AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
0003 10/04/12
W912EE
Contracting Division USACE-Vicksburg District 4155 Clay Street Vicksburg, MS 39183
See Item 6
✘ NOV05B-11-H-0009
09/20/12
Reference Request for Proposal No. NOV04B-11-H-0008, for New Orleans to Venice, NOV-05B, St.
Jude to City Price, Fronting Protection at Diamond Pump Station, Plaquemines Parish, Louisiana.
A new proposal due date and time of 12 October 2012 at 1430 hours is hereby established.
Offerors are encouraged to submit questions by noon, 10 August 2012 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specifications and amendments for answers to questions prior to submission of a new inquiry.
10/04/12
NOV05B-11-H-0009
SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
BID OPENING DATE AND TIME
A new proposal due date and time of 12 October 2012 at 1430 hours is hereby established.
SPECIFICATIONS
Bidding Schedule, Section 31 31 00.00 12, and Section 31 62 13.20 12 are revised and replaced.
DRAWINGS
Drawings GI001 and CS505 are revised and replaced.
STANDARD FORM 1442
Page 1 is revised and replaced.
Page(s) of the SF 1442 revised by this amendment have an asterisk (*) in the margins before and after the changes to the previous issue as well as the notation “Revised by Amendment 0003” at the bottom of the page.
Specifications revised by this amendment have the notation "Revised by Amendment 0003" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
Drawings revised by this amendment have the notation “Revised by Amendment 0003” in the title block.
Request for Proposal No. NOV05B-11-H-0009 is hereby amended toaddress Request For Information (RFI) #13 thru #29.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
(End of Summary of Changes)
SOLICITATION, OFFER, AND
AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
NOV05B-11-H-0009
2. TYPE OF SOLICITATION
SEALED BID (IFB)
X NEGOTIATED (RFP)
3.DATE ISSUED
20 SEP 2012
PAGE OF PAGES
IMPORTANT – The "offer" section on the reverse must be fully completed by offeror
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO
NOV-05-B
7. ISSUED BY CODE
8. ADDRESS OFFER TO
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG, MS 39183-3435
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG, MS 39183-3435
FOR INFORMATION B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
CALL: Christy J. Love 601-631-5826
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
FRONTING PROTECTION AT DIAMOND PUMP STATION, PLAQUEMINES PARISH, LOUISIANA
HUBZONE MATOC, REQUEST FOR PROPOSAL, Task Order for New Orleans to Venice, NOV-05B, St. Jude to City Price, Fronting Protection at Diamond Pump Station, Plaquemines Parish, Louisiana
CONTROL NUMBER NOV05B-11-H-0009.
THIS ACQUISITION IS 100% SET ASIDE FOR THE HUBZONE MATOC.
11. The Contractor shall begin performance within 10 calendar days and complete it within 840 calendar days after receiving award, notice to proceed. The performance period is mandatory, negotiable.
(See _far 52.211-10.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 by 1430 hours.
local time 12 October 2012. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 30 calendar days for government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
"Revised by Amendment 0003"
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
B4CTCCJL
Typewritten Text
Request For Information (RFI)
Q13. Please post drawings on FedBizOps for access by Subcontractors and Material Vendors
A13. Due to FedBizOps system file size requirements the drawings for the project can not be posted. CD’s are provided to the MATOC pool when the file size is too large to post.
Q14. Please clarify if clean‐up from Hurricane Issac will be required under this contract
A14. Debris will be removed by the Parish. The contractor will be responsible for removing any marsh grass that remains. See spec section 31 11 00.00 12.
Q15. Ref. 00100 (18) ‐ Due to the proximity to Hwy. 23, is it necessary to monitor vibrations during work other than driving and extracting piles.
A15. See updated 01100 spec per amendment 0003. Monitoring will be required only when deemed necessary by the Contractor or the Government due to the Contractor’s use of larger than expected/normal equipment or the Contractor’s use of construction practices that cause more vibration than expected/normal.
Q16. Reference Option Items 0034 and 0035/Drawing Sheet No. SS503 ‐ These 2 option items are measured as "Lump Sum" so are we to price this work for all pipe supports for both discharge lines within the preload area or should the items be measured per "Each"?
A16. See updated specs per amendment 0003. The referenced optional items are now included as split bid optional items and will be paid as “Each”.
Q17. During no work periods such hurricane season when both pumps must be in service and preload monitoring, will contractor be required to maintain facilities for inspector and have QCSM and SSHO on site?
A17. Facilities for inspector will be required to be maintain at all times throughout the project (even during the preload period). The contractor’s personnel (QC Manager, SSHO, etc.) only need to be onsite when work is being performed.
Q18. Drawing cs505 detail c depicts that the top of drain swill be a minimum of a foot below cover .
Detail B indicated “ detail of Wick Drain & Horizontal strip connections . Strip connections are normally required for drain above fill/cover. Thus strip connections will not be required.
A18. Strip connections are not required. See revised drawings CS505 per Amendment 0003.
Q19. Will each inclinometer and extensometer require an individual / separate probe?
A19. More than one probe is required, but not one for each inclinometer and extensometer.
Q20 . Will each piezometer and extensometer require separate /individual terminal box?
A20. This is left to the contractor to specify in the Contractor Installation Plan (submittal SD‐05 for Government approval). 3.3 (i) states that, “Terminal boxes to match the piezometers shall be installed according to the approved contractor installation plan.”
Q21. Drawing CS509 does not depict an inclinometer protective casing. The above referenced spec section does m what will be an acceptable exterior casing?
A21. Spec 13 50 00.00 12 Section 2.7 (i) states, “Surface protection shall be 6‐inch diameter steel casing at least 6 feet in length with locking cap”.
Q22. Will it be acceptable to ship samples to a USACE approved lab for testing and results?
A22. No.
Q23. Please confirm quantity of 8,500 SF for Bid Item 20 – Piling, Steel Sheet, Type PZ 27. We calculate a smaller quantity based on the profile shown on Sheet SS201.
A23. 8500 sf is correct. Quantity includes “steps” in the sheetpile as it changes locations in the base slabs.
See SS‐102 and 103.
Q24. Please provide estimated quantities for lump sum Bid Items.
A24. Estimated Quantities Provided.
Q25. Is power for construction operations available at the site?
Q25. Contractor is responsible for providing power at site. See spec section 01100.
Q26. Is the preload embankment material subject to the same compaction and testing requirements as the final levee embankment?
Q26. Yes, see spec section 31 24 00.00 12.
Q27. Please provide quantity and/or thickness and area of existing riprap to be removed that is shown on Sheet CS206.
A27. Riprap placed when pump station was constructed was 2 foot thick. It covered an approximate 2,750 square foot area.
Q28. Please provide contraction joint detail referenced in Note 1 on Sheet CS502.
A28. Details are provided in the specs. See spec section 35 43 38.00 12.
Q29. What line pressure should the 60” couplings be made for?
A29. Approximately 35 psi.
SECTION 00010 – BIDDING SCHEDULE
New Orleans to Venice, NOV-05B St. Jude to City Price, Fronting Protection at Diamond Pump Station Plaquemines Parish, Louisiana
Base Bid Items
Item Description Estimate d Quantity
Uni t
Unit Price
Estimated Amount
0001 Mobilization and Demobilization 1 LS 0002 Video and Photographic Documentation 1 LS 0003 Clearing, Grubbing and Stripping 1 LS 0004 Silt Fence 1,520 LF 0005 Truck Wash-Down Rack 1 LS 0006 Embankment -----------
0006AA first 11,400 cubic yards 11,400 CY 0006AB all over 11,400 cubic yards 11,400 CY 0007 Excavation 1 LS 0008 Reinforcement Geotextile (T=27,000) 2,516 SY 0009 Reinforcement Geotextile (T=30,500) 7,120 SY 0010 Establishment of Turf for Stage 1
(Preload) Embankment
1 LS
0011 Seeding and Mulching 5 AC 0012 Fertilizer -----------
0012AA first 360 pounds 360 LB S
0012AB over 360 pounds 360 LB S
0013 Lime Soil Amendment 5 TN 0014 Sulfur Soil Amendment 2.5 TN 0015 Care of Water 1 LS 0016 Steel H-piling HP 14x73 12,000 LF 0017 Piling, Concrete Precast, Prestressed
(14-inch x 14-inch)
2,200 LF
0018 Piling, Steel Sheet, Type PZ 27 8,500 SF 0019 Reinforced Concrete Floodwall 1 LS 0020 Concrete Scour Protection 2,600 SY 0021 Preload Sand Fill -----------
0021AA first 8,250 tons 8,250 TN 0021AB all over 8,250 tons 8,250 TN
Revised by Amendment 0003
0022 200 LB Topsize RipRap 520 TN 0023 Bedding Material 140 TN 0024 Separator Geotextile 512 SY 0025 Storm Drainage System 1 LS 0026 Discharge Pipe and Appurtenances 1 LS 0027 Butterfly Valves and Operators 1 LS 0028 Pneumatic System Modifications 1 LS 0029 Vertical Wick Drain 91,200 LF 0030 Geotechnical Instrumentation 1 LS 0031 Electrical Work 1 LS 0032 Demolition 1 LS 0033 Traffic Control and Coordination 1 LS
BASE TOTAL $
Optional Bid Items 0034 Embedded Plate Adjustment ------- ---- -------- --------------------- 0034AA First each 1 EA 0034AB All over 3 EA 0035 Pipe Support Replacement ------- ---- --------- ----------------------- 0035AA First each 1 EA 0035AB All over 3 EA
BASE AND OPTION TOTAL $
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE DECLARED
NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 5: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL
WORK. In the event that the OPTIONAL WORK item is exercised under the terms of the contract, no additional calendar days will be added to the original contract duration of 840 calendar days established for the BASE and OPTIONAL WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(FAR 52.211-10 - APR 1984)”.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Clause)
EVALUATION OF SUBDIVIDED ITEMS (EFARS 52.211-5000 - MAR 95)
Item Nos. 0006, 0012 and 0021, 0034 and 0035 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (EFARS 52.211-
5001 - MAR 95)
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos.
0006, 0012 and 0021, 0034 and 0035.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Item Nos. 0006, 0012 and 0021, 0034 and 0035 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
c. If the quantity of work performed under Item Nos. 0006, 0012 and 0021, 0034 and 0035 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item Nos. 0006, 0012 and 0021, 0034 and 0035 exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(End of Clause)
NOTE 7: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices; http://www.mvn.usace.army.mil/ebs/rapid_vendor_payment.asp
NOTE 8: PRE-BID OPENING ON-SITE INSPECTION: A single “one-day” site visit shall be held prior to bid opening for an on-site inspection. The on-site inspection shall be held at Diamond Pump Station on Thursday, 27 September 2012, between 10:00 AM to 11:00 AM.
Point of contact from the Area Office is Jeffrey Falati at 504-862-2980.
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 31 00.00 12
CAST-IN-PLACE STRUCTURAL CONCRETE
PART 1 GENERAL
1.1 SCOPE
1.2 RELATED WORK SPECIFIED ELSEWHERE
1.3 REFERENCES
1.4 MEASUREMENT AND PAYMENT
1.4.1 Reinforced Concrete Floodwall
1.4.2 Optional Embedded Plate Adjustment
1.4.3 Optional Pipe Support Replacement
1.5 SUBMITTALS
1.6 GOVERNMENT TESTING AND SAMPLING
1.6.1 Aggregate
1.6.2 Concrete
1.6.3 Concrete Strength
1.6.3.1 Investigation of Low-Strength Test Results
1.6.3.2 Testing of Cores
1.6.3.3 Load Tests
1.6.4 Cement and Pozzolan
1.7 DESIGN REQUIREMENTS
1.7.1 Concrete Strength
1.7.2 Maximum Water-Cementitious Materials (W/CM) Ratio
1.8 CONSTRUCTION TOLERANCES
1.8.1 General
1.8.2 Appearance
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Cementitious Materials
2.1.1.1 Portland Cement
2.1.1.2 High-Early-Strength Portland Cement
2.1.1.3 Pozzolan, Other than Silica Fume
2.1.2 Aggregates
2.1.3 Chemical Admixtures
2.1.3.1 Air-Entraining Admixture
2.1.3.2 Accelerating Admixture
2.1.3.3 Water-Reducing or Retarding Admixture
2.1.4 Curing Materials
2.1.4.1 Impervious-Sheet Curing Materials
2.1.4.2 Membrane-Forming Curing Compound
2.1.4.3 Burlap
2.1.5 Water
2.1.6 Nonshrink Grout
2.1.6 Latex Bonding Compound
2.2 Concrete Mixture Proportions
2.2.1 Quality of Mixture
SECTION 03 31 00.00 12 Page 1
2.2.2 Nominal Maximum-Size Coarse Aggregate
2.2.3 Air Content
2.2.4 Slump
2.2.5 Pozzolan Content
2.2.6 Determining Standard Deviation
2.2.6.1 For 30 or More Test Records
2.2.6.2 For 15 to 29 Test Records
2.2.6.3 For Less Than 15 Test Records
2.2.7 Required Average Compressive Strength, fcr
2.2.7.1 For 15 or More Test Records
2.2.7.2 For less than 15 Test Records
2.2.8 Documenting Average Strength
2.2.8.1 Field Experience
2.2.8.2 Laboratory Trial Batches
PART 3 EXECUTION
3.1 EQUIPMENT
3.1.1 Capacity
3.1.2 Batch Plant
3.1.2.1 Batching Equipment
3.1.2.2 Scales
3.1.2.3 Batching Tolerances
3.1.2.4 Moisture Control
3.1.3 Concrete Mixers
3.1.3.1 Stationary Mixers
3.1.3.2 Truck Mixers
3.1.4 Conveying Equipment and Methods
3.1.4.1 Buckets
3.1.4.2 Transfer Hoppers
3.1.4.3 Trucks
3.1.4.4 Chutes
3.1.4.5 Belt Conveyors
3.1.4.6 Concrete Pumps
3.1.5 Vibrators
3.2 PREPARATION FOR PLACING
3.2.1 Embedded Items
3.2.2 Concrete on Earth Foundations
3.2.3 Construction Joint Treatment
3.2.3.1 Joint Preparation
3.2.3.2 Air-Water Cutting
3.2.3.3 High-Pressure Water Jet
3.2.3.4 Wet Sandblasting
3.2.3.5 Waste Disposal
3.3 Placing Equipment and Methods
3.3.1 Placing Procedures
3.3.2 Placement by Pump
3.3.3 Time Interval Between Mixing and Placing
3.3.4 Cold-Weather Placing
3.3.5 Hot-Weather Placing
3.3.6 Consolidation
3.4 FINISHING
3.4.1 Unformed Surfaces
3.4.1.1 Float Finish
3.4.1.2 Broom Finish
3.4.2 Formed Surfaces
3.4.3 Formed Surface Repair
3.4.3.1 Classe A Finishes
3.4.3.2 Class D Finish
SECTION 03 31 00.00 12 Page 2
3.4.3.3 Material and Procedure for Repairs
3.5 Curing and Protection
3.5.1 Duration
3.5.2 Moist Curing
3.5.3 Membrane-Forming Curing Compound
3.5.3.1 Application
3.5.4 Evaporation Retardant
3.5.5 Cold-Weather Curing and Protection
3.6 SETTING OF BASE PLATES AND BEARING PLATES
3.6.1 Setting of Plates
3.6.2 Nonshrink Grout Application
3.6.2.1 Mixing and Placing of Nonshrink Grout
3.6.2.2 Treatment of Exposed Surfaces
3.6.2.3 Curing
3.7 TESTS AND INSPECTIONS
3.7.1 Qualifications
3.7.2 Testing and Inspection for Contractor Quality Control
3.7.2.1 Fine Aggregate
3.7.2.2 Coarse Aggregate
3.7.2.3 Deleterious Substances
3.7.2.4 Scales
3.7.2.5 Batch-Plant Control
3.7.2.6 Concrete Mixture
3.7.2.7 Inspection Before Placing
3.7.2.8 Placing
3.7.2.9 Vibrators
3.7.2.10 Curing
