This document is a set of drawings and specifications for the Georgia Southwestern State University Student Success Center - Boiler Replacement project located in Americus, Georgia. The project involves the replacement of existing boilers and associated mechanical, plumbing, and electrical systems in the mechanical room. Key details include the replacement of two existing boilers with new high efficiency boilers, new heating water pumps, and new controls. The bid set is dated May 24, 2024, and the project number is GSW-40-01-24.

The drawings provide a detailed scope of work, including demolition and new work, as well as technical specifications for the equipment and systems. The project is being managed by NBP Engineers, Inc. based in Macon, Georgia. No other contractual or pricing details are provided in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

PROJECT CONSULTANTS

SHEET NO. TITLE

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

E001

M001

M201

M301

M401

ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC

DETAILS - HVAC

P201

Americus, Georgia

GEORGIA SOUTHWESTERN STATE UNIVERSITY

STUDENT SUCCESS CENTER - BOILER REPLACEMENT

BOILER SYSTEM FLOW DIAGRAM - HVAC

LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - PLUMBING

E201 LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - ELECTRICAL

LEGEND, PANELBOARDS, & RISER - ELECTRICAL

Project GSW-40-01-24

05.24.2024 BID SET

P:\24007\24007m001.dgn

DATE PLOTTED

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007m001.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

WSH

LTF

WSH

24007

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

B

ID

S E

T

05.24.2024

M001

SCHEDULES - HVAC

LEGEND, &

ABBREVIATIONS,

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

INSIDE

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

COMBINATION STARTER

STARTER

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

GATE VALVE WITH

3/4" HOSE END

BALANCE VALVE

THREADED & FLANGED

GLOBE VALVE

CHECK VALVE

3-WAY MIXING VALVE

GATE VALVE

BUTTERFLY VALVE

SOLENOID VALVE

CONTROL VALVE

PLAN VIEW

2-WAY MOTORIZED VALVE

RELIEF VALVE

FLANGED UNION

BRANCH OUT TOP

STRAINER

BRANCH OUT BOTTOM

ELBOW DOWN

ELBOW UP

TEE OUT TOP

BLIND FLANGE

PIPE CAP

AUTOMATIC AIR VENTAAV

FLEX. PIPE CONN.

BACKFLOW PREVENTER

THERMOMETER

TEE OUT BOTTOM

MANUAL AIR VENT

PIPE TEST PLUG

CHILLED WATER FLOW

HEATING WATER FLOW

COLD WATER DOMESTIC

NATURAL GAS

CONDENSER WATER FLOW

DRAIN

MANUAL AIR VENT

FLOW METER

CHILLED WATER RETURN

HEATING WATER RETURN

HOT WATER DOMESTIC

G

D

M.A.V.

DUCT SIZE FIRST DIMENSION

IS SIDE SHOWN

24\12

DOOR GRILLE

C.F.M.

REFERS TO DETAIL OR

PLAN ON SHEET M-1.THERMOSTAT

INTERVAL TIMER

T

I.T.

1\M-4

LINED DUCT OR PLENUM

DAMPER

FIRE DAMPER

ELBOW WITH

TURNING VANES

FLEX. DUCT CONN.

DAMPER

TURNING VANES

ELBOW WITHOUT

ADJUSTABLE AIR

EXTRACTOR

INSULATED FLEX. DUCT

INSULATED FLEX. DUCT

c

ECCENTRIC REDUCER

HWS

HWR

CHS

CHR

CONDENSER WATER RETURN

CS

CR

STATIC PRESSURE SENSOR

SMOKE DETECTOR

POINT OF CONNECTION

DUCT SPLIT

THREADED & FLANGED

THREADED & FLANGED

UNION

GAUGE TAPPING

GAUGE WITH TAPPING

THREADED & FLANGED

THREADED & FLANGED

PIPE SOCKET WELL

FLOW INDICATOR BALANCER

TYPE GPM

FT.H O

MAX. MIN.

EFF. %2

PUMP SCHEDULE

MANUFACTURERS

REMARKS

DYNAMIC MIN.

HEAD

SHUT OFFMARK

HP-1

HP-2

MARK REMARKS

CONDENSING HOT WATER BOILER SCHEDULE

MBH

INPUT

BOILER

MBH

OUTPUT OPERATING

PRESSURE

GPM VOLT/PHASE

BLR-2

BLR-1

ES

ES

B&G TACOPATTERSON

RPM

HP

72 F

21 F94 F DB / 76 F WB

75 F DB / 55% RH

HEATING WATER

HEATING WATER

SERVICE

HEATING WATER

7.5

7.5

2BD

2BD

3x2.5x9.5

3x2.5x9.5

3x2.5x9.5

3x2.5x9.5

96.2

96.2

120/1

120/1

EFF. %

MIN.

(PSI)

P:\24007\24007m201.dgn

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007m201.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

WSH

LTF

WSH

24007

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

T

05.24.2024

DATA

MECHANICAL

DATA

MECHANICAL

H W

S

H W

R

AC-1

H W

S

H W

R

UH-2

UH-2

SF-4

WH WH

R

OA

2•"

EXISTING AREAWAY

EXISTING AREAWAY

4"

30/24

B.E.@ 6'-0" A.F.F.

T

T

EA

EXHAUST AIR LOUVER

EXISTING 5'-0"x2'-4"

OUTSIDE AIR LOUVER

EXISTING 5'-0"x2'-4"

TO NEAREST DRAIN

CONDENSATE DRAIN

ROUTE FULLSIZE

T 9 K

V A

HMB

EHLS

ATS

HLB

LRB

F A

C P

SMOKE CONTROL PANEL

ATS

V

H D

P

T

8"{ DN

PLENUM; 16" DEEP

EXISTING SHEETMETAL

DECK w/SCREENED OPENING

DUCT UP; TERMINATE 1'-0" BELOW

EXISTING 48/12 COMBUSTION AIR

PLENUM; 16" DEEP

EXISTING SHEETMETAL

PUMP CONTROLLER

EXISTING FIRE

FULL-LOUVERED DOOR

EXISTING

EXISTING

ON ROOF ABOVE

EXISTING CU-I

UP THROUGH ROOF TO CU-1

EXISTING ‡"RS & …" RL

EXISTING

EXISTING

EXISTING

EXPANSION TANKS

EXISTING

UP TO ROOF

10"{ FLUE

EXISTING

ROUTED THRU CRAWL SPACE

EXISTING 14"{ FLUE

M201

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

H W

S

H W

R

AC-1

H W

S

H W

R

UH-2

W

S

H W

R

HWR

R

21a

20a

19a

Db D CEF

Da

21a

20a

19a

Db D CEF

Da

OA

1"CW

4"

6"

1"

4"

4"

4"

2•"

EXISTING AREAWAY

EXISTING AREAWAY

4"

MAV

4"

6"

30/24

B.E.@ 6'-0" A.F.F.

T

T

EA

EXHAUST AIR LOUVER

EXISTING 5'-0"x2'-4"

OUTSIDE AIR LOUVER

EXISTING 5'-0"x2'-4"

TO NEAREST DRAIN

CONDENSATE DRAIN

ROUTE FULLSIZE

LDP RIGHT

EXISTING PULLBOX

LDP LEFT

T 9 K

V A

HMB

EHLS

ATS

HLB

LRB

F A

C P

SMOKE CONTROL PANEL

ATS

P

T

8"{ DN

4"

