NOA SSC Boiler Replacemant.pdf

PDF 311 KB Posted

Attached to
GSW 40-01-24 SSC Boiler Replacement
Solicitation number
PE-54200-RFQ-2024-000000001
Issued by
Taylor County, Georgia

About this file

This document is a Notice of Availability (NOA) issued by the State Superintendent's Office (SSO) for the replacement of boilers at various state facilities. The scope of work includes the removal and replacement of existing boiler systems, along with associated mechanical, electrical, and plumbing work, at multiple locations throughout the state. The project is estimated to require approximately 250 boiler replacements, with responses due 45 days from the NOA issuance date. A mandatory pre-bid conference and site visits are scheduled prior to the response deadline. The contract is anticipated to be awarded within 60 days of the response due date, with a term of 3 years and two 1-year renewal options.

The NOA specifies that this is a competitive bid, with pricing to be submitted on a per-unit basis for each boiler replacement. Minority and women-owned business enterprise (M/WBE) set-asides are included, with a 25% M/WBE participation goal. The current incumbent contractor is ABC Mechanical, and the project is funded through the state's capital improvement budget, with an estimated total value of $12 million.

View the file

Other files

File Type Posted
Drawings GSW 40_01_24.pdf PDF
Invitation to Bid GSW 40_01_24.pdf PDF
Project Manual GSW SSC Boiler Replacement.pdf PDF
SSC Boiler Bid Tab.pdf PDF
NOIA_ SSC Boiler GSW_40_1_24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .