About this file
This is a Notice to Bidders document issued by the Texas Department of Transportation (TxDOT) Aviation Division for airport pavement rehabilitation improvements at Gillespie County Airport in Fredericksburg, Texas. The project encompasses design and construction of pavement rehabilitation work, with all labor, materials, and equipment to be provided by the successful bidder in accordance with engineering specifications. A mandatory pre-bid conference is scheduled for February 12, 2026, at 10:00 AM at Gillespie County Airport, Conference Room, 191 Airport Road, Fredericksburg, Texas 78624. Sealed bids must be submitted by 1:00 PM on March 12, 2026, to Sheri Quinlan at TxDOT Aviation Division, 6230 E. Stassney Lane, 2nd Floor, Austin, Texas 78744. Project documents are available for review at Garver, 3755 S Capital of Texas Hwy #325, Austin, Texas 78704, with plan sets available at no cost through TxDOT's Plans Online portal. Technical inquiries should be directed to Philip Huntley, P.E., at 512-485-0026, and administrative questions to Sheri Quinlan, Contract Specialist, at 512-416-4500.
The Engineer's Estimate of Probable Cost for the base bid is $3,475,555.00, with four additive alternates valued at $416,125.00, $427,275.00, $373,840.00, and $626,420.00, respectively, for a total potential contract value of up to $5,319,215.00. Each bid must be accompanied by a bid bond or cashier's check equal to two percent of the total bid price. The successful bidder must furnish Performance and Payment Bonds in the full amount of the contract price. There are no set-aside designations or restrictions limiting bidder eligibility; however, the project establishes a Disadvantaged Business Enterprise (DBE) goal of zero percent. Bidders must submit required certifications regarding debarment status and Buy American compliance, along with a DBE Participation Plan within five calendar days of bid opening. All bidders must comply with predetermined minimum wage rates as specified in the project specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ntb2614fredb00061ad2.pdf | ||
| ntb2614fredb00061.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o o o o
GI-002
MCC
PJH
Fi le
:L :\2
3\
A0
T8
Ai rfi el d Pa ve m en t R eh ab
\D ra w in gs \T
_P
VM
T-
G I-0
.d w g
L as t S av e:
2/
/2
:3
AM
La st s av ed b y:
O
R D oc ke ry La st p lo tte d by
:D oc ke ry
, O liv ia R
.P lo t S ty le :A
EC
m on o.
ct b
Pl ot
S ca le :1
:1 Pl ot D at e:
2/
/2
:3
AM
Pl ot te r u se d:
D
W G
T o
PD
F.
pc
DRAWN BY:
DATE:
JOB NO.:
DESIGNED BY:
R
EV
D
AT
E
D
ES
C R
IP
TI
O N
BY
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS SHEET,
ADJUST SCALES ACCORDINGLY.
0 1"
DRAWING NUMBER
SHEET
NUMBER
JULY 2025
23A06150
THIS DOCUMENT, ALONG WITH THE
IDEAS AND DESIGNS CONVEYED
HEREIN, SHALL BE CONSIDERED
INSTRUMENTS OF PROFESSIONAL
SERVICE AND ARE PROPERTY OF
GARVER, LLC. ANY USE,
REPRODUCTION, OR DISTRIBUTION
OF THIS DOCUMENT, ALONG WITH
THE IDEAS AND DESIGN CONTAINED
HEREIN, IS PROHIBITED UNLESS
AUTHORIZED IN WRITING BY
GARVER, LLC OR EXPLICITLY
ALLOWED IN THE GOVERNING
PROFESSIONAL SERVICES
AGREEMENT FOR THIS WORK.
© 2025 GARVER, LLC
G
IL
LE
SP
IE
C
O U
N
TY
AI
R
PO
R
T
FR
ED
ER
IC
KS
BU
R
G , T
X
AI
R
FI
EL
D P
AV
EM
EN
T
R
EH
AB
IL
IT
AT
IO
N
REGISTRATION NO.