PLENUM; 16" DEEP

EXISTING SHEETMETAL

DECK w/SCREENED OPENING

DUCT UP; TERMINATE 1'-0" BELOW

EXISTING 48/12 COMBUSTION AIR

PLENUM; 16" DEEP

EXISTING SHEETMETAL

PUMP CONTROLLER

EXISTING FIRE

FULL-LOUVERED DOOR

EXISTING

EXISTING

ON ROOF ABOVE

EXISTING CU-I

UP THROUGH ROOF TO CU-1

EXISTING ‡"RS & …" RL

BLR-1

EXISTING

REMOVE

HP-2EXISTING

REMOVE

BLR-2

EXISTING

REMOVE

EXISTING

REMOVE

EXISTING

REMOVE

HP-4

HP-3

HP-1EXISTING

REMOVE

EXISTING

EXISTING

EXISTING

EXPANSION TANKS

EXISTING

HP-1

HP-2

NEW

NEW

MUW

BLR-2

BLR-1

HWR

HWS

2•"

2•"

4"

4"

4"

4"

4"

ACP 4"

4"

4"

4"

SEPERATOR

TANGENTIAL AIR

NEW

NEW

UP TO ROOF

10"{ FLUE

EXISTING

EXISTING MUW

REMOVE

FLUE AT WALL

CAP EXISTING

ROUTED THRU CRAWL SPACE

EXISTING 14"{ FLUE

FLUE AT WALL

CAP EXISTING

F L

U E

U E

CHIMNEY WITH NEW FLUE CAP

TERMINATE AT TOP OF

EXISTING MASONRY CHIMNEY;

8"{ UP THRU

NEW

HP-1-VFD

NEW

HP-2-VFD

NEW

NEW CONCRETE PAD

NEW WORK - HVAC

DEMOLITION &

MECHANICAL ROOM -

LARGE SCALE -

LARGE SCALE - MECHANICAL ROOM - DEMOLITION - HVAC LARGE SCALE - MECHANICAL ROOM - NEW WORK - HVAC

P:\24007\24007m301.dgn

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007m301.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

WSH

LTF

WSH

24007

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

T

05.24.2024

M301

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

NOT TO SCALE

C

4"

DIFFUSER

SUCTION

4"

DIFFUSER

SUCTION

4"

HP-2

HP-1

1. FAILURE MODES:

O - OPEN OR ON

C - CLOSE OR OFF

L - LAST COMMAND

2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF

ELECTRIC POWER TO THE DDC PANEL.

TAG

LOW WATER LEVEL

POINT DESCRIPTION

BOILER

TT-1

TT-2

HWR - (SYSTEM)

HWS - (SYSTEM)

HEATING SYSTEM PUMP-VFD CONTROL

HEATING SYSTEM PUMP-VFD CONTROL

DP-1 DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP

O

O

FM-1 HEATING WATER FLOW METER

L

HWS - (SYSTEM)

HWS - (SYSTEM)

TT-3

TT-4

HWS - (SYSTEM)TT-5

VLV-1&2

VLV-3

BOILER ISOLATION VALVE

BYPASS VALVE

LOW WATER LEVEL

BOILER

BLR-1

BLR-2

HP-1

HP-2

NOTES:

S Y

S T

M

G

A P

IC

IS

P L

A Y

S T

A R

T

S T

O P

E N

A B

L E

D

IS

A B

L E

O P

E N

C L

O S

E

S T

A R

T

S T

O P

A

K E

U P

S E

T P

O

IN

T

J

U S

T

D

C

N T

R O

L

D

IF

F E

R E

N T

IA

L

P

R E S

S U

R E

P R

E S

S U

R E

S

W

IT

C H

A U

X

IL

IA

Y

N T

A C

T

A L

A

N T

A C

T

T E

M P

E R

A T

U R

E

H

IG

H

L

W

IM

IT

R U

N

T A

L

IZ

A T

IO

N

P R

O P

O R

T

IO

N A

L

P R

O P

IN

T E

G R

A L

T

IM

E

S

C H

E D

U L

E

S

S

O P

T

IM

U

A R

T

S T

O P

D A

Y

N

IG

T B

A C

K

D E

M A

IT

C Y

C L

E

R E S

P

T

IM

IZ

A T

IO

N

E C

O N

O M

IZ

E R

N O

T E S

C U

R R

E

L A

Y

S P

E E

D

IN

D

IC

A T

IO

N

S P

E

N T

R O

L

P O

S

IT

IO

N

IN

D

IC

A T

IO

N

O P

E R

A T

IN

G

A T

U S

D

IF

F

P

R E S

S U

R E

K W

P R

E S

S U

R E

W A

T

O W

S T

E

O W

S T

A T

U S

D R

IV

E

S

T A

T U

S

T R

E

G

F A

IL

U

D E (S

T E S

A

N D

DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT. LOGS

OUTPUTS INPUTS SOFTWARE

ACP

DDC PANEL

INPUT/OUTPUT

SUMMARIES

BOILER PLANT SYSTEM

BLADDER

PURGE

VALVE

EXPANSION TANK, SET 25 PSIG

INITIAL FILL PRESSURE. 12 GAL.

MIN. ACCEPTANCE VOLUME.

75 GAL. MIN. TANK VOLUME

CHEMICAL FEED TANK

ANNULAR ELEMENT

FLOW STATION

BYPASS VALVE

CV= 15.0

LOCATE AT AH-1

TO HEATING

EQUIPMENT COILS

TO HEATING

EQUIPMENT COILS

1" TO DOMESTIC

WATER

MAKE-UP WATER STATION

ROUTE TO DRAIN

A.A.V.

ISOLATION VALVE

AIR RELEASE TANK

PRESSURE

GAUGE

RELIEF VALVE

BOILER

CONTROL

BOILER

CONTROL

BLR-2BLR-1

RELIEF VALVE

ISOLATION VALVE

3"

3"

3"

3"

3"

3"

4"

4"

1"

4" 4"

4"

1"

4"

HWR

HWS

HWR

3"

3"

TT

AI

FM

AI

VLV

AIAO

AI

TT

HWS

DP

AI

VSD

VFD

AI DI AO DO

VSD

VFD

AI DI AO DO

AIAODO

VLV

DO AO AI

VLV

HWR

HWS

4"

4"

SET 45 PSIG (TYP)SET 45 PSIG (TYP)

BOILER SYSTEM FLOW DIAGRAM - HVAC

HVAC

FLOW DIAGRAM -

BOILER SYSTEM

P:\24007\24007m401.dgn

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007m401.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

WSH

LTF

WSH

24007

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

T

05.24.2024

M401

HVAC

DETAILS -

A

BC

E

TO SYSTEM

B -ƒ" TO DISCHARGE OF PUMP.

C -ƒ" TO SUCTION OF PUMP.

F - RISER CLAMP. WELD TO 2X3/4 " FLAT

OFFSET BRACKET TO WALL.

A - CHEMICAL FEEDER TANK.

D -ƒ" TO FLOOR DRAIN.

D

4"MIN.

WELD

F

BALL VALVES

E -‚" BALL VALVE FOR VENT.

BY-PASS CHEMICAL FEEDER

NOT TO SCALE

BACKFLOW PREVENTER

1"1"

MAKE - UP WATER STATION

GAUGE COCK

ƒ"

PRESSURE REDUCING

VALVE. SET AT

1"

AIR GAP DRAIN

FITTING

1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR

TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE

CLAMPS SAME MATERIAL AS PIPE.

PSI.

GAUGE

BALL VALVE

BALL VALVE

NOT TO SCALE

TO FILL POINT

OF SYSTEM

BALL VALVE

QUICK FILL

CONNECTION

TO DOMESTIC COLD

WATER SUPPLY

HANGER ROD - SEE SPECIFICATIONS

SECTION OF RIGID INSULATION

SPECIFIED INSULATION

PIPE

• ROUND BEARING PLATE

PLATE WASHER

CUT ROD ABOVE ANGLE LEG

1" MIN.

TRAPEZE HANGER

LONG LEG VERTICAL

SEE SPECIFICATIONS

DOUBLE HEX NUTS

TRAPEZE PIPE HANGER

NOT TO SCALE

SERVICE TEE

ECCENTRIC REDUCER

•" STREET ELL.

