This is a synopsis for a Design-Build contract to renovate office spaces within GSA Building 50 at the Denver Federal Center, with an estimated cost between $5-10 million and completion by November 2026. The notice outlines a two-phase procurement process set aside exclusively for small businesses under NAICS code 236220.
The procurement will begin with Phase 1 (RFQ) to identify and shortlist up to three qualified offerors, with responses due January 29, 2025. Phase 2 (RFP) will require technical and price proposals, with stipends provided to unsuccessful offerors who submit acceptable Phase 2 proposals. The GSA will host a virtual industry day on February 5, 2024, from 9:00-11:00 AM MST. The formal RFQ will be released on SAM.gov by end of Q1 with responses due approximately 60 days after publication. The final award will be a firm-fixed-price contract for both design and construction services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NPS Building 50 Office Renovations Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 50 Design-Build Synopsis
THIS IS A SYNOPSIS ONLY. THIS IS NOT A REQUEST FOR OFFERS OR PROPOSALS. THIS NOTICE DOES NOT REPRESENT
A COMMITMENT BY THE GOVERNMENT TO ISSUE A SOLICITATION OR AWARD A CONTRACT. INFORMATION
RECEIVED WILL BE USED TO DETERMINE THE AVAILABILITY OF TECHNICALLY CAPABLE AND OTHERWISE
RESPONSIBLE FIRMS THAT WOULD BE INTERESTED IN SUBMITTING OFFERS.
Notice Type Synopsis
Posted Date Jan 14, 2025
Response Date Jan 29, 2025
Set Aside Total small business set-aside
NAICS Code 236220 - Commercial and Institutional Building Construction
The General Services Administration (GSA), Public Buildings Service (PBS), Region 8, Office of Acquisition
Management, Capital Program, intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract to renovate office and office-related spaces within the existing GSA Building 50 at the Denver
Federal Center (DFC).
The GSA plans to award a firm-fixed-price design-build contract using the Federal Acquisition Regulation
(FAR) two-phase design-build selection procedures (FAR Subpart 36.3). The procurement process will include two sequential solicitations: Phase 1 and Phase 2.
The estimated total design-build cost ranges between $5,000,000 and $10,000,000, with project completion anticipated no later than November 2026.
Phase 1: Request for Qualifications (RFQ)
The purpose of Phase 1 is to identify the most highly qualified offerors to advance to Phase 2 (Request for Proposals). Following the evaluation of Phase 1 submissions, the Contracting Officer will shortlist and publicly announce the selected offerors on SAM.gov. A maximum of three (3) of the most highly rated offerors will proceed to Phase 2.
http://sam.gov
Phase 2: Request for Proposals (RFP)
Phase 2 will be conducted in accordance with FAR Part 15. Offerors will be required to submit separate technical and price proposals, evaluated independently per FAR 15.304. At the conclusion of this phase, GSA intends to award a single contract for both design and construction services.
Stipend
To compensate for the preparation of Phase 2 technical proposals, GSA will provide a stipend to offerors not selected for the final contract award. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. No stipend will be provided during Phase 1.
Eligibility
This procurement is exclusively open to small businesses.
Industry Day
An industry day will be held virtually on February 5, 2024, from 9:00 to 11:00 AM MST. Interested parties are invited to RSVP at: https://forms.gle/sXimseDpifRc4Lru6.
RFQ Release
The RFQ will be issued electronically by the end of Q1 at SAM.gov, with responses due approximately 60 days following publication.