Notice to Design Professionals
17 KB Posted
- Attached to
- Pulaski State Prison Kitchen & Dining Room Reno.
- Solicitation number
- GDC-23-PULA-SP-DP
- Issued by
- Pike County, Georgia
About this file
This is a Notice to Design Professionals issued by the Georgia Department of Corrections (GDC) soliciting qualified registered Engineers and Architects to provide professional design services for the Kitchen/Dining Room Renovations at Pulaski State Prison located at 373 Upper River Road, Hawkinsville, Georgia 31036. The project involves complete renovation of the kitchen and dining facilities to create a new working kitchen capable of preparing three meals daily for 1,225 offenders. Design services required include schematic design and design development documents, construction documents, bidding assistance and negotiation, and construction contract administration. The scope encompasses environmental surveys (ACM, lead paint, mold assessment), site work including grading and concrete replacement at the dock area, roof modifications, demolition and replacement of waste piping, floor and wall finishes, grease trap systems, kitchen equipment specification, HVAC systems, fire sprinkler and alarm alterations, electrical panel upgrades, natural gas distribution, water service lines, CCTV and communication systems, and loading dock improvements. The design must incorporate a construction plan maintaining temporary daily kitchen operations during renovation. Written and emailed responses are due by 3:00 PM EST on July 6, 2022, submitted to Mr. Charles Green at the GDC address provided. Following initial qualifications evaluation, three or more highly qualified firms will be invited for interviews, with an optional site visit available for selected firms.
The Stated Cost Limitation for this project is estimated at $5.48 million. Qualified respondents must be established firms licensed to practice engineering or architecture with a principal office located in Georgia. Selection criteria include organization, design ability, past performance, ability to meet time requirements, budget adherence, and professional experience. Submission requirements include a letter of interest, a current Architect/Engineer Questionnaire (GSA Standard Form 330), and a notarized, executed Contractor Affidavit under O.C.G.A. 13-10-91(b)(1). All packages must be mailed to the designated address; no in-person deliveries are accepted. A digital copy must also be emailed to Charles.Green@gdc.ga.gov by the deadline, with late submissions resulting in nonresponsive status. The GDC reserves the right to reject any qualifications statement and to waive technicalities at its discretion.
Text of this file
Georgia Department of Corrections Notice to Design Professionals
The Georgia Department of Corrections (GDC) is soliciting responses from registered Engineers / Architects interested in providing professional services for the following project:
Pulaski State Prison – Kitchen/Dining Room Renovations – GDC-23-PULA-SP-01-DP
Location: 373 Upper River Road, Hawkinsville, Georgia 31036
General Project Description:
This project will involve the total renovation of the Kitchen/dining room into a new working kitchen. Facility houses 1225 offenders and prepares three meals per day. Prepare an environmental survey including ACM, Lead Paint, Mold in the existing kitchen/dining building. Site work includes site grading for positive drainage at the dock area, replacement of asphalt paving with concrete surfaces for the dock apron, placement of the temporary kitchen with utility connections by others. Roof changes design for new equipment and reroof. This renovation will affect: the demolition of and replacement of all waste piping, floor finishes, grease trap system, selected frames and doors with new hardware, wall finishes, resinous system floors and walls in dish wash, washrooms and swill room, new kitchen equipment (by others) and hoods, lighting, HVAC system, fire sprinkler alterations with new heads, new fire alarms, camera system, door locking system, obsolete electrical panels and systems, natural gas distribution, water heaters, cold/water service lines, and loading dock finishes. Replacement of CCTV, data and communication system with staff dining check-out register. The design shall incorporate a construction plan which will maintain a temporary daily kitchen operation near the existing loading dock. The Owner shall provide the selected Design Professional with a conceptual kitchen equipment plan during the design process.
The scope of design services shall include preparation of schematic design and design development documents, construction documents, bidding assistance and negotiation, and administration of the contract for construction. The Stated Cost Limitation (SCL) is estimated at $5.48M.
Qualified firms interested in participating in the selection process are invited to submit a letter of interest and one copy of a statement of their qualifications to:
Mr. James Michael Business Services Manager Engineering and Construction Services Georgia Department of Corrections – SOSTC, Lies Hall P.O. Box 1529, 300 Patrol Road Forsyth, Georgia 31029
For additional information concerning the scope of this project please call:
Mr. Charles Green, RA, Project Manager Engineering and Construction Services Georgia Department of Corrections
(478) 245-7613 Charles.Green@gdc.ga.gov
Those firms responding to this invitation will be considered, provided their response includes a letter of interest and a current Architect/Engineer Questionnaire (GSA Standard Form 330) and a notarized, executed Contractor Affidavit under O.C.G.A § 13-10-91(b)(1), see attachment. No further action beyond the submission of the letter of interest, the SF 330, and the notarized, executed Contractor Affidavit is required or desired for consideration.
(Note: This is not a request for proposal or bid)
Respondents should be an established firm, licensed to practice engineering or architecture with a principal office in the State of Georgia. Firms having more than one office are requested to submit only the qualifications of the office that would produce the contract documents. Criteria for selection consideration will be based on such factors as organization, design ability, past performance, ability to meet time requirements, budget limitations, and professional experience.
Following an initial evaluation of qualifications and performance data, three or more firms considered highly qualified by the department to provide the required professional services will be invited for interviews. After the initial evaluation, the Department will conduct an optional site visit for those firms selected for the Department interview.
Written and emailed responses will be considered if received by the GDC point of contact (Charles Green) at the above address not later than 3:00 PM, EST, July 6, 2022. All packages should be mailed to the address provided. No “in person” delivered packages will be accepted. You are also required to email a digital copy by the due date to Charles.Green@gdc.ga.gov. Should either the mailed copy or emailed copy be submitted late the firm will be considered nonresponsive.
Attempts to contact any department representatives in connection with this invitation (other than those individuals designated above) or failure to provide fully responsive submittal information may lead to disqualification.
GDC reserves the right to reject any or all statements of qualifications, and to waive technicalities and informalities at the discretion of GDC.
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Affidavit | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .