noca10(7)_PrelimPlans.pdf

PDF 10 MB Posted

Attached to
WA NPS NOCA 10(7) Stehekin Valley Road Emergency Reroute
Solicitation number
69056721B000021
Issued by

About this file

This document provides details for a federal contract opportunity to develop preliminary plans for rerouting a section of the Stehekin Valley Road in Washington State. The Department of Transportation Federal Highway Administration is soliciting firms for a pre-solicitation notice under opportunity number 69056721B000021. According to the attached preliminary plans and letter, the project involves developing an emergency reroute for Stehekin Valley Road due to unstable conditions along an existing segment. The document includes a project description but no further information on response dates, pricing terms, or other procurement details.

View the file

Other files

File Type Posted
PM-10(7)-PreAd-Ltr-10(7) (002).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

e (max)

V

ADT (2041)

ADT (2020)

0.04

30 MPH

Project Location

APPROVED:

DATE

Re-alignment/new construction

TYPE OF CONSTRUCTION:

DESIGN DESIGNATION:

SPECIFICATION:

D. ARENA

PROJECT MANAGER

Western Federal Lands Highway Division

Chief of Engineering, Construction of Roads and Bridges

Standard Specifications for on Federal Highway Projects, FP-14

BRITISH COLUMBIA

I D

A H

O

OREGON

UNITED STATES

CANADA

P A

C I F I C

O C

A E

N tS raitofJuandeFuca

OC

LU

MBIA RI

VER

A S N

KE

R

VERI

M

COLU B

I A

V R I

E R

Lakes

Banks

Lakes

Moses

Reservoir

Potholes

PARK

NATIONAL

OLYMPIC

N.P.

RAINIER

MOUNT

MON.

NAT'L VOLC.

ST. HELENS

MOUNT

PARK

NATIONAL

CASCADES

NORTH

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee

Lake

Moses

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

ANGELES

PORT

Townsend

Port Vernon

Mt.

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

u n d o S t e g u

P

PROJECT LOCATION

See Sheet A.3 for Vicinity Map

Δ

N

SCALE IN MILES

10 2

EMERGENCY REROUTE

STEHEKIN VALLEY ROAD

NPS PMIS NO. 30506

WA NPS NOCA 10(7)

NORTH CASCADES NATIONAL PARK

NATIONAL PARK SERVICE

U. S. DEPARTMENT OF THE INTERIOR

PLANS FOR PROPOSED PROJECT

WASHINGTON

CHELAN COUNTY

LENGTH 0.29 MILES

NATIONAL

PARK

SERVICE

Department of the Interior

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

C om pa ny C re ek Company

Cr ee k

Lake Battalion

C a b in

C a b in C re e k

M o o n C re e k

S u n

B la ck be rr y

C re ek

Bench

R a in b o w C re e k

Marg eru m Cr ee k

Campground High Bridge

L a k e C h e la n

STEHEKIN

Litt le

Boulder

Creek

Bo uld er

Creek

D ev or e

WENATCHEE

NATIONAL FOREST

LAKE CHELAN

NATIONAL RECREATION AREA

Stehekin River

Steheki n River

M oon

C re ek Stehekin

Cr ee k

C o m p an y

C re ek

C a b in

R

E

T33N C re e k

Cr ee k

Creek

Ba tta lio n

Cr ee k

Creek

Valley

Road Stehekin, 5.8 M iles

:4

P

M

S e p te m b e r

T it le

S h e e t c p w

-w o rk \d

\n o c a g e n -1

,3 ,4

.d g n

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) A.1

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

PRELIMINARY - N

OT FOR CONSTRUCTION

DETAIL APPROVED FOR USE 11/2001

REVISED: 9/2005 1/2007 10/2009 10/2014

W101-1

AND ABBREVIATIONS

PLAN SYMBOLS

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e

E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT

Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north

OG

OD

o. to o.

o. c.

original ground outside diameter out to out on center pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W

R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph

V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material

BH

CP GPS

JH

TP

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

N

E

RIP

G G

W W

DI

T T

NOTE:

NO SCALE

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use,

- no symbol -

EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut wall face

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

N

Fiber Roll or Wattle

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DETAIL APPROVED FOR USE 11/2001

REVISED: 9/2005 1/2007 10/2009 10/2014 W101-1

AND ABBREVIATIONS

PLAN SYMBOLS

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north

OG

OD

o. to o.

o. c.

original ground outside diameter out to out on center pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material

BH

CP GPS

JH

TP

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

RIP

G GW W

DI

T T

NOTE:

NO SCALE

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use,

- no symbol -

EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut wall face

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

N

Fiber Roll or Wattle

WESTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAIL

U.S. CUSTOMARY DETAIL

DIDI

:5 e p te m b e r

P la n

S y m b o ls c p w

-w o rk \d

\n o c a g e n -1

,3 ,4

.d g n

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) A.2

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

130 173

N

SCALE IN MILES

05 5 10 15

SCALE IN MILES

0 4

SCALE IN MILES

0 4

N

LOWER FIELD PROJECT LOCATION

END PROJECT

BEGIN PROJECT

"ROCK QUARRY"

COMPANY CREEK

LONG: 120°44'5.69"W

LAT: 48°21'39.83"N

LONG:120°44'5.02"W

LAT: 48°21'39.56"N

LONG: 120°43'28.66"W

LAT: 48°20'43.45"N

LOWER FIELD

LONG: 120°45'54.33"W

LAT: 48°22'21.11"N

"LOG YARD"

COMPANY CREEK

LONG: 120°43'8.20"W

LAT: 48°20'44.24"N

L A

K E

CHELAN

Mad

River

R iv e r

C h iw a w a

F o r k

E n tia l

R iv e r

River

Little

W enatchee

R iv e r

W h ite

R iv e r

N a p u o n u a

Ra ilr oa d

Creek

A g n e s

C re e k

P ri n c e

C r

D ew C r

North Cold Cr

Libby C reek

Wat Creek

Tw isp River

BRIDGEPORT

CHELAN FALLS

WENATCHEE

FOREST

GLACIER

PEAK

NATIONAL

FOREST

STEHEKIN

Stehekin

V alley

Road

S te h e k in

River

Foggy

Fk

Stehekin, 5.8 M iles

Stehekin

V a lle y

Road

River

Stehekin

25+00, MP 5.9

WA NPS NOCA 10(7)

11+30, MP 5.8

WA NPS NOCA 10(7)

C o m p a n y C re e k R o a d

:0 e p te m b e r

V ic in it y M a p -1 p w w o r k

\d

\n o c a g e n

,3 ,4

.d g n

VICINITY MAPS

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) A.3

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

1+00 to 2+80

DRIVEWAY

NO SCALE

[1]

FOOTNOTES:

2% out slope

[1

C le a ri n g l im it s

C le a r in g l im it s

Existing ground

TRANSITION DETAIL

EXISTING TO NEW ALIGNMENT

[2]

N E

W A

L

IG

N M

E N

T

M a tc h e x is ti n g r o a d s e c ti o n

EXISTING aggregate base

8' Traveled way

Existing ground

CL

2% crown

C le a ri n g l im it s

C le a ri n g l im it s

11+30 to 25+00

STEHEKIN VALLEY ROAD REALIGNMENT

2% crown

[1

[2

Profile grade

Roadway aggregate method 2, surface course, 6-inch compacted depth

6-inch unclassified borrow

Chip Seal Surface Treatment (includes shoulder), type 2B

Roadway aggregate method 2, surface course, 6-inch compacted depth

12-inch unclassified borrow base with chip seal 6-inch aggregate

EXISTING aggregate base

8' Traveled way

Turf establishment limits6' Traveled way6' Traveled way

Chip Seal Surface Treatment (includes shoulder), type 2B

Profile grade

5'

Turf establishment limits

5'

Turf establishment does not apply in areas with riprap ditch.

Cutbank slopes vary based on cut heights, 1:3 (typ.), 1:2 (max.).

unclassified borrow Fill embankment, 1:3 1:3

1:3 1:3

Va rie s

Va rie s

Turf establishment limits+ 1' Shoulder =

7' (typ.)

+ 1' Shoulder =

7' (typ.)

+ 1' Shoulder =

5' (typ.)

+ 1' Shoulder =

5' (typ.)

Turf establishment limits

5'

5'

:0 e p te m b e r

T y p ic a l S e c ti o n s -1 p w

-w o rk

\d \w a -n o c a c a .d g n

TYPICAL SECTIONS

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) C.1

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

C

.9

.0

P O

B

T

.1

P C

.4

P T

.1

P C

.2

P T

.2

P T

.0

P C

.6

1 1 e = Match Exisiting

L = 229.16'

T = 117.12'

R = 450.00'

Δ = 29°10'38" (LT)

PI 11+25.06

e = -4.00% L = 83.44' T = 43.34' R = 125.00'

Δ = 38°14'47" (RT)

PI 13+19.98

e = -4.00% L = 78.72' T = 39.85' R = 205.00'

Δ = 22°00'06" (LT)

PI 14+27.31

e = -4.00% L = 40.02' T = 20.28' R = 100.00'

Δ = 22°55'41" (LT)

PI 16+38.48

Line to be constructed

Stehekin Valley Road profile grade

Existing ground

Clearing limits

Slope stake limits

Outlet: 15+27, 15.29' LT Inlet: 15+60, 17.32' RT Install new 55-ft, 24'' Pipe culvert

Apparent Highwater flexible (ground mounted) Install Delineator, type 12+75 to 13+60

See sheet G.2 for details Limits of disturbance, Outlet: 12+44, 25.36' LT Inlet: 12+67, 17.20' RT Install new 48-ft, 24'' Pipe culvert

IE Outlet: 1256.18' IE Inlet: 1258.84' Install new 55-ft, 24'' Pipe culvert

IE Outlet: 1243.20' IE Inlet: 1243.92' 24'' Pipe culvert Install new 48-ft, Adjacent property line

Roadway reconditioning 11+30 to 12+20

Bottom of drainage ditch

See sheet D.6 for details Install Single arm gate

Weed containment area 11+30 to 13+60

Joint between Chip Seal and gravel roadway surface

25 0 25 50 75

Scale in feet

10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00

1,240 1,240

1,250 1,250

1,260 1,260

1,270 1,270

-0.500%

+2.500%

-0.537% MATCH EXISTING

+7.5 00%

.5

.8

.7

.5

' VC35

17.02K =

'542.42SSD =

' VC100

20.02K =

'266.07SSD =

' VC40

19K =

'704.48HLSD =

' VC105

13K =

'99.07HLSD =

,2

.9

BEGIN PROJECT

11+30

WA NPS NOCA 10(7)

B E

A R

T R

A P

S P

R

IN

G

STEHEKIN RIVER

EL 1244.98

E 1665545.002 N 496046.253

STEHEKIN VALLEY ROAD

:4 e p te m b e r

P la n a n d P ro fi le

S h e t] p w

-w o rk

\d \n o c a p p .d g n

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) D.2

NPS Drwg. No. 168/175130 NPS PMIS No. 305506 e = ___

'69.68L =

'35.48T =

'150.00R =

(RT)26°37'00"Δ =

18+05.15PI

e = ___ '41.10L = '20.96T = '85.00R =

(RT)27°42'16"Δ =

22+06.61PI

e = ___ '75.10L = '38.72T = '125.00R =

(RT)34°25'28"Δ =

23+61.09PI

e = ___ '66.55L = '35.09T = '85.00R =

(LT)44°51'30"Δ =

19+54.39PI

e = ___ '35.64L = '18.09T = '85.00R =

(LT)24°01'33"Δ =

21+18.06PI

W

N

P C

.6

P T

.3

P C

.3

P T

.8

P C

.9

PT

.6

PC

.6

P T

.7

P C

.3

P T

.4

Line to be constructed

Clearing limits

Slope stake limits

Stehekin Valley Road profile grade property corner Adjacent

See sheet E.2 for Plan and Profile Driveway alignment, Move and place boulder 17+80 flexible (ground mounted) Install Delineator, type 23+20 to 24+00

Existing grade

IE Outlet: 1260.94 ft IE Inlet: 1261.90 ft Install new 53-ft, 24'' Pipe culvert

Driveway

=POB 1+00

Stehekin Valley Rd 23+97.47

Bottom of drainage ditch

Outlet: 23+73.14, 27.16 LT Inlet: 23+50.00, 16.88' RT 24" Pipe culvert Install new 50-ft, Clearing limits

IE Outlet: 1260.90 ft IE Inlet: 1261.95 ft culvert Install new 50-ft, 24'' Pipe

Tree protection fence

Outlet: 23+70.53, 28.59' LT Inlet: 23+45.09, 16.74' RT 24" Pipe culvert Install new 53-ft, -4.00%

-4.00%

4.00%

4.00%

4.00%

25 250 50 75

Scale in feet

18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00

1,250 1,250

1,260 1,260

1,270 1,270

1,280 1,280

1,290 1,290

+5.50 0%

-8.000%

-0.750%

MATCH EXISTING

+2.500%

.7

.8

.9

.7

.4

L

.7

H

' VC120

8.89K =

'139.99SSD =

' VC45

15K =

'214.05HLSD =

' VC45

6K =

'66.06HLSD =

' VC20

13K =

'INFHLSD =

,2

.9

25+00

WA NPS NOCA 10(7)

END PROJECT

El=1263.96 E= 1664348.395 N= 496496.381

DRIVEWAY

STEHEKIN

VALLE

Y ROAD

:0 e p te m b e r

P la n a n d P ro fi le

S h e p w

-w o rk

\d \n o c a p p .d g n

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) D.3

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

2524 25

" D

IA

C

M P

Stehekin Valley Road profile grade

Existing ground

Gravel staging area culvert inlet

Connect ditch to existing

.2

P

O

T

.4

Cleaning culvert in place

Slope stake limits

Clearing limits

N

25+00

1,250 1,250

1,260 1,260

1,270 1,270

1,280 1,280

1,290 1,290

+0.833%

,2

.9

END PROJECT

25+00

WA NPS NOCA 10(7)

STEHEKIN RIVER

EL: 1263.96

E: 1664348.395

N: 496496.381

STEHEKIN VALLEY ROAD

Scale in feet

25 0 25 7550

:0 e p te m b e r

P la n a n d P r o f il e

S h e p w w o r k

\d

\n o c a p p .d g n

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) D.4

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

GPK FILE DATED JAN 24, 2007

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

20101 495651.478 1665957.509 1249.043 48°21'31.468221"N 120°43'41.802597"W N/A 0.999891414 5/8" IR W/FHWA ALUM CAP 1.

20102 495914.203 1665717.711 1253.972 48°21'34.064101"N 120°43'45.348154"W N/A 0.999891231 5/8" IR W/FHWA ALUM CAP

20103 496070.946 1665549.120 1246.225 48°21'35.613139"N 120°43'47.841488"W N/A 0.999891633 5/8" IR W/FHWA ALUM CAP

20104 496160.408 1665536.682 1251.452 48°21'36.496147"N 120°43'48.023890"W N/A 0.999891402 5/8" rebar no cap

20105 496230.046 1665396.707 1255.399 48°21'37.185209"N 120°43'50.095254"W N/A 0.999891227 5/8" rebar no cap

20106 496222.046 1665278.551 1251.691 48°21'37.107816"N 120°43'51.845065"W N/A 0.999891403 5/8" rebar no cap

20107 496319.153 1665207.567 1264.490 48°21'38.067031"N 120°43'52.894290"W N/A 0.999890811 5/8" rebar no cap

20108 496418.190 1665051.467 1275.747 48°21'39.046399"N 120°43'55.203898"W N/A 0.999890294 5/8" rebar no cap

20109 496492.437 1664878.797 1278.902 48°21'39.781330"N 120°43'57.759383"W N/A 0.999890158 5/8" rebar no cap

20110 496418.433 1664727.711 1276.261 48°21'39.052976"N 120°43'59.998119"W N/A 0.999890269 5/8" rebar no cap

20111 496413.399 1664610.149 1272.735 48°21'39.004802"N 120°44'01.739091"W N/A 0.999890437 5/8" rebar no cap

23123 496419.797 1664443.488 1263.477 48°21'39.070060"N 120°44'04.206909"W N/A 0.99989088 1/2" IR W/YPC

23124 496905.752 1663765.301 1277.428 48°21'43.874109"N 120°44'14.240621"W N/A 0.999890313 1/2" IR W/YPC

29101 497180.599 1663753.901 1298.670 48°21'46.586536"N 120°44'14.404361"W N/A 0.999889354 5/8" IR W/ ALUMINUM CAP

29102 497368.967 1663671.025 1308.552 48°21'48.446436"N 120°44'15.628184"W N/A 0.999888921 5/8" IR W/ ALUMINUM CAP

PROJECT : Stehekin Valley Road Emergency Reroute

DATE OF FIELD WORK : 10/2020

DATE OF FINAL ADJUSTMENT : ???

PROJECT UNITS : US Survey foot COORDINATE SYSTEM : Washington North SPCS NAD83

EPOCH DATE : 91

VERTICAL DATUM : NAVD88

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

C

M yF ile s\

Pr oj ec ts

_2

0\ W as hi ng to n\ St eh ek in \2

0_ en tr y\ M er ge

\p w

St eh ek in _N

O C A

(7 em er ge nc y

-D ec -2

8:

A M

W

FL

H D

S ur ve y

W

FL

H D

S ur ve y

D es ig ne d by

C he ck ed b y:

STATE PROJECT

D.5

SHEET

NUMBER

NPS NOCA 10(7)WA

SURVEY CONTROL

NPS PMIS No. 305506 NPS Drwg. No. 168/175130

DETAIL B

PLAN

NOTE:

DETAIL A

TIEBACK POST

DETAIL

DRAIN

DETAIL

Chain

Chain

Concrete match ground conditions

Slope concrete to

" plate8

" Plate4

" Plate2

5" x 5" x " PVC pipe2 chain (black, 24" length)

" carbon steel4 3Provide

GATE WIDTH DIMENSION

W1 W2DESCRIPTION

FOOTNOTE:

[1]

16'-0" 5'-4"[2]16-foot gate width

[2]

Concrete

Concrete steel pipe cap

Threaded to fit

16" allternating red/white steel pipe

Standard

3" Ø

" Ø Hole8 cap 4" Ø " Plate 8 sleeve (adjustable) " Ø Pipe2 weld nut to sleeve " Ø Bolt & nut,2

Standard steel pipe

3" Ø x 6'2 chains required per post weld first link to sleeve, " Ø Chain by 1' long,8 weld to pipe and pin " Ø Chain, 2

" Ø Steel rod2

" Ø hole8

Drill

Steel pipe cap (threaded), for 3" Ø pipe

See Detail B this Sheet

See Drain Detail this Sheet

3" Ø Standard steel pipe steel pipe

3" Ø Standard

" Ø Standard steel pipe2

3" Ø Standard steel pipe

Gate (horizontal member)

W2

Existing roadway

Receiver Post

Install Gate per SCR Section 619.

See D Sheets for location.

and may be adjusted in the field by the CO.

Installation shown on right side gate width is approximate per detail A " loop8

Install Double Lock system

LOOP

Edge of pavement

Edge of aggregate

5. See I-sheets for gate quantities.

4. Paint gate upon completion. See SCR Section 619 for color.

the field.

3. Verify width of gate and post height required at each location in

2. Provide locking device as shown in Detail B.

-inch fillet.4

1. All welds shall be

(Front and back of gate)

Object marker, type 3, [3]

[3]

3"

" max.2

W1

W2 W2

24"

24" m in

3" min

2'

2'

12"

:2

A e p te m b e r

H a lf

G a te

D e ta il p w

-w o rk \d

\n o c a

H

A L

F G

A T

E .d g n

GATE DETAILS

TUBULAR METAL

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) D.6

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

Pay Limits

Fiber Roll

FIBER ROLL .JOINT DETAIL

Place excavated material on uphill side of fiber roll

Fill slope

Trench 2" min.

Place excavated material on uphill side of fiber roll

Stagger joints (typ.)

Fiber Roll

12" min.

FIBER ROLL AS PERIMETER CONTROL

FIBER ROLL SPACING TABLE*

Slope Gradient 9" f?J Fiber Roll Maximum soacina (ft)

1 V:4H or flatter 60 Between 1V:4H and 1V:3H 45 Between 1V:3H and 1V:2H 30

1 V:2H or steeper 15 *Approximate spacing shown. Adjust spacing as needed due to project-specific conditions.

Install fiber rolls along contours

A

L Flow

Install fiber rolls below culvert as needed to control runoff See note 6

FIBER ROLL

NPS PMIS No. 305506

STATE

NPS Drwg. No. 168/175130

PROJECT

SHEET

NUMBER

WA NPS NOCA 10(7)

NOTE:

1. Repair all rills or gullies and properly compact prior to installation.

2. Install fiber rolls along slope contours. For any 20' section of fiber roll, do not allow the fiber roll to vary more than 5% from level.

3. Stake fiber rolls in place with 1" x 1" or 1 "f?J wood stakes. Space stakes 4' o.c. max. on slopes and 2' o.c. max. culverts. Stake fiber rolls 6-inches from each end.

4. Drive stakes into undisturbed soil at least 12" deep.

Expose stakes 2" above top of fiber roll.

5. For fiber rolls on bare soil, construct trenches parallel to the contour. Place fiber rolls in continuous contact with trench bottom and sides. Tamp soil backfill against upstream side of fiber roll to ensure storm water is forced to flow through fiber roll rather than under it.

F.6

6. Place fiber rolls all the way around the inlet when the disturbance is on both the road and around the culvert and all water entering the culvert is crossing the disturbance.

Install fiber rolls around culvert inlet See Fiber Rolls at Culverts table for length requirements

Culvert inlet with flared end section

A

J

Install fiber rolls around culvert outlet See Fiber Rolls at Culverts table for length requirements

Culvert outlet with flared end section

Flow

FIBER ROLL

AT CULVERT INLET AT CULVERT OUTLET

12" min.

Place excavated material on uphill side of fiber roll

Fill or cut slope

Flow

Trench fiber roll 2" min.

SECTION A-A

FIBER ROLLS AT CULVERTS*

Culvert Size 9" f?J Fiber Roll length (ft)

24" or smaller 10 30" to 48" 20

54" or larger 30

NO SCALE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

FIBER ROLL

INSTALLATION DETAIL STAKE DETAIL

i i§

*Approximate length shown for rolls across the "' top of the culvert inlet only. Adjust length as DETAILAPPRov•o ,o• us• 01

11 DETAIL

n e e d e d d u e t o

_P_"_o_if e c t s p e

_c_ifi_i c c o n d it

_i o n s _______ L•-EV-1s_•o_, _

, ___________ L...:C::..:l.::S�7--.:5:.:5::..J u Ul 2.

Trench 2" (min.)

Place excavated trench material on uphill side of fiber roll

CROSS SECTION

See Note 5

Fiber roll 9" 0 (min.)

Flow line

Trench 2" (min.)

FIBER ROLL

STAKING DETAIL

PLAN

V-ditch design shown.

Check dam installation details are similar for flat-bottom ditches

FIBER ROLL

CHECK DAM SPACING*

(See Note 7)

DITCH CHECK DAM

GRADE

SPACING (max.)

(FT)

2% 150 3% 100 4% 80 5% 60

* Spacing calculated based on 9" 0 minimum fiber roll.

Do not use fiber roll check dams on ditch grades steeper than 5%.

Curve ends upstream to prevent flow around the ends. See Note 6

FIBER ROLL CHECK DAM

Filter rock

Filter rock

V-DITCH

CROSS SECTION

FLAT-BOTTOM DTICH

CROSS SECTION

.s E:

STATE PROJECT

NOTE:

1. Construct check dams from fiber rolls, filter rock, or gravel bags as approved by the CO, to meet the functional requirements of the check dam device.

2. Repair all rills or gullies and properly compact prior to installation.

3. Install check dams in ditches perpendicular to the flowline.

4. Stake fiber rolls in place with 1 ¾-inch x 1 ¾-inch wood stakes. Drive stakes at each end of the fiber roll and at 2-foot (max.) spacing.

5. Drive stakes into undisturbed soil of trench bottom.

Expose stakes 2-inches (min.) above top of fiber roll.

6. Provide sufficient length to prevent water from flowing around the ends of the fiber roll.

7. Adjust check dam spacing based on site-specific conditions.

FILTER ROCK

CHECK DAM SPACING

(See Note 7)

DITCH CHECK DAM

GRADE

SPACING (max.)

(FT)

2% 150 3% 100 4% 80 5% 60

6% 50 GRAVEL BAG

CHECK DAM SPACING*

SHEET

NUMBER

FILTER ROCK CHECK DAM (See Note 7)

CROSS SECTION

GRAVEL BAG CHECK DAM

NO SCALE

DITCH CHECK DAM

GRADE SPACING (max.)

(FT)

2% 150 3% 100 4% 80 5% 60 6% 50

* Do not use gravel bag check dams on ditch grades steeper than 6%.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

CHECK DAM

MODERATE GRADES

DETAIL APPROVED FOR USE --/---- DETAIL

REVISED: 7/2016 W157-15

U1

C:

Cl

"O N d, N

It\

" It\

"' "' N

:9-c:

B "O e C.

i;I

Ql

E u

N

It\

Anchor Trench, see Detail D i

Erosion control blanket

I ' , Compacted native soil I Staples 12" (max.) c-c

DETAIL A

INITIAL ANCHOR

PERSPECTIVE VIEW

Staple 6" (max.) c /, Compacted native soil

~ Staple 3' (max.) c-c

DETAIL B

CHECK SLOT

See Note 2

Erosion control blanket

Shingle splice, see Detail C

Erosion

STATE PROJECT

NOTE:

1. Install staples according to the manufacturer's recommendations.

2. Provide check slots according to the manufacturer's recommendations.

3. Roll ends may be spliced in a check slot.

4. Trapezoidal ditch shown. Similar details for a V-ditch.

Anchor trench, see Detail D

SHEET

NUMBER

control blanket

Staple

DETAIL C

SHINGLE SPLICE

taple Compacted native soil

Staple 12" (max.) c-c \

NO SCALE

DETAIL D

ANCHOR TRENCH

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

ROLLED EROSION CONTROL

PRODUCT IN CHANNELS

DETAIL APPROVED FOR USE --/---- DETAIL

REVISED: 10/2016 W629-2

N

A

A

TYPICAL SECTION A-A

2%

25' to 45'

Proposed roadway

Existing ground

Proposed grade

N.T.S.

10 200510

SCALE IN FEET

Limits of disturbance

Limits of disturbance

Existing road

Install gate per Sheet D6

Limits of distrubance

:5 e p te m b e r

U n n a m e d P la n

P la n

S h e p w w o r k

\d

\T y p ic a lS e c ti o n s A

A .d g n

SECTION A-A

ROADWAY OBLITERATION DETAIL

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) G.2

NPS DRWG. NO. 168/175130 NPS PMIS NO. 305506

U1

C:

Cl

If\ N

M

" If\

"' "' N

:9-c:

B

"O e C.

i;I

Ql

E u

Dia.

or Span

Dia.

or Span

L

PLAN VIEW

CULVERT WITH STANDARD

END SECTION

Original ground

Geotextile

SECTION A-A

Dia.

or Span

L

PLAN VIEW

CULVERT WITHOUT STANDARD

END SECTION

Original ground

Geotextile

SECTION 8-8

PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH

L

:S

.c: :s::

.}:J c:- ·- <:: Cl :§

-Cl

~E

PLAN VIEW

CULVERT WITH STANDARD

END SECTION

Match existing ditch slope

SECTION C-C

Dia.

or Span

L

E

PLAN VIEW

CULVERT WITHOUT STANDARD

END SECTION

Original ground Match existing ditch slope

--__LTT1'0-"f7T!: ~1i Geo textile

SECTION D-D

OUTLET WITHOUT DITCH

PROTECTIVE APRON DIMENSIONS AND QUANTITIES

FOR INFORMATION ONLY

CULVERT APRON APRON ESTIMATED ESTIMATED

SIZE RIPAP LENGTH DEPTH RIPRAP GEOTEXTILE

D CLASS L H QUANTITY QUANTITY

(INCHES) (FEET) (INCHES) (CUYD) (SQYD)

12 2 4 18 1.0 5 18 2 6 18 2.2 9

WITH 24 2 8 18 3.9 13

END 30 3 12.5 24 10.8 27

SECTION 36 3 15 24 15.6 37

42 4 21 30 34.0 63 48 4 24 30 44.4 78 12 2 6 18 1.7 7 18 2 8 18 3.2 12

WITHOUT 24 2 10 18 5.2 17

END 30 3 14.5 24 13.2 32

SECTION 36 3 17 24 18.5 42

42 4 23 30 38.7 70 48 4 26 30 49.8 86

OUTLET WITH DITCH

PROTECTIVE APRON DIMENSIONS AND QUANTITIES

WITH

END

SECTION

WITHOUT

END

SECTION

Original ground

CULVERT

SIZE

D

(INCHES)

Geotextile

FOR INFORMATION ONLY

RIPAP

CLASS

APRON APRON

LENGTH DEPTH

L H

(FEET) (INCHES)

4 18 6 18 8 18

12.5 24 15 24 21 30 24 30 6 18

8 18 10 18

14.5 24 17 24 23 30 26 30

Sloped 1V:2H or flatter

I~

~ .s Cl ,S

Flowline

SECTION E-E

ESTIMATED

RIPRAP

QUANTITY

(CUYD)

0.9 2.0 3.6 9.3

13.3 27.2 35.6 1.3 2.7 4.4

10.7 15.1 29.8 38.5

ESTIMATED

GEO TEXTILE

QUANTITY

(SQYD)

PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH

NO SCALE

STATE PROJECT

NOTE:

1. Use for aprons serving culverts with slopes less than 10%.

2. Furnish separation and stabilization geotextile.

3. Do not measure riprap placement excavation for payment.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

PLACED RIPRAP AT

CULVERT OUTLETS

SHEET

NUMBER

DETAIL APPROVED FOR USE -·/-·-- DETAIL

REVISED: 8/2016 W251-1

U) Q)

"E f!!.

,e "i::

"' "O

.!Q cu u ...J

LL _,,

" " 0

"' "' N

:9-c

B

"O e C.

i;I

Q)

E u

<t

"' LO

"' rl N

"' 2 .0

11:.

"' N

SIGN SPACING TABLE

ROAD TYPE

Urban and Rural 30 MPH and less Urban and Rural 35 MPH to 50 MPH Rural greater than 50 MPH Expressway/ Freeway

G20-2

END

ROAD WORK

ROAD WORK

NEXT xx MILES

G20-1 See Note 11

See Note 10

DISTANCE BETWEEN

SIGNS IN FEET

A B 100 100 350 350 500 500

1000 1500

W20-1 over W16-8P See Note 9 r;;ii W13-1P ll3I (optional)

C

W20-1

G20-2

END

ROAD WORK

END

ROAD WORK

G20-2

W20-1 r;;ii W13-1P ~ (optional)

J)

G20-1 See Note 11

END

ROAD WORK

G20-2

ROAD WORK

NEXT xx MILES

W20-1 over

W16-BP

See Note 9

STATE PROJECT

NOTE:

1. Erect all project advance warning signs before starting construction work.

2. Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.

3. Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.

4. Additional or different message signs may be required to fit the actual construction conditions.

5. Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.

6. Ensure all sign supports exposed to impact by traffic meet the requirements of NCHRP-350 or MASH for crashworthiness.

7. Maintain two-way traffic during all non-work hours except as approved by the CO.

8. Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.

9. If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).

10. The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 sign when approach speeds exceed 50 MPH. When used place the two W20-1 signs "B" feet apart according to the Sign Spacing Table.

11. For work zones that are 2 miles or more in length, install G20-1 signs at each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.

12. If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.

13. State standards may be used as an alternative if approved by the CO.

14. Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

SHEET

NUMBER

U.S. CUSTOMARY STANDARD

TEMPORARY TRAFFIC CONTROL

ADVANCE SIGNING

NO SCALE

STANDARD APPRDVED FDR USE 6/2005

REVISED:

DRAFT: 6/2014

STANDARD

635-1

<fl

C:

0, "O r;:

"' a, st

"' "' Ul

E :9-c:

B "O e C.

i;I

Ql

E u

N t;

0, END

ROAD WORK

LENGTH AND SPACING TABLE

APPROACH BUFFER SPACE CHANNELIZING DEVICE

SPEED* LENGTH TAPER BUFFER WORK

AREA SPACE SPACE

MPH FEET

SPACING IN FEET

20 115 20 40 25 155 20 50 30 200 20 60 35 250 20 70 40 305 20 80 45 360 20 90 50 425 20 100 55 495 20 110 60 570 20 120 65 645 20 130 70 730 20 140

* Approach speed based on the regulatory posted speed, not the advisory speed.

G20-2 See Note 3

YIELD LINE

(optional) See Note 4

Traffic flow <

Traffic flow >

C B

ADVANCE WARNING AREA (See Sign Spacing Table)

A r( Type B warning

8 light (optional)~ r;;i

W13-1P (optional)

SIGN SPACING TABLE

ROAD TYPE

Urban and Rural 30 MPH and less Urban and Rural 35 MPH to 50 MPH Rural greater than 50 MPH

Expressway/ Freeway

Device spacing

Channelizing devices (See Length and Spacing Table)

15'

~ VR1-2

TO

ONCOMING

TRAFFIC

R1-2aP

TAPER AREA BUFFER SPACE

50' - 100' (optional)

(See Length and Spacing Table)

DISTANCE BETWEEN

SIGNS IN FEET

A B C 100 100 100 350 350 350 500 500 500

1000 1500 2640

10' min.

