This document is Addendum #7 for the Nome Hangar Remodel Project, issued by the Alaska Department of Military and Veterans Affairs (DMVA) Design and Construction office located in JBER, Alaska. The addendum provides clarifications for a construction project in Nome, Alaska, specifically addressing contractor responsibilities for moving connexes and sheds, and detailing door installation requirements for specific entryways (100A, 100B, 100C, and 100D). The addendum specifies that the contractor will install doors in four existing entryways, using knock-down (KD) drywall frames and polystyrene core doors, with mortise locks but no specified key system.

The addendum confirms that doors 101C and 107 are not to be replaced, and provides contact information for Scott Stewart, the Building Management Specialist, who can be reached at scott.stewart@alaska.gov or (907) 428-7198. The document serves to modify previous contract documents and takes precedence in case of any conflicts with earlier issued specifications or drawings. No specific pricing, funding sources, or contract term details are provided in this addendum, which appears to be focused on clarifying technical and scope-related questions for potential contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Military and Veterans Affairs FMO Design and Construction 57024 Roosevelt Rd PO Box 5169

JBER, AK 99505

Email: scott.stewart@alaska.gov

Issue Date: September 9/15/25 ATTN: Vendors

RE: Project Name: Nome Hangar Remodel Project Number: 02C5025013 Project Location: Nome, Alaska

Addendum #7 This addendum forms a part of the contract documents and modifies the original drawings and/or specifications for the subject work. In case of conflicts between this addendum and previously issued documents, this addendum shall take precedence.

1. Is the contractor responsible for moving the connexes and sheds as shown on the drawings?

Confirm scope: Yes

1. There isn’t a door schedule. From ITB and the addendum there is direction to provide the alcove / enclave / arctic entry doors (100A, 100B, 100C, 100D, 108). We are not replacing doors we are only installing doors on the 4 existing entryways, not the main entry. This includes doors 100A, 100B, 100C & 100D

2. Are doors 101C & 107 to be replaced as well? No

3. Are we quoting KD drywall frames and polystyrene core doors? Yes

1. Addendum mentions mortise locks. No other hardware is described. Key system? No key system