North Woods Grounds Maintenance Contract Line Items - Pricing.docx

DOCX document 33 KB Posted

Attached to
S208--Northwoods RFP for new IDIQ for grounds maintenance. Responses to questions from industry.
Solicitation number
36C78620R0078
Issued by

View the file

Other files

File Type Posted
36C78620R0078_1.docx DOCX document
Past Performance Questionnaire solicitation.docx DOCX document
PWS - Northwoods Grounds Maintenance Operations.docx DOCX document
36C78620R0078.docx DOCX document
WD Oneida Couny.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B Base

CLIN
Description:

Grounds & Bldg. Maintenance Services

Est. Qty
Unit
Unit Cost
Total Cost
0001
Turfgrass – mowing and trimming, removal of leaves, organic waste and debris from the Cemetery site, sweeping or blowing off of roads and walkways, - 6 acres @ 36 times per year
36
EA
$
$
0002
Trim headstones, markers and turfgrass in conjunction with every mowing. 6 acres trimmed 36 times per year
36
EA
$
$
0003
Cemetery cleanup – trash, floral (follow Floral Policy), and debris pickup from streets, structures, fence lines, burial and non-burial areas, trash cans, etc.; maintain/stock floral vase bins with Government furnished vases.
52
WK
$
$
0004
Edging – walks, curbs. Remove vegetation from joints and cracks. Remove debris. (6 of times per year)
6
EA
$
$
0005
Turfgrass - pre-emergence herbicide application. (6 acres; April & June)
2
EA
$
$
0006
Turfgrass - post-emergence herbicide spray.

(6 acres; Oct., May, & June)

3
EA
$
$
0007
Turfgrass – fertilization. (6 acres; Oct., June, & Sep.)
3
EA
$
$
0008
Turfgrass – core aerification (6 acres in Sep.)
1
EA
$
$
0009
Turfgrass – over seeding. (6 acres in Sep. immediately after aerification)
1
EA
$
$
0010
Irrigation system – operation and maintenance, shut-down, startup. Includes pond maintenance.
9
EA
$
$
0011
Sod installation after each casket burial.
120
EA
$
$
0012
Sod installation after urn burials, when needed.
20
EA
$
$
0013
Tree/Shrub Maintenance as directed.
0
EA
$
$
0014
Pressure wash and Maintenance headstones, Columbariums, Shelter (exterior and interior), sidewalks, curbs, entrance gate fence prior to Memorial Day and Veteran's Day.
2
EA
$
$
0015
Sunken grave repair (grade correction and replace turf).
15
EA
$
$
0016
Provide support activities involved in setting up the cemetery for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed. Manpower and equipment for high priority events and services at the cemetery. Includes Avenue of Flag placement.
3
EA
$
$
0017
Snow Removal Only - Streets and Parking Lots
15
EA
$
$
0018
Ice Melt Application Only - Streets and Parking Lots
15
EA
$
$
0019
Snow Removal Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
0020
Ice Melt Application Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
Annual Total Estimated Cost:
$

Option Year 1

CLIN
Description:

Grounds & Bldg. Maintenance Services

Est. Qty
Unit
Unit Cost
Total Cost
1001
Turfgrass – mowing and trimming, removal of leaves, organic waste and debris from the Cemetery site, sweeping or blowing off of roads and walkways, - 6 acres @ 36 times per year
36
EA
$
$
1002
Trim headstones, markers and turfgrass in conjunction with every mowing. 6 acres trimmed 36 times per year
36
EA
$
$
1003
Cemetery cleanup – trash, floral (follow Floral Policy), and debris pickup from streets, structures, fence lines, burial and non-burial areas, trash cans, etc.; maintain/stock floral vase bins with Government furnished vases.
52
WK
$
$
1004
Edging – walks, curbs. Remove vegetation from joints and cracks. Remove debris. (6 of times per year)
6
EA
$
$
1005
Turfgrass - pre-emergence herbicide application. (6 acres; April & June)
2
EA
$
$
1006
Turfgrass - post-emergence herbicide spray.

(6 acres; Oct., May, & June)

3
EA
$
$
1007
Turfgrass – fertilization. (6 acres; Oct., June, & Sep.)
3
EA
$
$
1008
Turfgrass – core aerification (6 acres in Sep.)
1
EA
$
$
1009
Turfgrass – over seeding. (6 acres in Sep. immediately after aerification)
1
EA
$
$
1010
Irrigation system – operation and maintenance, shut-down, startup. Includes pond maintenance.
9
EA
$
$
1011
Sod installation after each casket burial.
120
EA
$
$
1012
Sod installation after urn burials, when needed.
20
EA
$
$
1013
Tree/Shrub Maintenance as directed.
2
EA
$
$
1014
Pressure wash and Maintenance headstones, Columbariums, Shelter (exterior and interior), sidewalks, curbs, entrance gate fence prior to Memorial Day and Veteran's Day.
2
EA
$
$
1015
Sunken grave repair (grade correction and replace turf).
20
EA
$
$
1016
Provide support activities involved in setting up the cemetery for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed. Manpower and equipment for high priority events and services at the cemetery. Includes Avenue of Flag placement.
3
EA
$
$
1017
Snow Removal Only - Streets and Parking Lots
15
EA
$
$
1018
Ice Melt Application Only - Streets and Parking Lots
15
EA
$
$
1019
Snow Removal Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
1020
Ice Melt Application Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
Annual Total Estimated Cost:
$

Option Year 2

CLIN
Description:

Grounds & Bldg. Maintenance Services

Est. Qty
Unit
Unit Cost
Total Cost
2001
Turfgrass – mowing and trimming, removal of leaves, organic waste and debris from the Cemetery site, sweeping or blowing off of roads and walkways, - 6 acres @ 36 times per year
36
EA
$
$
2002
Trim headstones, markers and turfgrass in conjunction with every mowing. 6 acres trimmed 36 times per year
36
EA
$
$
2003
Cemetery cleanup – trash, floral (follow Floral Policy), and debris pickup from streets, structures, fence lines, burial and non-burial areas, trash cans, etc.; maintain/stock floral vase bins with Government furnished vases.
52
WK
$
$
2004
Edging – walks, curbs. Remove vegetation from joints and cracks. Remove debris. (6 of times per year)
6
EA
$
$
2005
Turfgrass - pre-emergence herbicide application. (6 acres; April & June)
2
EA
$
$
2006
Turfgrass - post-emergence herbicide spray.

(6 acres; Oct., May, & June)

3
EA
$
$
2007
Turfgrass – fertilization. (6 acres; Oct., June, & Sep.)
3
EA
$
$
2008
Turfgrass – core aerification (6 acres in Sep.)
1
EA
$
$
2009
Turfgrass – over seeding. (6 acres in Sep. immediately after aerification)
1
EA
$
$
2010
Irrigation system – operation and maintenance, shut-down, startup. Includes pond maintenance.
9
EA
$
$
2011
Sod installation after each casket burial.
120
EA
$
$
2012
Sod installation after urn burials, when needed.
20
EA
$
$
2013
Tree/Shrub Maintenance as directed.
2
EA
$
$
2014
Pressure wash and Maintenance headstones, Columbariums, Shelter (exterior and interior), sidewalks, curbs, entrance gate fence prior to Memorial Day and Veteran's Day.
2
EA
$
$
2015
Sunken grave repair (grade correction and replace turf).
25
EA
$
$
2016
Provide support activities involved in setting up the cemetery for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed. Manpower and equipment for high priority events and services at the cemetery. Includes Avenue of Flag placement.
3
EA
$
$
2017
Snow Removal Only - Streets and Parking Lots
15
EA
$
$
2018
Ice Melt Application Only - Streets and Parking Lots
15
EA
$
$
2019
Snow Removal Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
2020
Ice Melt Application Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
Annual Total Estimated Cost:
$

Option Year 3

CLIN
Description:

Grounds & Bldg. Maintenance Services

Est. Qty
Unit
Unit Cost
Total Cost
3001
Turfgrass – mowing and trimming, removal of leaves, organic waste and debris from the Cemetery site, sweeping or blowing off of roads and walkways, - 6 acres @ 36 times per year
36
EA
$
$
3002
Trim headstones, markers and turfgrass in conjunction with every mowing. 6 acres trimmed 36 times per year
36
EA
$
$
3003
Cemetery cleanup – trash, floral (follow Floral Policy), and debris pickup from streets, structures, fence lines, burial and non-burial areas, trash cans, etc.; maintain/stock floral vase bins with Government furnished vases.
52
WK
$
$
3004
Edging – walks, curbs. Remove vegetation from joints and cracks. Remove debris. (6 of times per year)
6
EA
$
$
3005
Turfgrass - pre-emergence herbicide application. (6 acres; April & June)
2
EA
$
$
3006
Turfgrass - post-emergence herbicide spray.

