SOW 66410-B-0458-01 23 September 2020

Navigation Seamanship Ship-Handling

DCAST Scheduling

Tool Data Export/Import

STATEMENT OF WORK

66410-B-0458-01

Prepared by:

Marie Petrow

Navy Managed FTSS Deputy- APML

NAWCTSD- Sustainment

SOW 66410-B-0458-01 23 September 2020

1. Scope. This Statement of Work (SOW) establishes the requirements for the export and import of Navigation Seamanship Ship-Handling (NSST) scheduling data from the legacy NSST scheduling tool into the DCAST tool, a Navy program of record designed for scheduling and data collection. The Contractor shall perform the tasks required for data extraction, manipulation, and organization from the legacy NSST scheduling tool into a

DCAST compatible data file that to be imported into DCAST.

2. Requirements. The Contractor shall export and organize data from the legacy NSST scheduling tool (from nssttraining.net) and import into DCAST. The Contractor shall export data the timeframe of 1 October 2016 thru 30 September 2021. The data shall include only the completed training events for the past and for the future the on-going and scheduled “planned” training events.

The export file shall include the following data fields:

a) Ship’s hull number

b) Course

c) Class Type

d) Instructor

e) Points of Contact

f) Location

g) Start Date

h) End Date

i) Date Approved

j) Date Completed

k) Training Device

l) Data listed in Comments Section

3. Milestones. The Contractor shall develop a Plan of Actions and Milestones

(POA&M) detailing from the start to the completion of the effort. Once the POA&M is approved, the Contractor shall provide monthly updates to the POA&M efforts completed to date and any changes in the schedule.