F-5713
BASE BID - SCHEDULE 1
ADD ALT 4 - SCHEDULE 1:
TERMINAL APRON PAVEMENT
RECONSTRUCTION (WEST TAXILANE)
ADD ALT 1:
RUNWAY 14-32 REHABILITATION
SHEET INDEX
GENERAL
1 GI-001 COVER SHEET
2 GI-002 SHEET INDEX AND SUMMARY OF QUANTITIES
3 GI-101 PROJECT LAYOUT PLAN
4 GI-201 SURVEY CONTROL PLAN
5 GC-001 CONSTRUCTION SAFETY AND PHASING NOTES 1
6 GC-002 CONSTRUCTION SAFETY AND PHASING NOTES 2
7 GC-100 CONSTRUCTION SAFETY AND PHASING PLAN - OVERVIEW
8 GC-101 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 1
9 GC-102 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 2
10 GC-103 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 3
11 GC-104 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 4
12 GC-105 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 5
13 GC-106 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 6
14 GC-107 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 7
15 GC-108 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 8
16 GC-109
CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 9
(ADD. ALT. 1)
17 GC-501 CONSTRUCTION SAFETY AND PHASING DETAILS
GEOTECHNICAL
18 BL-101 BORING LOCATION PLAN
CIVIL
19 CV-100 EXISTING CONDITIONS OVERVIEW
20 CV-101 EXISTING CONDITIONS 1
21 CV-102 EXISTING CONDITIONS 2
22 CV-103 EXISTING CONDITIONS 3
23 CE-001 EROSION CONTROL NOTES
24 CE-100 EROSION CONTROL OVERVIEW
25 CE-101 EROSION CONTROL PLAN 1
26 CE-102 EROSION CONTROL PLAN 2
27 CE-103 EROSION CONTROL PLAN 3
28 CE-501 EROSION CONTROL DETAILS
29 CD-100 DEMOLITION PLAN OVERVIEW
30 CD-101 DEMOLITION PLAN 1
31 CD-102 DEMOLITION PLAN 2
32 CD-103 DEMOLITION PLAN 3
33 CD-501 DEMOLITION DETAILS
34 CP-001 TYPICAL SECTIONS 1
35 CP-002 TYPICAL SECTIONS 2
36 CP-100 PLAN AND PROFILE - OVERVIEW
37 CP-101 PLAN AND PROFILE 1 - TW A CONNECTOR
38 CP-102 PLAN AND PROFILE 2
39 CP-103 PLAN AND PROFILE 3
40 CP-104 PLAN AND PROFILE 4
41 CP-105 PLAN AND PROFILE 5
42 CP-106 PLAN AND PROFILE 6
43 CP-107 PLAN AND PROFILE 7
44 CP-108 PLAN AND PROFILE 8 - TW B
45 CP-109 PLAN AND PROFILE 9 - TW C
46 CP-110 PLAN AND PROFILE 10 - TW D
47 CP-111 TERMINAL APRON ELEVATION PLAN (BASE BID & ADD ALT 3)
48 CP-112 TERMINAL APRON (ADD ALT 4) ELEVATION PLAN
49 CP-113 PAVEMENT REHABILITATION PLAN 1
50 CP-114 PAVEMENT REHABILITATION PLAN 2
51 CP-115 PAVEMENT REHABILITATION PLAN 3
52 CP-501 PAVING DETAILS
53 CM-100 PAVEMENT MARKING PLAN OVERVIEW
54 CM-101 PAVEMENT MARKING REMOVAL PLAN
55 CM-102 PAVEMENT MARKING PLAN 1
56 CM-103 PAVEMENT MARKING PLAN 2
57 CM-104 PAVEMENT MARKING PLAN 3
58 CM-105 PAVEMENT MARKING PLAN 4
59 CM-106 PAVEMENT MARKING PLAN 5
60 CM-107 PAVEMENT MARKING PLAN 6
61 CM-108 PAVEMENT MARKING PLAN 7
62 CM-501 PAVEMENT MARKING DETAILS 1
63 CM-502 PAVEMENT MARKING DETAILS 2
64 CM-503 PAVEMENT MARKING DETAILS 3
ELECTRICAL
65 EN001 ELECTRICAL NOTES
66 ED101 ELECTRICAL REMOVAL PLAN
67 ED501 ELECTRICAL REMOVAL DETAILS
68 EL101 ELECTRICAL INSTALLATION PLAN
69 EL501 ELECTRICAL INSTALLATION DETAILS 1
70 EL502 ELECTRICAL INSTALLATION DETAILS 2
71 EL503 ELECTRICAL INSTALLATION DETAILS 3
CROSS SECTIONS
72 XS-101 TAXIWAY A CROSS SECTIONS 1
73 XS-102 TAXIWAY A CROSS SECTIONS 2
74 XS-103 TAXIWAY A CROSS SECTIONS 3
75 XS-104 TAXIWAY A CROSS SECTIONS 4
76 XS-105 TAXIWAY A CROSS SECTIONS 5
77 XS-106 TAXIWAY A CROSS SECTIONS 6
78 XS-107 TAXIWAY A CROSS SECTIONS 7
79 XS-108 TAXIWAY A CROSS SECTIONS 8
