Non-Developmental Landing Ship RFI.docx
DOCX document 42 KB Posted
- Solicitation number
- N00024-25-R-2470
About this file
This is a Request for Information (RFI) from Naval Sea Systems Command (NAVSEA) seeking information about commercially available non-developmental Landing Ship designs and U.S. shipyard capacity. The RFI specifically seeks designs for vessels capable of shore-to-shore beaching operations with a minimum cargo capacity of 300 short tons and less than 400 feet in length overall.
Respondents must provide details about their entity status, shipyard/design firm classification, and small business status including SDVOSB subcontracting capabilities. Technical requirements include specifications for beach gradient landing capability, cargo capacity, endurance, speed, range, berthing accommodations, and military features. Responses must address construction history, delivery timeline, classification society status, and estimated costs (+/- 10% confidence range). Responses are due by February 7, 2025, via email to the specified NAVSEA contacts. The government notes this is not a commitment to contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Non-Developmental Landing Ship RFI_Amendment 2.docx | DOCX document | |
| Non-Developmental Landing Ship RFI_Amendment 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Non-Developmental Landing Ship Request for Information (RFI) As part of this Request for Information (RFI) Naval Sea Systems Command (NAVSEA) is seeking to understand the commercial availability of a NON-DEVELOPMENTAL Landing Ship design and the current capacity of a shipyard in the United States to build one (if the responder is a shipyard).
The definition of a Landing Ship is a vessel which can conduct shore to shore beaching operations and can offload/onload cargo directly to a beach.
For the purpose of this RFI, the government seeks landing ship designs with a minimum cargo capacity of 300 short tons and less than 400 feet length overall.
The government defines a non-developmental item (NDI) as a commercial product that requires only minor modifications to meet the requirements of a government agency or a product that was developed exclusively for governmental use:
· A product previously developed by a government agency or military service
· A product that is already in use by a government agency
· A commercially available and demonstrated item The terms "commercial items" and "non-developmental items" are defined in Part 2 of the Federal Acquisition Regulation (FAR).
For further clarification, in terms of this RFI a Non-Developmental Vessel is a ship design that is complete, i.e., past functional design and is under contract to be built or has been built previously.
To satisfy the requirements of this RFI, the NAVSEA is asking for written answers to the following questions regarding a Non-Developmental Landing Ship as defined above.
1. Provide a response to the following questions:
a. What is your Unique Entity Identifier from SAM.gov?
b. Are you a shipyard, a design agent/engineering firm, or other?
c. If a design agent/engineering firm, which shipyard(s) are you or have you teamed with to build your design?
d. Are you a small business, as defined in the North American Industry Classification System (NAICS) code 336611?
i. Are there small businesses with which you envision subcontracting?
ii. Will congressionally mandated Department of Defense subcontracting goals of five percent (5%) for service-disabled veteran-owned small business (SDVOSB) be achieved with your envisioned subcontracts?
e. What are the performance aspects of your design? Specifically:
i. Beach Gradient Landing Capability at Full-Load Displacement (i.e. what is the shallowest slope of a beach on which the ship can land and recover itself). Response to slope should be in terms of 1 foot of water depth for every foot of horizontal distance from shore as 1(foot):X (horizontal distance from shore). See Figure 1.
Figure 1: Beach Slope Definition
ii. Full Load Displacement cargo carrying capacity (in short tons)
iii. Cargo area (in square feet)
iv. Endurance and sustained speed at Full Load Displacement (in knots)
v. Range at endurance, sustained, and maximum speeds at Full Load Displacement (in nautical miles)
vi. Length, beam, and draft (at Full Load Displacement) of the ship in feet
vii. Berthing accommodations for crew and other embarked personnel including:
1. Frozen, refrigerated, and dry stores capacity
2. Potable water capacity
3. Gray and black water capacity
4. Standards to which berthing and hotel accommodations were designed
viii. Any military features included in the design such as underway replenishment capabilities, aviation support, ammunition or explosive stowage, etc.
ix. Ability to nest abeam
f. How many ships of this design have been constructed or are under contract? If you are a shipyard, and were awarded a contract to construct the Non-Developmental Landing Ship within nine months from the response date of this RFI:
i. How long would it take to deliver, in months?
ii. Does your shipyard have capacity to immediately start construction of a Non-Developmental Landing Ship? If not, when could construction start at your shipyard?
iii. Who should the Government contact if it wants to arrange a visit to see an existingship?
iv. Has the American Bureau of Shipping (ABS), Det Norske Veritas (DNV), Lloyds, or another classification society previously classified this design? If not, how long do you anticipate that taking and at what cost (+/- 10% confidence range)?
v. The last time the ship was constructed, what was the total material and construction cost at delivery?
vi. Within a +/- 10% confidence range, what is your current total cost estimate for delivery of a Non-Developmental Landing Ship of this design to the Navy?
This announcement is not a contract, a request for proposal, a promise to contract, or a commitment of any kind on the part of the Government. The Government will not reimburse respondents for any questions submitted or information provided as a result of this announcement.
Please submit responses to this RFI via e-mail to elizabeth.feliciano-hernandez.civ@us.navy.mil and zachary.m.tucker2.civ@us.navy.mil by February 7, 2025.