NRMAC1002201322 Solicitation Questions and Answers.pdf
PDF 72 KB Posted
- Attached to
- Roof Replacement
- Solicitation number
- NR-MAC100-22-01322RDS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NRMAC1002201322 Drawing.pdf | ||
| NRMAC1002201322 SF-18.doc | DOC document | |
| NRMAC1002201322 Wage Rates.pdf | ||
| NRMAC1002201322 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. The drawing states that the new rigid insulation is to match the existing R-value. What is the existing R-value? the R value is R19
2. Has a core sample of the roof been performed to identify the thickness of the existing insulation board, and can the core sample report be posted? The current roof consists of a Tectum decking with 1.5 inches of tar & gravel adhered to Tectum with Techlite.
Insulation board on top of tar & gravel TPO membrane adhered to Techlite.
3. It appears now that the existing canopy is to be demolished and a new canopy be installed instead of repairing the existing canopy. Is this correct? Replace canopy
File details come from the government source that posted it. Updated .