80 XS-109 TAXIWAY A CROSS SECTIONS 9
81 XS-110 TAXIWAY A CROSS SECTIONS 10
82 XS-111 TAXIWAY A CROSS SECTIONS 11
83 XS-112 TAXIWAY A CROSS SECTIONS 12
84 XS-113 TAXIWAY A CROSS SECTIONS 13
85 XS-114 TAXIWAY A CROSS SECTIONS 14
86 XS-115 TAXIWAY A CROSS SECTIONS 15
87 XS-116 TAXIWAY A CROSS SECTIONS 16
88 XS-117 TAXIWAY A CROSS SECTIONS 17
AD
D
EN
D
U M
PG
H 2/
/2
BASE BID - SCHEDULE 2
ADD ALT 2 - SCHEDULE 1:
TDG 2B PAVEMENT FILLETS AT
TAXIWAY A AND D RUNWAY APPROACH
ADD ALT 2 - SCHEDULE 2:
TDG 2B PAVEMENT FILLETS AT
TAXIWAY A AND D RUNWAY APPROACH
ADD ALT 3 - SCHEDULE 1:
TERMINAL APRON PAVEMENT REHABILIZATION
(NORTH PORTION) (RECONSTRUCTION)
ADD ALT 3 - SCHEDULE 2:
TERMINAL APRON PAVEMENT REHABILIZATION
(NORTH PORTION) (RECONSTRUCTION)
ADD ALT 4 - SCHEDULE 2:
TERMINAL APRON PAVEMENT
RECONSTRUCTION (WEST TAXILANE)
Digitally Signed 02/26/2026
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
R
SA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
R
SA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
R O
FA
R O
FA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
R O
FA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TSA
TSATSA
TSATSA
TSATSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TS
A
TS
A
TOFA
TOFA
TO
FA
TO
FA
TSA
TSA
TSA
TSA
TOFA
TOFA
TOFA
TOFA
TSA
TSA TSA
TSA
FFFFFFFFFFFAFAAA
RAAFAFA OF OF RORORRATSTTSTSSASAAA
ATTTOTOOFOOFOFFAFAAA
OOOOOOOOORRRRRRRRR
RRR
AASASA TSA TSA TSTSTSTSTT
TAAAAAAAA OFA OFA OF OF TOF TOF TTTTOAAAAA
RROROOFOFFAFAAAAA
OORROROOAAAAFAFA OO
TSTSTSTSSASAAA
TTTSTSTSATSAAAA
TOTTOFTOOFAOFAAAAAFOTTTT A
TTTOTOTOFTOFFAFAFAFATTTTTSTSTSTSSSSS
TTTTTTTTTSTSTTTSSSSTSTSTSTSTTTTTTTTTTTTTTTTSSSSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTSSSSSSSSSSSSSSSSSTTTTTTTTTSTTTTTTSTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTSASASSSSSASAAA TSA
TSATSATTTTTTT TOTOTOT
TTTOFT FAFA
AAAA
TTTOTOTO
SAA TSA TSA
TSTSTSTSATSAA
AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAOFFFFFFFAAAAAAAAAAAAAAAAAAAAAAAAAAAA
FAFAFAFAFAFAAAAAAAAAOOOFOFOFOF
OOOOOOOFOFFAAFRRROROOOOOOOOORRRRRRRR
RR
FFFFFFFFFAFOOOFOFFFOOOOOOOOFFFOOFFFFFFFFFFAFFFFFFFOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOORR
RRORRR
AA
FAFA OF OF OORRR
AA
TOFAAAAA
FFFAAFA
TT
OOO TTTTT
TTTSAT AAATOOOFAOFAAASASAAAAAAA
AAAAAA TTTTOFOFOFAAAAOFAOO
T
OO TTTT
TOFAAAAATOFA
TAFFFAAFAOO TTTTT
TOFA
OFF TOTO
TSSASAAAAAAFAFAA AA TSA TSA TT
TTTT
SASA TSA TSA OOOFFFA OOOF TTTOOOF TOOOF TTTST
AA OFAFA TOF TOF TOAA
TTT
TTTOFTOFAFA
SS AAAFAFAFAF A TSASA
TTTTTT
TOFA OFA OTOO
TTOFA
TTTTT
RRRRSAAASASASAASAASAAAAAAAASAAAAAAAAAAAAAAAAAAAAAAARRRRRRRRRRSRRSSS
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
SSSSSAAAAAAAAAAAAAAAAAAAAAAAAAAAA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
DRAWN BY:
DATE:
JOB NO.:
DESIGNED BY:
R
EV
D
AT
E
D
ES
C R
IP
TI
O N
BY
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS SHEET,
ADJUST SCALES ACCORDINGLY.
0 1"
DRAWING NUMBER
SHEET
NUMBER
JULY 2025
23A06150
THIS DOCUMENT, ALONG WITH THE
IDEAS AND DESIGNS CONVEYED
HEREIN, SHALL BE CONSIDERED
INSTRUMENTS OF PROFESSIONAL
SERVICE AND ARE PROPERTY OF
GARVER, LLC. ANY USE,
REPRODUCTION, OR DISTRIBUTION
OF THIS DOCUMENT, ALONG WITH
THE IDEAS AND DESIGN CONTAINED
HEREIN, IS PROHIBITED UNLESS
AUTHORIZED IN WRITING BY
GARVER, LLC OR EXPLICITLY
ALLOWED IN THE GOVERNING
PROFESSIONAL SERVICES
AGREEMENT FOR THIS WORK.
