
+0.683%
50' VC
K = 217
SSD = 4702'
200'100'0
Scale in Feet
288+00 289+00 290+00 291+00 292+00 293+00 294+00 295+00 296+00 297+00 298+00 299+00 300+00 301+00
Entrance Road
HCL Visitor Center
24' Width
Gate, Metal, Parking Area
HCL Visitor Center
Existing ground
D1
NV FLAP US93(1)
Entrance Road
Visitor Center
Begin Option X
289+24
290+70
Begin curb
295+15
End curb
16' Width
Gate, metal, VISITOR CENTER ENTRANCE ROAD - OPTION X
0%
5%
-5%
5%
0%
-5%
289+24
289+60
-2% -1%
-2%
2% Profile grade line and axis of rotation LT EOP
RT EOP
E: 790678.29
N: 27164315.42
NV FLAP US93(1)
Visitor Center Entrance Road
Begin Option X
289+24 of pavement
Existing edge of pavement
Proposed edge
Curve = P_US93_TRL-1
R = 50.00'
T = 30.57'
L = 54.87'125+00
P O
T
.0
P O
T
.0
PC 50
0+00.0
PT
.8
P O
T
.1
Curve = P_US93_VC-6
PI 301+46.75
D
R = 100.00'
T = 84.70'
L = 140.55'
Curve = P_US93_VC-7
PI 302+72.32
D
R = 200.00'
T = 69.72'
L = 134.17'
Curve = P_US93_VC-8
PI 303+99.32
D
R = 200.00'
T = 62.55'
L = 121.24'
Curve = P_US93_VC-9
PI 305+52.03
D
R = 200.00'
T = 92.77'
L = 173.72'
Curve = P_US93_VC-10
PI 308+60.72
D
R = 300.00'
T = 100.34'
L = 193.67'
Curve = P_US93_VC-11
PI 310+83.57
D
R = 250.00'
T = 83.72'
L = 161.57'
P T
.8
P C
.0
P R C
.6
P R
C
.7
PT 304+
58.01
PC
.2
P T
.9
P C
.3
P T
.0
PC
.8
PT 311+
61.42
POT 312+87.00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
NV NV FLAP US93(1)
E L
,3
.9
+0.453%
50' VC
K = 217
SSD = 4702'
V P I
E L
,3
.2
190' VC
K = 113
V P I
E L
,3
.5
+2.140% -1.765%
175' VC
K = 45
SSD = 364'
V P I
E L
,3
.5
+1.286%
125' VC
K = 41
V P I
E L
,3
.9
100' VC
K = 21
V P I
E L
,3
.5
+6.0 00%
+2.000%
100' VC
K = 25
SSD = 320'
,3
.1
D2
300+00 301+00 302+00 303+00 304+00 305+00 306+00 307+00 308+00 309+00 310+00 311+00
200'100'0
Scale in Feet
Profile Grade Line
R=35'
HQ
En tra nc e
Rd
HCL US93 South
HCL Black Canyon Road
Drainage Information
See Sheet C2 for A
312+00 313+00
Existing Ground
16 feet width
Gate, Metal, 302+97, 44' LT and 24" pipe.
Remove existing structure
124 LF of 24" CMP
Place Manhole LT
124+57, 118' LT
Note - Riprap/Geocell Aprons are Dimensioned as L X W1 X W2 X T
7'x5'x8'x1'
Class 2 Riprap LT
124+64, 269' LT
301+99 to 302+51
Install guardrail
Entrance Road
HCL Visitor Center
24' Width
Gate, Metal, 310+68, 10' LT
311+19, 24' LT
311+74, 24' LT
312+29, 10' LT
R=35'
VISITOR CENTER ENTRANCE ROAD - OPTION X
Entrance Road
End Visitor Center
End Option X
312+51
RT EOP
LT EOP
5%
0%
302+50 2%
-2% 303+00
312+51
-2%
5%
0%
-5%-5% of pavement
Proposed edge
E: 792202.96
N: 27165715.29
Entrance Road
End Visitor Center
End Option X
312+51 P la c e
P r o te c t in x
C M
P
E x is ti n g D u a l
125+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
,3
.1
V P I
E L
,3
.9
V P I
E L
,3
.4
,3
.4
SSD = 379
K = 13
40' VC
60' VC
K = 12-1.80%
D3
200'100'0
Scale in Feet
Existing ground
400+00 401+00
R=35'
R=35'
402+00
400+75
Profile grade
400+75
HCL Black Canyon Road
HCL Visitor Center Entrance Road
E: 792264.42
N: 27165746.38
Black Canyon Road
Begin Schedule A
400+40
E: 792357.33
N: 27165793.39
Black Canyon Road
End Schedule A
401+45
BLACK CANYON ROAD - SCHEDULE A
Black Canyon Road
Begin Schedule A
400+40
Black Canyon Road
End Schedule A
401+45 of pavement
Proposed edge
3335333533353335
33353335
3335333533353335
33353335
3340334033403340 33403340
3340 3340 3340
3340334033403340 33403340
3340 3340 3340
Curve = P_US93_TRL-1
PI 500+30.57
D
R = 50.00'
T = 30.57'
L = 54.87'
Curve = P_US93_TRL-2
PI 503+55.77
D
R = 125.00'
T = 15.41'
L = 30.66'
400+00
401+00
402+00
0500+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
,3
.6
V P I
E L
,3
.6
-0.062% +0.064%
100' VC
V P I
E L
,3
.7
+0.064% -0.334%
100' VC
,3
.4
500+00 500+50 501+00 501+50 502+00 502+50 503+00 503+50 504+00
100'50'0
Scale in Feet
D4
Existing edge of trail
Existing ground
HCL Trail
HCL US93 South
Proposed edge of trail
HCL Black Canyon Road
E: 792255.38
N: 27165889.02
Black Canyon Trail
Begin Schedule A
500+00
E: 792066.88
N: 27166197.53
Black Canyon Trail
End Schedule A
503+71
Proposed grade
BLACK CANYON TRAIL - SCHEDULE A
Black Canyon Trail
End Schedule A
503+71
Black Canyon Trail
Begin Schedule A
500+00
Curve = P_US93_VC-1
PI 289+82.39
D
R = 300.00'
T = 32.00'
L = 63.77'
Curve = P_US93_VCP-1
PI 906+84.22
D
R = 42.02'
T = 499.46'
L = 124.96'
Curve = P_US93_VCP-2
PI 904+55.58
D
R = 100.00'
T = 38.66'
L = 73.77'
P O
T
.0
P C
.7
P T
.7
P C
.9
P T
.7
P O
T
.4
PC
.3
P T
.1
33103310
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P U
S .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
NV NV FLAP US93(1)
B
A
G
D J
K
L
M
R
N
R
O
P
Q
R
S
T
U
V
W
X
AA
AC
Y
Z
AB
AD
AE
AG
R
R
R
R
R
35'R
Existing edge of gravel
Parking Area
HCL Visitor Center
Prosposed edge of pavement
D5
40'20'0
Scale in Feet
AF
(do not disturb)
Existing pull box
67.5'R
.5 'R
Existing water (do not disturb)
AHAI
AJ
AK
H
I
End Trail, match existing
901+72, 28 RT
End Trail, match existing
901+47, 30 LT
NOTE:
to verify utility location prior to construction.
Utilities shown are from best available data. Contractor 2.
See sheet D06 for location and elevation information.1.
existing.
elevation to match
Along curb, proposed
P…