See Note 6

BUFFER SPACE

(optional)

VARIABLE

WORKSPACE

STATE PROJECT

NOTE:

1. Use this layout only if sufficient gaps in oncoming traffic exist for traffic that must yield, and if drivers from both directions are able to see approaching traffic through and beyond the work site.

2. Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.

3. If closure is completely within the project limits, eliminate the "ROAD WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.

4. If the surface is paved, install yield lines that comply with Section 3B.16 of the MUTCD.

5. Use the "YIELD AHEAD" (W3-2) sign when approach speeds exceed

50 MPH.

6. For project specific minimum width, refer to Special Contract Requirements, Section 156.

7. Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.

SHEET

NUMBER

~ Type B warning light (optional) Q

TAPER AREA

50' - 100' (optional)

TERMINATION AREA

NO SCALE

W13-1P r;;, (optional) ~

W20-1 See Note 3

A

A

END

ROAD WORK

B

G20-2 See Note 3

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FEDERAL LANDS HIGHWAY

U.S. CUSTOMARY STANDARD

TEMPORARY TRAFFIC CONTROL

SINGLE LANE CLOSURE LAYOUT

(WITH YIELD SIGN)

STANDARD APPRDVED FDR USE 6/2005 STANDARD

REVISED:

DRAFT 6/2014 635-7

:3

J u ly

T

A B

U L

A T

IO

N

O F

P T

C Q

U A

N T

IT

IE

p w w o r k

\d

\w a n o c a ia

.d g n

TABULATION OF PTC QUANTITIES

STATE PROJECT

NUMBER

SHEET

WA NPS NOCA 10(7) I.1

NPS Drwg. No. 168/175130 NPS PMIS No. 305506

Ul 2.

C:

Cl

"O st

"' "' 'Si E :9-c:

B

"O e C.

i;I

Ql

E u

Top edge of reflective sheeting

L..

-5;

(IJ

.gi

IJ.J

2' min.

8'max.

Manufactu,er'; bury depth --f

I

FLEXIBLE DELINEATOR

GROUND MOUNTED

Top edge of reflective sheeting

I I I

FLEXIBLE DELINEATOR

GUARDRAIL MOUNTED OPTION

(Use only with wood guardrail posts)

White retroreflective sheeting

FACING TRAFFIC BACK SIDE

(IJ

.gi

>< (IJ

IIJ (IJ

E: C:

::: !g

Lri ~ .8 ~ . S, L..

E: IB

t-i C:

'<:I- ~

Fasten delineator to guardrail post using two¾" x 2" lag screws

.Q with washers at centerline of post.

Other approved fastening methods submitted by the delineator manufacturer are also acceptable

Top edge of reflective sheeting

::i -5;

(IJ

.gi 1.1.J

I 2' min.

8'max.

FLEXIBLE DELINEATOR

SURFACE MOUNTED

Install delineators on outside of curve at spacing S ~

Final delineator may be removed if B > 5/2 s

PLACEMENT ON HORIZONTAL CURVES

Locate initial delineator so that it is visible for ~ ;c d•~;ng ~• b7ge ~{ax-~ I :

100' typ.

--, --, ~ Locate initial delineator so that it does not !inder --, the view of the bridge delineator for approaching traffic

REFLECTIVE SHEETING DETAIL PLACEMENT AT BRIDGE APPROACHES

STATE PROJECT

NOTE:

1. When a delineator falls within a cross road or approach, the delineator may be moved in either direction a distance not to exceed one quarter of the normal spacing. Eliminate the delineator if this allowance is exceeded.

2. Place delineators 2 feet from the edge of design shoulder unless otherwise specified .

3. Install delineators behind the rail at guardrail locations.

Either drive the delineator in line with the guardrail posts or mount a shorter delineator onto the guardrail post as shown on this sheet.

4. When the contract does not provide for the construction of the ultimate pavement, allow for the thickness of base and pavement to be placed later when establishing the elevation of the traffic delineators.

5. Use the current edition of the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) as a guide for delineation layout.

DELINEATOR SPACING

ON HORIZONTAL CURVES

CURVE RADIUS SPACING (S)

(FEET) (FEET)

50 20 115 25 180 35 250 40 300 50 400 55 500 65 600 70 700 75 800 80 900 85

1,000 90

Spacing for a specific curve may be interpolated from the table, or calculated using the formula:

Spacing = 3 v R-50.

The minimum spacing should be 20 feet.

Curve spacing should not exceed 300 feet.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

U.S. CUSTOMARY DETAIL

WASHINGTON

DELINEATORS

SHEET

NUMBER

NO SCALE

DETAIL APPROVED FOR USE 1/2008 DETAIL

REVISED: W633-80

635-1: H.2
State: WA
Project: NPS NOCA 10(7)
635-7: H.3
NPS: NPS PMIS No. 305506

NPS Drwg. No. 168/175130

W633-80: I.2
W251-1: G.3
W157-15: F.7
W629-2: F.10

File details come from the government source that posted it. Updated .