© 2025 GARVER, LLC
G
IL
LE
SP
IE
C
O U
N
TY
AI
R
PO
R
T
FR
ED
ER
IC
KS
BU
R
G , T
X
AI
R
FI
EL
D P
AV
EM
EN
T
R
EH
AB
IL
IT
AT
IO
N
REGISTRATION NO.
F-5713
TAXIWAY A
NORTH GA APRON
TERMINAL APRON
FUEL PUMPS
AIRPORT RD
FAIR DR
SELF-SERVICE
FUEL FARM
RUNWAY 14-32
TERMINAL
TI
VY
DA
LE
R D
HIG
HW
AY 16
0'
0'
.0
0'
1'
Fi le
:L :\2
3\
A0
T8
Ai rfi el d Pa ve m en t R eh ab
\D ra w in gs \T
_P
VM
T-
G C
-1
.d w g L as t S av e:
2/
/2
9:
A
M La st s av ed b y:
O R
D oc ke ry
La st p lo tte d by :D oc ke ry , O liv ia
R .P lo t S ty le
:A
EC
m on o.
ct b Pl ot S ca le
:1 :1
Pl ot
D at e:
2/
/2
9:
A M
Pl ot te r u se d:
D W
G T o
PD
F.
pc
LEGEND
PERFORM FULL-DEPTH RECLAMATION AND INSTALL PAVEMENT MARKINGS.
**PENDING ADD. ALT. 2 AWARD: CONSTRUCT ASPHALT PAVEMENT AND GRADING
(IN FEET)
0 100' 200' 400' 600'
PHASE 1 WORK AREA
NOTES:
1. PRINT NOTE: SHEET SHALL BE PRINTED IN COLOR.
2. SEE CONSTRUCTION SAFETY AND PHASING NOTES FOR
ADDITIONAL INFORMATION.
3. LIGHTED BARRICADES SHOWN ARE FOR GRAPHIC PURPOSES
ONLY. THE CONTRACTOR SHALL DETERMINE THE QUANTITY OF
LIGHTED BARRICADES REQUIRED TO COMPLETE THE WORK AS
SHOWN AND MUST BE IN ACCORDANCE WITH CURRENT FAA
ADVISORY CIRCULARS.
4. CONTRACTOR SHALL HAVE AN APPROVED PAVEMENT BROOM OR
VACUUM TRUCK AVAILABLE ON SITE AT ALL TIMES. HYDRANTS TO
FILL VACUUM TRUCK WILL BE AVAILABLE ON AIRPORT PROPERTY.
5. IN NO EVENT SHALL CONSTRUCTION VEHICLES, EQUIPMENT, OR
MATERIALS BE PARKED/STORED WITHIN 50' OF BARRICADES OR
ACTIVE AIRFIELD PAVEMENT.
6. ON NORTH APRON, CONTRACTOR TO MAINTAIN TENANT ACCESS
TO AIRCRAFT HANGARS.
7. ON THE TERMINAL APRON, CONTRACTOR SHALL MAINTAIN
ACCESS TO SELF-SERVICE FUEL PUMPS. CONTRACTOR TO
COORDINATE WITH AIRPORT MANAGER AND FBO MANAGER TO
MAINTAIN ACCESS TO FBO HANGARS DURING CONSTRUCTION.
8. VEHICULAR TRAFFIC SHALL ALWAYS YIELD TO AIRCRAFT TRAFFIC.
9. FOR RUNWAY CLOSURES, COORDINATE IN ADVANCE WITH
AIRPORT AND AVOID PEAK TRAFFIC TIMES. AIRPORT TRAFFIC
PEAK TIMES ARE THURSDAY THROUGH SUNDAY.
10. SHOULD ADDITIVE ALTERNATE 1 & 2 BE AWARDED CONTRACTOR
HAS OPTION TO INCORPORATE TAXIWAY CONNECTOR FILLET
CONSTRUCTION INTO PHASE 9 RUNWAY CLOSURES.
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREAROFA
RSA
ITEMS OF WORK
CALENDAR DAYS
CONTRACT TIME
0 40 80 120 160 200
PHASE 6
(20 DAYS)
PHASE 5
(5 DAYS)
PHASE 4
(10 DAYS)
PHASE 3
(40 DAYS)
PHASE 2
(60 DAYS)
PHASE 1
(30 DAYS)
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREATOFA
TSA
PHASE 2 WORK AREA
PHASE 3A & 3B WORK AREA
PHASE 4 WORK AREA
PHASE 5 WORK AREA
PHASE 6 WORK AREA
PHASE 7 WORK AREA
PHASE 8 WORK AREA
PERFORM FULL-DEPTH RECLAMATION AND INSTALL PAVEMENT MARKINGS.
INSTALL DETENTION POND SLOPE STABILIZATION.2
3A
PERFORM CRACK SEALING, APPLY SEAL COAT, AND INSTALL PAVEMENT
MARKINGS.
PERFORM FULL DEPTH RECONSTRUCTION AND INSTALL PAVEMENT MARKINGS.6
PERFORM CRACK SEALING, APPLY SEAL COAT, AND INSTALL PAVEMENT MARKINGS.
PENDING ADD. ALT. 3 AND/OR 4 AWARD: PERFORM FULL DEPTH RECONSTRUCTION
AND AIRCRAFT TIE-DOWNS.
PERFORM CRACK SEALING, APPLY SEAL COAT, AND INSTALL PAVEMENT
MARKINGS.
PERFORM CRACK SEALING, APPLY SEAL COAT, AND INSTALL PAVEMENT
MARKINGS.
PERFORM FULL DEPTH RECONSTRUCTION AND INSTALL PAVEMENT MARKINGS.2
PERFORM CRACK SEALING, APPLY SEAL COAT, AND INSTALL PAVEMENT
MARKINGS.
GC-100
MCC
PJH
TW
A
TW
B
TW
C
TW
D
HANGAR AREA
NOTES:
1. PRIOR TO PERMANENT MARKING APPLICATION, CONTRACTOR SHALL ALLOW 30
DAYS FOR CURING OF ASPHALT PAVEMENT. TEMPORARY MARKINGS SHALL BE
APPLIED PRIOR TO OPENING WORK AREAS TO TRAFFIC.
2. SHOULD ADDITIVE ALTERNATE 3 OR 4 BE AWARDED, CONTRACTOR SHALL BE
ALLOTTED 30 CALENDAR DAYS TO COMPLETE PHASE 5 OF CONSTRUCTION.
PHASE 5 SHALL BE COMPLETED SIMULTANEOUSLY WITH PHASE 2. NO
ADDITIONAL CONSTRUCTION TIME WILL BE PROVIDED.
1 PERFORM CRACK SEALING, APPLY SEAL COAT, AND INSTALL PAVEMENT
MARKINGS.
PERFORM FULL-DEPTH RECLAMATION AND INSTALL PAVEMENT MARKINGS.
**PENDING ADD. ALT. 2 AWARD: CONSTRUCT ASPHALT PAVEMENT AND GRADING
**NOTE: ALL WORK TO BE COMPLETED PAST EXISTING HOLD SHORT MARKING LOCATIONS OR
WITHIN RSA LIMITS SHALL BE COMPLETED DURING NIGHT TIME WORK, OR AS COORDINATED WITH
AIRPORT MANAGEMENT THROUGH DAILY DAYTIME HOUR CLOSURES, WITH RUNWAY CLOSURES.
PHASE 9 ONLY REQUIRES RUNWAY CLOSURES.
PENDING ADD ALT 2 AWARD:
PAVEMENT FILLET - NIGHT WORK
PENDING ADD ALT 2 AWARD:
PAVEMENT FILLET - NIGHT WORK
PHASE 7
(5 DAYS)
PHASE 8
(5 DAYS)
FULL DEPTH RECONSTRUCTION AND INSTALL PAVEMENT MARKINGS.3B
ALTERNATIVE ACCESS ROUTE
C R
O
SS
W
IN
D L
N
PRIMARY ACCESS ROUTE
ALTERNATE STAGING AREA.
SEE PHASING SHEETS FOR USAGE.
PRIMARY STAGING AREA
SP
ES
EP
STOCKPILE LOCATION
EMPLOYEE PARKING
EQUIPMENT STORAGE
STAGING AREA
CONTRACTOR TO INSTALL TEMPORARY
CONSTRUCTION ENTRANCE. SEE EROSION
CONTROL PLANS FOR MORE INFORMATION.
CONTRACTOR TO INSTALL TEMPORARY
CONSTRUCTION ENTRANCE. SEE EROSION
CONTROL PLANS FOR MORE INFORMATION.
BUSINESS CT
9 **PENDING ADD. ALT. 1 AWARD: PERFORM CRACK SEALING, APPLY SEAL COAT,
AND INSTALL PAVEMENT MARKINGS.
PHASE 9 WORK AREA (ADD. ALT. 1)
PHASE 9
(15 DAYS)
AD
D
EN
D
U M
PG
H 2/
/2
PAVEMENT DEMOLITION NOTES:
1. CONTRACTOR WILL BE PAID FOR THE SQUARE YARD OF ASPHALT
PAVEMENT REMOVED UNDER SS-140 TO THE TOP OF PROPOSED
SUBGRADE.
