NOTICE_OF_INTENT_TO_SOLICIT:_HIGHLAND_VILLAGE_STORMWATER_IMPROVEMENTS_PROJECT_(PHASE_1).pdf

PDF 104 KB Posted

Attached to
NOTICE OF INTENT TO SOLICIT: HIGHLAND VILLAGE STORMWATER IMPROVEMENTS PROJECT (PHASE 1)
Solicitation number
NMBPW-2026-04
Issued by
Miami-Dade County, Orlando City, Florida

About this file

This Notice of Intent to Solicit is issued by the City of North Miami Beach Public Works Department to announce the planned release of a competitive solicitation for construction services associated with the Highland Village Stormwater Improvements Project (Phase 1). The anticipated project scope includes furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of existing outfalls located adjacent to NE 25th Avenue. Work activities encompass excavation, demolition, installation of proposed drainage structures, connection to existing storm drain systems using HDPE storm sewer lines and sleeves of varying sizes, installation of inline backflow prevention devices, removal and relocation of existing 2-inch water services, relocation of existing 8-inch watermains, and replacement of any sod, sidewalk, or pavement damaged during construction. The Notice of Intent was released on January 28, 2026, with a response deadline of February 6, 2026, at 5:00 p.m. The solicitation is anticipated to be issued as an Invitation to Bid and will require appropriate State of Florida contractor licensing and demonstrated experience in stormwater and utility construction.

The project is anticipated to be federally-funded and subject to applicable federal grant requirements, including compliance with Davis-Bacon and Related Acts prevailing wage requirements, Build America, Buy America domestic sourcing provisions, and Small Business Enterprise and Disadvantaged Business Enterprise participation and reporting requirements associated with EPA-funded projects. Additional information and access to the City's online supplier portal is available at https://procurement.opengov.com/portal/citynmb.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/citynmb

City of North Miami Beach

NMBPW-2026-04

NOTICE OF INTENT TO SOLICIT: HIGHLAND VILLAGE

STORMWATER IMPROVEMENTS PROJECT (PHASE 1)

RELEASE DATE: January 28, 2026

RESPONSE DEADLINE: February 6, 2026, 5:00 pm

Please refer to the project timeline in this document for all important deadlines.

#NMBPW-2026-04

Title: NOTICE OF INTENT TO SOLICIT: HIGHLAND VILLAGE STORMWATER IMPROVEMENTS PROJECT (PHASE 1)

Table Of Contents

1. Anticipated Project Scope

Attachments:

A - NOIS#NMBPW-2026-04 Highland Village Stormwater Improvements Project (Phase 1)

#NMBPW-2026-04

Title: NOTICE OF INTENT TO SOLICIT: HIGHLAND VILLAGE STORMWATER IMPROVEMENTS PROJECT (PHASE 1)

1. Anticipated Project Scope

1.1. Anticipated Project Scope

Project work includes furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of the existing outfalls located adjacent to NE 25th Avenue, including, but not limited to, excavation, demolition; installation of proposed drainage structures; connection to existing storm drain system

HDPE Storm Sewer (sizes vary), sleeves (sizes vary) and inline backflow prevention device; remove and relocate as required: existing 2” water services; relocate existing 8” watermain; replacement of any sod, sidewalk, pavement damaged during construction, and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation.

All work performed under this project shall comply with applicable Davis-Bacon and Related Acts (DBRA) prevailing wage requirements, Build America, Buy America (BABA) domestic sourcing provisions, and all Small

Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) participation and reporting requirements associated with EPA-funded projects.

File details come from the government source that posted it. Updated .