(6 acres; Oct., May, & June)

3
EA
$
$
3007
Turfgrass – fertilization. (6 acres; Oct., June, & Sep.)
3
EA
$
$
3008
Turfgrass – core aerification (6 acres in Sep.)
1
EA
$
$
3009
Turfgrass – over seeding. (6 acres in Sep. immediately after aerification)
1
EA
$
$
3010
Irrigation system – operation and maintenance, shut-down, startup. Includes pond maintenance.
9
EA
$
$
3011
Sod installation after each casket burial.
120
EA
$
$
3012
Sod installation after urn burials, when needed.
20
EA
$
$
3013
Tree/Shrub Maintenance as directed.
2
EA
$
$
3014
Pressure wash and Maintenance headstones, Columbariums, Shelter (exterior and interior), sidewalks, curbs, entrance gate fence prior to Memorial Day and Veteran's Day.
2
EA
$
$
3015
Sunken grave repair (grade correction and replace turf).
30
EA
$
$
3016
Provide support activities involved in setting up the cemetery for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed. Manpower and equipment for high priority events and services at the cemetery. Includes Avenue of Flag placement.
3
EA
$
$
3017
Snow Removal Only - Streets and Parking Lots
15
EA
$
$
3018
Ice Melt Application Only - Streets and Parking Lots
15
EA
$
$
3019
Snow Removal Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
3020
Ice Melt Application Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
Annual Total Estimated Cost:
$

Option Year 4

CLIN
Description:

Grounds & Bldg. Maintenance Services

Est. Qty
Unit
Unit Cost
Total Cost
4001
Turfgrass – mowing and trimming, removal of leaves, organic waste and debris from the Cemetery site, sweeping or blowing off of roads and walkways, - 6 acres @ 36 times per year
36
EA
$
$
4002
Trim headstones, markers and turfgrass in conjunction with every mowing. 6 acres trimmed 36 times per year
36
EA
$
$
4003
Cemetery cleanup – trash, floral (follow Floral Policy), and debris pickup from streets, structures, fence lines, burial and non-burial areas, trash cans, etc.; maintain/stock floral vase bins with Government furnished vases.
52
WK
$
$
4004
Edging – walks, curbs. Remove vegetation from joints and cracks. Remove debris. (6 of times per year)
6
EA
$
$
4005
Turfgrass - pre-emergence herbicide application. (6 acres; April & June)
2
EA
$
$
4006
Turfgrass - post-emergence herbicide spray.

(6 acres; Oct., May, & June)

3
EA
$
$
4007
Turfgrass – fertilization. (6 acres; Oct., June, & Sep.)
3
EA
$
$
4008
Turfgrass – core aerification (6 acres in Sep.)
1
EA
$
$
4009
Turfgrass – over seeding. (6 acres in Sep. immediately after aerification)
1
EA
$
$
4010
Irrigation system – operation and maintenance, shut-down, startup. Includes pond maintenance.
9
EA
$
$
4011
Sod installation after each casket burial.
120
EA
$
$
4012
Sod installation after urn burials, when needed.
20
EA
$
$
4013
Tree/Shrub Maintenance as directed.
2
EA
$
$
4014
Pressure wash and Maintenance headstones, Columbariums, Shelter (exterior and interior), sidewalks, curbs, entrance gate fence prior to Memorial Day and Veteran's Day.
2
EA
$
$
4015
Sunken grave repair (grade correction and replace turf).
30
EA
$
$
4016
Provide support activities involved in setting up the cemetery for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed. Manpower and equipment for high priority events and services at the cemetery. Includes Avenue of Flag placement.
3
EA
$
$
4017
Snow Removal Only - Streets and Parking Lots
15
EA
$
$
4018
Ice Melt Application Only - Streets and Parking Lots
15
EA
$
$
4019
Snow Removal Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
4020
Ice Melt Application Only - Sidewalks/Walkways/Specialty Areas
15
EA
$
$
Annual Total Estimated Cost:
$
Period
Price
Base
$
Option Year One
$
Option Year Two
$
Option Year Three
$
Option Year Four
$
Grand Total
$

File details come from the government source that posted it. Updated .