3.7.2.11 Cold-Weather Protection and Sealed Insulation Curing
3.7.2.12 Cold-Weather Protection Corrective Action
3.7.2.13 Uniformity of Concrete Mixing
3.7.2.14 Mixer Uniformity Corrective Action
3.7.3 Reports
-- End of Section Table of Contents --
SECTION 03 31 00.00 12 Page 3
SECTION 03 31 00.00 12
CAST-IN-PLACE STRUCTURAL CONCRETE
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all plant, labor, materials, and performing all operations in connection with furnishing and placing cast-in-place concrete as indicated on drawings and specified herein, but not limited to, floodwall construction, concrete scour protection, placing concrete beam, and construcing pipe support saddles for the new pipe supports. All concrete placed as part of the optional embedded plate adjustment and the optional pipe support replacement shall be in accordance with this specification, per the sequencing laid out in the plans, and at the direction of the Contracting Officer.
1.2 RELATED WORK SPECIFIED ELSEWHERE
a. Section 03 15 13.00 12 EXPANSION JOINTS AND WATERSTOPS IN CONCRETE.
b. Section 03 21 00.00 12 REINFORCING STEEL.
c. Section 03 11 14.00 12 FORMWORK FOR CONCRETE.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ACI INTERNATIONAL (ACI)
ACI 117 (2010) Standard Specifications for Tolerances for Concrete Construction and Materials
ACI 211.1 (1991; R 2002) Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete
ACI 214R (2002) Recommended Practice for Evaluation of Strength Test Results of Concrete
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 318 (2008; Errata 2010) Building Code Requirements for Structural Concrete and Commentary
ASTM INTERNATIONAL (ASTM)
ASTM C 29/C 29M (2009) Standard Test Method for Bulk
SECTION 03 31 00.00 12 Page 4
Density ("Unit Weight") and Voids in Aggregate
ASTM C 31 (2009) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C 33 (2008) Standard Specification for Concrete Aggregates
ASTM C 39 (2009) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C 42/C 42M (2010) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C 94/C 94M (2012) Standard Specification for Ready-Mixed Concrete
ASTM C 127 (2007) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate
ASTM C 128 (2007) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate
ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C 143 (2009) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C 150 (2009) Standard Specification for Portland Cement
ASTM C 171 (2007) Standard Specification for Sheet Materials for Curing Concrete
ASTM C 172 (2008) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C 192/C 192M (2007) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory
ASTM C 231 (2009) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C 260 (2006) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C 309 (2007) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C 494/C 494M (2011) Standard Specification for Chemical
SECTION 03 31 00.00 12 Page 5
Admixtures for Concrete
ASTM C 566 (1997; R 2004) Standard Test Method for Total Evaporable Moisture Content of Aggregate by Drying
ASTM C 595 (2010) Standard Specification for Blended Hydraulic Cements
ASTM C 597 (2009) Pulse Velocity Through Concrete
ASTM C 618 (2012) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C 803/C 803M (2003) Penetration Resistance of Hardened Concrete
ASTM C 805 (2008) Rebound Number of Hardened Concrete
ASTM C 1059 (1999) Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete
ASTM C 1064/C 1064M (2008) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C 1077 (2010) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation
ASTM C 1107 (2008) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C 1567 (2011) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM D 75 (2009) Standard Practice for Sampling Aggregates
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST HB 44 (2007) NIST Handbook 44: Specifications, Tolerances, and other Technical Requirements for Weighing and Measuring Devices
NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)
NRMCA CPMB 100 (2000) Concrete Plant Standards
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 94 (1995) Specification for Surface Retarders
SECTION 03 31 00.00 12 Page 6
COE CRD-C 100 (1975) Method of Sampling Concrete Aggregate and Aggregate Sources, and Selection of Material for Testing
COE CRD-C 104 (1980) Method of Calculation of the Fineness Modulus of Aggregate
COE CRD-C 400 (1963) Requirements for Water for Use in Mixing or Curing Concrete
COE CRD-C 521 (1981) Standard Test Method for Frequency and Amplitude of Vibrators for Concrete
LOUISIANA STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES (2006
Edition), LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
(LADOTD)
LSSRB 1003.02 Aggregates for Portland Cement Concrete and Mortar
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CCC-C-467 (Feb 8, 1972) Cloth, Burlap, Jute (or Kenaf)
1.4 MEASUREMENT AND PAYMENT
1.4.1 Reinforced Concrete Floodwall
No measurement will be made for concrete. Payment for concrete will be made at the contract lump sum price for "Reinforced Concrete Floodwall".
Price and payment shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the concrete work and furnishing and installing all miscellaneous metal. Reinforced concrete monoliths consist of base slabs, stabilization slabs, walls, reinforcing steel, formwork, waterstops, expansion joint filler, and other components incidental thereto.
1.4.2 Optional Embedded Plate Adjustment
No measurement will be made for the embedded plate adjustment. Payment for embedded plate adjustment will be made at the contract lump sum price per each for "Embedded Plate Adjustment". Price and payment shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the concrete work and furnishing and installing all miscellaneous metal. Embedded plate adjustments consist of demolition, formwork, concrete, and other components incidental thereto.
1.4.3 Optional Pipe Support Replacement
No measurement will be made for the pipe support replacement. Payment for pipe support replacement will be made at the contract lump sum"each" price for "Pipe Support Replacement". Price and payment shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the concrete work and furnishing and installing all miscellaneous metal. Pipe support replacements consist of support beams, reinforcing steel, formwork, and other components incidental thereto.
SECTION 03 31 00.00 12 Page 7
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Concrete Mixture Proportions; G
Concrete mixture proportions shall be determined by the Contractor, in accordance with the requirements in paragraph "CONCRETE MIXTURE PROPORTIONS", and submitted for approval. The concrete mixture quantities of all ingredients per cubic yard and nominal maximum coarse aggregate size that will be used in the manufacture of each quality of concrete shall be stated.
Proportions shall indicate the mass of cement, pozzolan, and water; the mass of aggregates in a saturated surface-dry condition; and the quantities of admixtures. The submission shall be accompanied by test reports from a laboratory complying with ASTM C 1077, which show that proportions thus selected will produce concrete of the qualities indicated. The submission shall provide information specified in paragraph "Documenting Average Strength", and if applicable, paragraph "Determining Standard Deviation". Mix proportions, exact slump and exact air content shall be reported for each concrete cylinder used to develop the mix design. No substitution shall be made in the source or type of materials used in the work without additional tests to show that the quality of the new materials and concrete are satisfactory.
Aggregates; G
Information identifying the aggregate source to be used along with gradation tests for fine and coarse aggregates shall be submitted for approval. The gradation test for fine aggregate shall include the No. 8 and No. 30 sieve sizes. Actual current gradation tests (not averages) shall be submitted. Specific gravity and absorption of fine and coarse aggregates determined by ASTM C 128 and ASTM C 127, respectively shall also be submitted.
Batch Plant
The Contractor shall submit batch plant data to the Contracting Officer for review for conformance with paragraphs "Capacity" and "Batch Plant."
Concrete Mixers.
The Contractor shall submit concrete mixer data, which includes the make, type, and capacity of concrete mixers for review of conformance with paragraphs "Capacity" and "Concrete Mixers."
Conveying Equipment and Methods
The conveying equipment and methods for transporting, handling, SECTION 03 31 00.00 12 Page 8 and depositing the concrete shall be submitted for review for conformance with paragraphs "Capacity" and "Conveying Equipment."
Placing Equipment and Methods
All placing equipment and methods shall be submitted for review for conformance with paragraphs "Capacity" and "PLACING EQUIPMENT
AND METHODS."