2. ALL DRAINAGE STRUCTURES AND MATERIAL DEMOLISHED SHALL BE
REMOVED FROM THE SITE WITH PAYMENT CONSIDERED SUBSIDIARY TO
SS-140.
3. THE CONTRACTOR SHALL ENSURE A CLEAN AND STRUCTURALLY SOUND
JOINT FACE AT THE EDGE OF ALL REMOVED PAVEMENT. ALL WORK,
MATERIAL AND EQUIPMENT (SAW CUT, JOINT SPALL REPAIR, ETC.)
NECESSARY TO ACHIEVE THIS WILL NOT BE MEASURED FOR SEPARATE
PAYMENT BUT WILL BE CONSIDERED SUBSIDIARY TO SS-140.
4. THICKNESSES AND TYPES OF MATERIALS FOR ASPHALT SECTIONS ARE
APPROXIMATE. VARIATIONS OF EXISTING PAVEMENT SECTIONS ON-SITE
SHALL NOT BE A BASIS FOR ADDITIONAL PAYMENT. SEE SHEET BL-101 AND
BORING INFORMATION IN THE GEOTECHNICAL REPORT FOR MORE
INFORMATION.
5. ALL PAVEMENT REMOVED SHALL BECOME PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED AND DISPOSED OF OFF AIRPORT
PROPERTY AT THE CONTRACTOR'S OWN EXPENSE.
6. CONTRACTOR SHALL PROTECT ALL UTILITIES, DRAINAGE FACILITIES, AND
AIRPORT FACILITIES THAT ARE TO REMAIN DURING CONSTRUCTION.
CONTRACTOR SHALL PERFORM THE WORK IN SUCH A MANNER AS NOT TO
DAMAGE THE EXISTING UTILITIES. ANY DAMAGE TO THESE UTILITIES
ARISING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED
IMMEDIATELY AND AT NO COST TO THE OWNER.
7. DAMAGE TO EXISTING PAVEMENT TO REMAIN SHALL REQUIRE THE
CONTRACTOR TO CUT A CLEAN VERTICAL EDGE BEYOND THE DAMAGE AND
REMOVE AND REPLACE THE ADDITIONAL PAVEMENT AT NO COST TO THE
OWNER. REMOVAL LIMITS SHALL BE APPROVED BY THE ENGINEER.
8. MISCELLANEOUS STRUCTURES EXISTING WITHIN PAVEMENT DEMOLITION
EXTENTS, INCLUDING, BUT NOT LIMITED TO BOLLARDS AND AIRCRAFT
TIE-DOWNS, ARE SUBSIDIARY TO PAVEMENT REMOVAL.
UNDERGROUND UTILITIES NOTE:
9. UNDERGROUND UTILITIES EXIST WITHIN AND ADJACENT TO THE LIMITS OF
CONSTRUCTION. AN ATTEMPT HAS BEEN MADE TO LOCATE THESE
UTILITIES ON THE PLANS. HOWEVER, ALL EXISTING UTILITIES MAY NOT BE
SHOWN AND THE ACTUAL LOCATIONS OF THE UTILITIES MAY VARY FROM
THE LOCATIONS SHOWN. PRIOR TO BEGINNING ANY TYPE OF EXCAVATION,
THE CONTRACTOR SHALL CONTACT THE UTILITIES INVOLVED AND MAKE
ARRANGEMENTS FOR THE LOCATION OF THE UTILITIES ON THE GROUND.
THE CONTRACTOR SHALL MAINTAIN THE UTILITY LOCATION MARKINGS
UNTIL THEY ARE NO LONGER NECESSARY.
TEXAS STATE LAW, THE UNDERGROUND FACILITIES DAMAGE PREVENTION
ACT, REQUIRES TWO WORKING DAYS ADVANCE NOTIFICATION THROUGH
THE ONE-CALL SYSTEM CENTER BEFORE EXCAVATING USING MECHANIZED
EQUIPMENT OR EXPLOSIVES (EXCEPT IN THE CASE OF AN EMERGENCY).
THE ONE-CALL SYSTEM PHONE NUMBER IS 1-800-344-8377. THE
CONTRACTOR IS ADVISED THAT THERE IS A SEVERE PENALTY FOR NOT
MAKING THIS CALL. NOT ALL UTILITY COMPANIES ARE MEMBERS OF THE
TEXAS ONE-CALL SYSTEM; THEREFORE, THE CONTRACTOR IS ADVISED TO
CONTACT ALL NON-MEMBER UTILITIES AS WELL AS THE ONE-CALL SYSTEM.
PAVEMENT DEMOLITION NOTES:
1. PAVEMENT SECTION REMOVAL IS THE REMOVAL OF ALL MATERIAL TO THE
SPECIFIED DEPTH (E.G. 22" PAVEMENT SECTION REMOVAL) REGARDLESS OF
WHAT TYPE OF MATERIAL (CONCRETE, ASPHALT, BASE, SUBGRADE, ETC.) IS
ENCOUNTERED. SEE BL-101 AND GEOTECHNICAL REPORT PLANS FOR BORING
LOGS.
2. EXCAVATION NEEDED BETWEEN THE REMOVED PAVEMENT SECTION MATERIAL
AND THE TOP OF THE PROPOSED LIME TREATMENT LAYER SHALL BE PAID FOR
UNDER P-152 UNCLASSIFIED EXCAVATION AS SHOWN IN THE PAVEMENT
DEMOLITION DETAILS. CONTRACTOR WILL BE PAID FOR THE SQUARE YARDS OF
PAVEMENT SECTION REMOVED MEASURED FROM THE EXISTING SURFACE PLUS
THE PLAN QUANTITY FOR P-152 "UNCLASSIFIED EXCAVATION" REGARDLESS OF
MATERIAL OR DEPTH ENCOUNTERED.
3. ANY PAVING FABRIC ENCOUNTERED WITHIN THE EXISTING SECTION WILL NOT
BE PAID FOR SEPARATELY, BUT CONSIDERED SUBSIDIARY TO SS-140.
4. CONTRACTOR TO SAWCUT FULL DEPTH PAVEMENT AT LIMITS OF DEMOLITION.
CONTRACTOR TO PROTECT EDGE FROM SPALLS PRIOR TO INSTALLATION OF
PROPOSED PAVEMENT. THERE WILL BE NO SEPARATE PAYMENT FOR REPAIR.
5. IN AREAS UNDER PROPOSED PAVEMENT, IF BASE IS ENCOUNTERED BELOW THE
PAVEMENT SECTION REMOVAL, THE BASE SHALL BE REMOVED TO THE BOTTOM
OF THE EXISTING PAVEMENT SECTION. REMOVAL OF THIS MATERIAL WILL BE
PAID FOR UNDER P-152 UNCLASSIFIED EXCAVATION.
EXISTING PROPOSED
ASPHALT
PAVEMENT SECTION
REMOVAL LIMITS
UNCLASSIFIED
EXCAVATION
VARIES 2"-5" EXISTING
ASPHALT PAVEMENT
VARIES 6"- 8"
EXISTING BASE
COURSE
EXISTING
SUBGRADE
SCALE: NONE
CD-501
FULL DEPTH PAVEMENT SECTION REMOVAL DETAIL
SCALE: NONE
CD-501
ASPHALT REMOVAL DETAIL
EX
IS
TI
N
G P
AV
EM
EN
T
PR
O
PO
SE
D P
AV
EM
EN
T
6"
INITIAL SAWCUT
INITIAL ASPHALT PAVEMENT
TO BE REMOVED
INITIAL SAWCUT FOLLOWING INITIAL
ASPHALT REMOVAL JUST PRIOR TO NEW
ASPHALT PAVEMENT SECTION
INSTALLATION
EXISTING ASPHALT
PAVEMENT TO REMAIN
FINAL PORTION OF ASPHALT
PAVEMENT TO BE REMOVED
COMPACTED SUBGRADE
4" HMAC (TX-341) (2) - 2" LIFTS
6" HMAC (TX-341 TYPE B)
(2) - 3" LIFTS
TACK COAT
DRAWN BY:
DATE:
JOB NO.:
DESIGNED BY:
R
EV
D
AT
E
D
ES
C R
IP
TI
O N
BY
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS SHEET,
ADJUST SCALES ACCORDINGLY.
0 1"
DRAWING NUMBER
SHEET
NUMBER
JULY 2025
23A06150
THIS DOCUMENT, ALONG WITH THE
IDEAS AND DESIGNS CONVEYED
HEREIN, SHALL BE CONSIDERED
INSTRUMENTS OF PROFESSIONAL
SERVICE AND ARE PROPERTY OF
GARVER, LLC. ANY USE,
REPRODUCTION, OR DISTRIBUTION
OF THIS DOCUMENT, ALONG WITH
THE IDEAS AND DESIGN CONTAINED
HEREIN, IS PROHIBITED UNLESS
AUTHORIZED IN WRITING BY
GARVER, LLC OR EXPLICITLY
ALLOWED IN THE GOVERNING
PROFESSIONAL SERVICES
AGREEMENT FOR THIS WORK.
© 2025 GARVER, LLC
G
IL
LE
SP
IE
C
O U
N
TY
AI
R
PO
R
T
FR
ED
ER
IC
KS
BU
R
G , T
X
AI
R
FI
EL
D P
AV
EM
EN
T
R
EH
AB
IL
IT
AT
IO
N
REGISTRATION NO.
