This statement of work outlines requirements for the repair and reconditioning of 40 automated surface observing system central processing unit boards for the National Oceanic and Atmospheric Administration. The contractor shall inspect, clean, repair, and recondition each board to like-new condition in accordance with source control drawings and specifications, replacing any damaged, missing, or non-functioning parts. Work must include verifying and updating firmware as needed. The contractor must develop test procedures and provide a one-year warranty on materials and workmanship. Repaired boards will undergo government quality assurance testing and inspection at the National Reconditioning Center, and any failures will be returned for rework at no cost to the government. The contractor must package and ship repaired units to withstand typical transport stresses without damage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CAR 1352.209-74.docx | DOCX document | |
| 52.222-48 Exemption from Appl of the SC Labor Standards.docx | DOCX document | |
| Evaluation Factors.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Repair and Recondition: Automated Surface Observing System (ASOS) CPU Board, FIRMWARE 2.0, AAI P/N 62828-47006-30 (Programmed for Data Collection Package)
ASN: S100-2A1A2A1, NSN: 5998-01-368-8658
Version: May 18, 2023
Description: The Contractor shall repair and recondition the CPU Board to "Like New" operating condition, including cosmetic appearance in accordance with this Statement of Work (SOW), National Weather Service (NWS) specification drawing, or other specification document. The repair and reconditioning price shall include the parts, materials, labor, inspection, and return shipping necessary to return the CPU Board to operational specifications. Repair materials or specifications differing from the NWS source specification must be approved by the National Weather Service prior to use.
Definition: “Like New” Condition means reconditioned to the listed specification to meet all applicable electrical, mechanical, and cosmetic specifications and engineering documentation, including the replacement of damaged, missing, or non-functioning parts.
Government Furnished Equipment: The National Reconditioning Center (NRC) can provide EPROM sets with J29 and J30 with firmware version V2.00. If a request needs to be made, please contact the Contracting Official for assistance.
Government Furnished Data: Source Control Drawing 62828-90092 (when requested).
Vendor Furnished Equipment: Vendor shall provide all parts, supplies, and test equipment as required to accomplish the repair and reconditioning actions. The vendor will need to develop their own test procedures.
Recommended Equipment and Supplies: None.
First Article: Please check the Purchase Order (SF1449) for any First Article requirements. If First Articles are required, they must pass inspection by the NRC’s Inspection Branch before you are given the “Notice to Proceed” from the Contracting Officer for the remaining units.
Description of Work: All equipment will be inspected and/or evaluated when received for operational performance and physical appearance. Each CPU Board will be cleaned, repaired and reconditioned to ensure that it is able to pass all factory acceptance tests established by the OEM. Verify EPROMS J29 and J30 have firmware version V2.00. When they do not, request EPROM sets from the Contracting Official and install EPROM sets when they arrive. (ASN: S100-2A1A2A1U29B). Soldering and circuit board repair shall be in accordance with DOD-STD-2000 or commercial equivalent. CPU Boards being repaired will also be reconditioned to ensure they are in “Like New” condition in accordance with specifications. The vendor will need to develop their own test procedures.
Warranty Terms: The Contractor will provide a 1-year warranty against material workmanship and against faults occurring during operation. This 1-year warranty will begin after passing the final equipment inspection and acceptance for stock.
NRC Final Acceptance: All repaired and reconditioned CPU Boards are subject to Performance Quality Assurance testing/inspection and will be returned for corrections if discrepancies are found. All repaired and reconditioned CPU Boards will be inspected for material workmanship and tested for operational performance at the NRC in accordance with the listed specifications. To meet the material workmanship requirements, the CPU Boards will need to be in a “Like New” operating condition. The NRC’s Inspection Branch will be checking the cleanliness of the connectors and board to ensure no corrosion is present that might interfere with the operation of the board and that all soldering is according to specifications. The NRC’s Inspection Branch will verify the CPU Boards will pass diagnostics tests and communicates properly with other components in an operational representative ASOS system. They will verify EPROMS J29 and J30 have firmware version V2.00. The CPU Board must then perform all normal processing using the ASOS operating and applications software in a live ASOS system with operational sensors. Any inspected item that does not meet the acceptance criteria will be returned to the vendor for rework at no additional cost to the government.
Deliverables: Each repaired and reconditioned CPU Board, by serial number, shall be supplied with a Repair Report documenting the repair, reconditioning and inspection to include results of all tests and failure analysis.
Shipping Address:
NATIONAL RECONDITIONING CENTER (NRC)
14200 MERRITT RD.
GRANDVIEW, MO. 64030
Transportability: Vendor is responsible for returning repaired products in a shipping container designed to withstand the vibration and shock encountered during transportation by ship, rail, truck, and aircraft. The units shall be packaged to prevent damage to include: physical, electrical, mechanical, cosmetic, and the units shall not be damaged or lose performance capability.
Final Note: When unforeseen problems arise, that may need clarification, please contact the Contracting Official immediately. If the unit has any problem that prevents a quality repair, do not work on the item until the issue can be resolved.
NRC Reviewed:
WSRB Repair Branch Review: Jerry Forste, Branch Chief, May 18, 2023 TI&MR Branch Review: Gregory Flores, Branch Chief, May 18, 2023