Nonshrink Grout.
Descriptive literature of the nonshrink grout proposed for use indicating conformance with the specification requirements shall be furnished together with a certificate from the manufacturer stating that it is suitable for the application or exposure for which it is being considered or the Contractor shall submit the application and exposure where the grout is to be used and shall submit manufacturer's literature indicating that the grout is appropriate for the application and exposure and meets all specification requirements.
SD-04 Samples
Aggregate; G
Samples of materials for Government testing and approval shall be submitted as required in paragraph "Aggregates."
Surface Retarder
Sample of surface retarder material with manufacturer's instructions for application in conjunction with air-water cutting.
SD-05 Design Data
Construction Joint Treatment; G
The method and equipment proposed for construction joint preparation and waste disposal shall be submitted for review for conformance with paragraph "Construction Joint Treatment."
Curing and Protection; G
The curing medium and methods to be used shall be submitted for review for conformance with paragraph "CURING AND PROTECTION."
Cold-Weather Placing; G
If concrete is to be placed under cold-weather conditions, the proposed materials, methods, and protection shall be submitted for review for conformance with paragraph "Cold-Weather Placing."
Hot-Weather Placing; G
If concrete is to be placed under hot-weather conditions, the proposed materials and methods, meeting the requirements of paragraph "Hot-Weather Placing" and paragraph "FINISHING," shall be submitted for review.
SECTION 03 31 00.00 12 Page 9
SD-06 Test Reports
Testing and Inspection for Contractor Quality Control
Certified copies of laboratory test reports, including mill tests and all other test data, for portland cement, blended cement, pozzolan, aggregate, admixtures, and curing compound proposed for use on this project.
Uniformity of Concrete Mixing
The results of the initial mixer uniformity tests as required in paragraph "Uniformity of Concrete Mixing" shall be submitted at least 5 days prior to the initiation of placing. The initial test results submitted shall not be more than three months old.
Additional tests shall be conducted and submitted within six months of the previous tests. Uniformity testing shall continue until all concrete is placed.
Tests and Inspections
Test results and inspection reports shall be submitted daily and weekly as required in paragraph "Reports."
SD-07 Certificates
Qualifications
The Contractor shall submit statements that the concrete testing technicians and the concrete construction special inspectors meet the qualifications requirements of paragraph "Testing and Inspection for Contractor Quality Control."
Cementitious Materials
Cementitious materials will be accepted on the basis of the manufacturer's certification of compliance, accompanied by mill test reports, stating that materials meet the requirements of the specification under which they are furnished. Certification and mill test reports shall be from samples taken from current production and be representative of the particular lot furnished.
If a blended product meeting ASTM C 595 is to be used, the manufacturer shall also certify in writing that the amount of pozzolan or slag in the finished cement will not vary more than plus or minus 5.0 mass percent of the finished cement from lot to lot or within a lot. No cementitious materials shall be used until notice of acceptance has been given by the Contracting Officer. Cementitious materials will be subject to check testing from samples obtained at the source, at transfer points, or at the project site, as scheduled by the Contracting Officer, and such sampling will be by or under the supervision of the Government at its expense. Material not meeting specifications shall be promptly removed from the site of work.
Impervious-Sheet Curing Materials
Impervious-sheet curing materials shall be certified for compliance with all specification requirements.
SECTION 03 31 00.00 12 Page 10
Air-Entraining Admixture
Air-entraining admixture shall be certified for compliance with all specification requirements.
Other Chemical Admixtures
Other chemical admixtures shall be certified for compliance with all specification requirements.
Membrane-Forming Curing Compound
Membrane-forming curing compound shall be certified for compliance with all specification requirements.
Latex Bonding Compound
Latex bonding compound shall be certified for compliance with all specification requirements.
1.6 GOVERNMENT TESTING AND SAMPLING
The Contractor shall provide facilities and labor as may be necessary for procurement of representative test samples of aggregates and concrete.
Concrete and aggregate requirements in this paragraph and its subparagraphs do not relieve the Contractor of the requirements outlined in paragraph
"TESTS AND INSPECTIONS."
1.6.1 Aggregate
The aggregate sources listed in the General Provision entitled "AGGREGATE SOURCES" (see Section 01100) have been tested and at the time testing was performed, these sources were capable of producing materials of a quality acceptable for this project provided suitable processing was performed. If the Contractor proposes to furnish aggregates from a source not listed in "AGGREGATE SOURCES", samples consisting of not less than 500 pounds of each size coarse aggregate and 300 pounds of fine aggregate taken under the supervision of the Contracting Officer in accordance with COE CRD-C 100 shall be delivered to the U. S. Army Engineer Research and Development Center (ERDC), Structures Lab, 3909 Halls Ferry Road, Vicksburg, MS within 15 days after notice to proceed. Sampling and shipment of samples shall be at the Contractor's expense. The cost of testing one source for each size aggregate will be borne by the Government. If the Contractor selects more than one source for each aggregate size or selects a substitute source for any size aggregate after the original source was tested, the cost of that additional testing will be borne by the Contractor. From 90 to 120 days will be required to complete evaluation of the aggregates. Testing will be in accordance with applicable CRD or ASTM test methods. Tests to which aggregate may be subjected are specific gravity, absorption, cycles of freezing and thawing in concrete, alkali aggregate reaction, organic impurities, and any other test necessary to demonstrate that the aggregate is of a quality that is at least equivalent to those sources listed in
"AGGREGATE SOURCES".