F-5713
CD-501
MCC
PJH
Fi le
:L :\2
3\
A0
T8
Ai rfi el d Pa ve m en t R eh ab
\D ra w in gs \T
_P
VM
T-
C D
-2
.d w g L as t S av e:
2/
/2
6:
P
M La st s av ed b y:
O R
D oc ke ry
La st p lo tte d by :D oc ke ry , O liv ia
R .P lo t S ty le
:A
EC
m on o.
ct b Pl ot S ca le
:1 :1
Pl ot
D at e:
2/
/2
6:
P M
Pl ot te r u se d:
D W
G T o
PD
F.
pc
AD
D
EN
D
U M
PG
H 2/
/2
1.0' (TYP)
EXISTING CONCRETE
HELIPAD PAVEMENT
EXISTING BASE COURSE.
DO NOT DISTURB.
EXISTING SUBGRADE.
DO NOT DISTURB.
4" ASPHALT SURFACE
COURSE (TXDOT 341)
20" CRUSHED AGGREGATE
BASE COURSE (TXDOT 247)
SCALE: NONE
1A
CP-002
APRON SECTION DETAIL
SEE PLAN AND PROFILE SHEETS
EXISTING
HELIPAD
VARIES
SCALE: NONE
CP-002
APRON TYPICAL SECTION
1A
CP-002
EXISTING APRON
MATCH EXISTING GRADE
VARIESVARIES
PRIME COAT
SCALE: NONE
CP-002
PROPOSED FILLET PAVEMENT SECTION
CONCRETE TO ASPHALT JOINT.
SEE DETAIL 3, SHEET CP-501.
SCALE: NONE
CP-002
PHASE 3B FULL DEPTH PAVEMENT SECTION DETAIL
COMPACTED SUBGRADE
COMPACT EXISTING
SUBGRADE
20" CRUSHED AGGREGATE
BASE COURSE (TXDOT 247)
GEOGRID
PRIME COAT
TACK COAT
4" ASPHALT SURFACE
COURSE (TXDOT 341)
(2) - 2" LIFTS
4" HMAC (TX-341) (2) - 2" LIFTS
6" HMAC (TX-341 TYPE B)
(2) - 3" LIFTS
TACK COAT VARIES2.0'
SCALE: NONE
CP-002
ADD ALT 2 FILLET TYPICAL SECTION
2.0% MAX
10% MAX
2.0% MAX
5.0%
EXISTING
TAXIWAY
CONNECTOR
CD-501
GEOGRID
COMPACT EXISTING
SUBGRADE
9" COMPACTED FDR TRIMMINGS
GEOGRID
PRIME COAT
TACK COAT
4" ASPHALT SURFACE
COURSE (TXDOT 341)
(2) - 2" LIFTS
ALTERNATIVE SECTION
DRAWN BY:
DATE:
JOB NO.:
DESIGNED BY:
R
EV
D
AT
E
D
ES
C R
IP
TI
O N
BY
BAR IS ONE INCH ON
ORIGINAL DRAWING
IF NOT ONE INCH ON THIS SHEET,
ADJUST SCALES ACCORDINGLY.
0 1"
DRAWING NUMBER
SHEET
NUMBER
JULY 2025
23A06150
THIS DOCUMENT, ALONG WITH THE
IDEAS AND DESIGNS CONVEYED
HEREIN, SHALL BE CONSIDERED
INSTRUMENTS OF PROFESSIONAL
SERVICE AND ARE PROPERTY OF
GARVER, LLC. ANY USE,
REPRODUCTION, OR DISTRIBUTION
OF THIS DOCUMENT, ALONG WITH
THE IDEAS AND DESIGN CONTAINED
HEREIN, IS PROHIBITED UNLESS
AUTHORIZED IN WRITING BY
GARVER, LLC OR EXPLICITLY
ALLOWED IN THE GOVERNING
PROFESSIONAL SERVICES
AGREEMENT FOR THIS WORK.
© 2025 GARVER, LLC
G
IL
LE
SP
IE
C
O U
N
TY
AI
R
PO
R
T
FR
ED
ER
IC
KS
BU
R
G , T
X
AI
R
FI
EL
D P
AV
EM
EN
T
R
EH
AB
IL
IT
AT
IO
N
REGISTRATION NO.
F-5713
Fi le
:L :\2
3\
A0
T8
Ai rfi el d Pa ve m en t R eh ab
\D ra w in gs \T
_P
VM
T-
C P-
1.
dw g
L as t S av e:
2/
/2
9:
A M
La st s av ed b y:
O
R D oc ke ry La st p lo tte d by
:D oc ke ry
, O liv ia R
.P lo t S ty le :A
EC
m on o.
ct b
Pl ot
S ca le :1
:1 Pl ot D at e:
2/
/2
9:
A
M Pl ot te r u se d:
D
W G
T o
PD
F.
pc
CP-002
MCC
PJH
AD
D
EN
D
U M
PG
H 2/
/2
File details come from the government source that posted it. Updated .