1.6.2 Concrete
The Government will determine when concrete shall be sampled. The Contractor shall cast, protect and deliver concrete cylinders and determine
SECTION 03 31 00.00 12 Page 11 slump and air content. The person conducting the tests shall meet the Concrete Field Testing Technician requirements contained in paragraph "Qualifications." Concrete shall be sampled in accordance with ASTM C 172.
Concrete shall be sampled by collecting two or more portions taken at regularly spaced intervals during discharge of the middle portion on the batch. Samples shall not be obtained from the very first (first 10 percent) or last (last 10 percent)portions of the batch. When cylinders are molded, slump and air content shall be determined in accordance with ASTM C 143 and ASTM C 231, respectively. If there is an air content loss, the range for air content at the truck discharge shall be adjusted so that the specified air content is obtained at the placement. The correlation shall be established by testing at least the first two trucks for air content. The correlation shall be reestablished as directed by the Contracting Officers Representative when a change in workability at the placement site is noticed. Test samples for each class of concrete shall be taken at least once every 8-hour shift or for every 150 cubic yards placed, whichever requires more samples. From each sample, concrete cylinders for acceptance of compressive strength shall be cast in accordance with ASTM C 31.
Compression test specimens shall be cured while in the field in accordance with paragraphs 10.1, 10.1.1 and 10.1.2 of ASTM C 31. If cylinders are not delivered to the testing laboratory within 24 to 48 hours after molding, they shall be submerged in a water tank provided by the Contractor, where the surrounding water temperature is maintained by the Contractor at 73.4 plus or minus 3 degrees F. Cylinders shall be transported in accordance with ASTM C 31 (with cushioning material) and unloaded in the Government designated location. Compression testing will be performed by the Government in accordance with ASTM C 39. As a minimum one cylinder will be tested at 7 days for information, two cylinders for 6x12 samples or three for 4x8 samples will be tested at the specified design age for acceptance.
1.6.3 Concrete Strength
Compressive strength test specimens required in paragraph "Concrete" will be used to determine compliance. The strength of the concrete will be considered satisfactory so long as the average of all sets of three consecutive test results equals or exceeds the specified compressive strength f'c and no individual test result falls below the specified strength f'c by more than 500 psi. A "test" is defined as the average of two or more cylinders. Additional analysis or testing, including nondestructive testing, taking cores and/or load tests may be required at the Contractor's expense when the strength of the concrete in the structure is considered potentially deficient.
1.6.3.1 Investigation of Low-Strength Test Results
When any strength test of standard-cured test cylinders falls below the specified strength requirement by more than 500 psi or if tests of field-cured cylinders indicate deficiencies in protection and curing, steps shall be taken to assure that the load-carrying capacity of the structure is not jeopardized. Nondestructive testing in accordance with ASTM C 597, ASTM C 803/C 803M, or ASTM C 805 may be permitted by the Contracting Officer to estimate the relative strengths at various locations in the structure as an aid in evaluating concrete strength in place or for selecting areas to be cored. Such tests shall not be used as a basis for acceptance or rejection.
SECTION 03 31 00.00 12 Page 12
1.6.3.2 Testing of Cores
When the strength of concrete in place is considered potentially deficient, cores shall be obtained and tested in accordance with ASTM C 42/C 42M. At least three representative cores shall be taken from each member or area of concrete in place that is considered potentially deficient. The location of cores will be determined by the Contracting Officer to least impair the performance of the structure. Concrete in the area represented by the core testing will be considered adequate if the average strength of the cores is equal to at least 85 percent of the specified strength requirement and if no single core is less than 75 percent of the specified strength requirement.
1.6.3.3 Load Tests
If the core tests are inconclusive or impractical to obtain or if structural analysis does not confirm the safety of the structure, load tests may be directed by the Contracting Officer in accordance with the requirements of ACI 318. Concrete work evaluated by structural analysis or by results of a load test shall be corrected in a manner satisfactory to the Contracting Officer. All investigations, testing, load tests, and correction of deficiencies will be performed and approved by the Contracting Officer at the expense of the Contractor, except that if all concrete is in compliance with the plans and specifications, the cost of investigations, testing, and load tests will be at the expense of the Government.
1.6.4 Cement and Pozzolan
If cement or pozzolan is to be obtained from more than one source, the initial notification shall state the estimated amount to be obtained from each source and the proposed schedule of shipments.
1.7 DESIGN REQUIREMENTS
1.7.1 Concrete Strength
Specified compressive strength f'c shall be as follows:
Compressive Strength (PSI)at Structure Or Portion Of Structure Design Age
4,000 @ 28* days All structural work, except as noted.
2,500 @ 28* days Stabilization slabs
* 56 days if pozzolan is used.
1.7.2 Maximum Water-Cementitious Materials (W/CM) Ratio
Maximum W/CM shall be as follows:
W/CM, By Mass Structure Or Portion Of Structure
0.40 All structural work, except as noted.
0.60 Stabilization slab
SECTION 03 31 00.00 12 Page 13
1.8 CONSTRUCTION TOLERANCES
1.8.1 General
The definitions of the terms used in the following tables shall be as defined in ACI 117. Level and grade tolerance measurements of slabs shall be made as soon as possible after finishing. When forms or shoring are used, the measurements shall be made prior to removal. Tolerances are not cumulative. The most restrictive tolerance controls. Tolerances shall not extend the structure beyond legal boundaries. Except as specified otherwise, plus tolerance increases the amount or dimension to which it applies, or raises a level alignment, and minus tolerance decreases the amount or dimension to which it applied, or lowers a level alignment. A tolerance without a sign means plus or minus. Where only one signed tolerance is specified, there is no limit in the other direction.
TOLERANCES FOR FOUNDATIONS
(1) Lateral alignment
Eccentricity measured from the center of gravity of footing as cast to the center of gravity as specified; 0.02 times width of footing in direction of misplacement but not more than ............................. 2 inch
Supporting masonry construction .......................... 1/2 inch
(2) Level alignment
Top of footings supporting masonry ....................... 1/2 inch
Top of other footings ............................... plus 1/2 inch ................................ minus 2 inch
(3) Cross-sectional dimensions
Horizontal dimension of formed members ................ plus 2 inch .........minus 1/2 inch
Horizontal dimensions of unformed members cast against soil
2 feet or less ..................................... plus 3 inch .................................. minus 1/2 inch
Greater than 2 feet but less than 6 feet ................................... plus 6 inch ................................ minus 1/2 inch
Over 6 feet ....................................... plus 12 inch ..................................... minus 1/2 inch
Vertical dimension (thickness) .................... minus 5 percent
(4) Relative alignment
Slope of footing side and top
SECTION 03 31 00.00 12 Page 14 surfaces with respect to the specified plane ............................ 1 inch max. per 10 feet
TOLERANCE FOR FORMED CONCRETE SURFACES
(1) Vertical alignment
Formed surfaces slope with respect to the specified plane
Vertical alignment of outside corner of exposed corner columns and control joint grooves in concrete exposed to view ........ 1/4 inchmax. in 10 feet
All other conditions ....................... 3/8 inchmax. in 10 feet
(2) Abrupt variation The offset between concrete surfaces for the following classes of surface:
Class A .................................................. 1/8 inch Class D ...................................................1 inch
(3) Gradual variation Surface finish tolerances as measured by placing a freestanding (unleveled), 5-feet straightedge for plane surface or curved template for curved surface anywhere on the surface and allowing it to rest upon two high spots within 72 hours after concrete placement.
The gap at any point between the straightedge or template and the surface shall not exceed:
Class A ................................................. 1/8 inch
Class D .................................................. 1 inch
1.8.2 Appearance
Permanently exposed surfaces shall be cleaned, if stained or otherwise discolored, by a method that does not harm the concrete and that is approved by the Contracting Officer.
SECTION 03 31 00.00 12 Page 15
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Cementitious Materials
Cementitious materials shall be portland cement, or portland cement in combination with pozzolan and shall conform to appropriate specifications listed below. Use of cementitious materials in architectural concrete shall be restricted to one color, one source, and one type.
2.1.1.1 Portland Cement
ASTM C 150, low alkali, Type I or II, except that the maximum amount of C3A in Type I cement shall be 15 percent and cement with a Blaine Fineness of 400 square meters per kilogram or greater shall be considered Type III cement.
2.1.1.2 High-Early-Strength Portland Cement
ASTM C 150, Type III used only when specifically approved in writing.
2.1.1.3 Pozzolan, Other than Silica Fume
Pozzolan shall conform to ASTM C 618, Class C or F, with the Effectiveness in Controlling Alkali-Silica Reaction requirements of Table 3. Test results showing that the proposed combination of cementitious materials and aggregates will expand less than 0.10 percent in 16 days when tested in accordance with ASTM C 1567 may be substituted for the Effectiveness in Controlling Alkali-Silica Reaction test.
2.1.2 Aggregates
Concrete aggregate shall be produced from the sources listed in the 01100 Section, the General Provision…