AUTOMATIC AIR VENT

MAINS

•"X2" NIPPLE

„"MPT X ‚" FLARE ELL.

‚" COPPER TO FLOOR

DRAIN OR OUTSIDE

AS SHOWN.

AUTOMATIC AIR VENT

NOT TO SCALE

TYPICAL DRAIN VALVE CONNECTION

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

ƒ" GATE VALVE

ADAPTER TO ƒ" HOSE THREAD

PROVIDE HOSE CAP NUT

NOTES:

DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.

2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

NOT TO SCALE

ƒ" CHAMFER

ALL SIDES UNLESS OTHERWISE NOTED

EQUIPMENT

4" MINIMUM ALL SIDES

6" X 6", 10\10 WELDED WIRE

FABRIC AT MID-DEPTH OF

PAD (UNLESS OTHERWISE NOTED)

SLAB, FLOOR, OR SUPPORTING STRUCTURE.

ROUGH UP WHERE CONCRETE DOES NOT HAVE

BROOM FINISH OR ROUGHER.

6" THICK CONCRETE

(INERTIA PAD IDENTICAL)

HOUSEKEEPING PAD DETAIL

NOT TO SCALE

WALL

AS SYSTEM PIPE.

MANUAL AIR VENT

TERMINATE DRAIN WITH HOSE END

CONNECTION 18" ABOVE FLOOR.

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

CEILING. LOCATE VALVE AND TERMINATE DRAIN

HERE, UNLESS NOTED OTHERWISE AND POSITION

VALVE FOR VERTICAL DOWN DISCHARGE.

•" PIPE SAME MATERIAL

2•"

VERTICAL

PIPE

SUPPORT

WELDED PIPETHREADED / BRAISED

PIPING

BALL VALVE (EXPOSED) OR

GATE VALVE (CONCEALED)

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

6"MAX.

NOT TO SCALE

4"

4" 4"

LIQUID TIGHT,NEOPRENE COATED

FLEXIBLE CONDUIT

WATER PUMP(S) ONLY

18 GA. S.S. DRIP PAN

(CHILLED WATER PUMP(S)

ONLY)

GAUGE COCK

RIGID CONDUIT STUB

TO 3" ABOVE BASE

•" SCH. 40 TO DRAIN (CHILLED

PLAN

END SUCTION PUMP

NOT TO SCALE

HOUSEKEEPING PAD

EXISTING

FLEXIBLE CONNECTION

FLEXIBLE COUPLING AND

COUPLING GUARD

PIPE INSULATION

PRESSURE GAUGE

TEST PLUG

‚" BALL VALVE, TYPICAL

ADJUSTABLE FOOT

FULL SIZE BLOWDOWN

‚" DRAIN

TO FLOOR DRAIN

2"

1"

SUCTION DIFFUSER

WITH STRAINER

•" DRAIN TAPPING

PIPE TO FLOOR DRAIN.

18 GA. S.S. DRIP

PAN (CHILLED

WATER PUMP(S) ONLY

NOT TO SCALE

ELEVATION

EXISITNG HOUSEKEEPING PAD

8 9

TYPICAL END SUCTION PUMP

P:\24007\24007p201.dgn

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007p201.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

24007

WHD

LTF

WHD

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

T

05.24.2024

DATA

MECHANICAL

DATA

MECHANICAL

UH-2

T 9 K

V A

HMB

EHLS

ATS

HLB

LRB

F A

C P

SMOKE CONTROL PANEL

ATS

P

PUMP CONTROLLER

EXISTING FIRE

ON ROOF ABOVE

EXISTING CU-I

PRESSURE 15 PSI

TANKS; SET FILL

EXISTING EXPANSION

LDP RIGHT

EXISTING PULLBOX

LDP LEFT

G

3"

1•"

IN VERTICAL

GAS REGULATOR

WATER HEATER

AC-1

B.E.@ 6'-0" A.F.F.

HP-1

HP-2

NEW

NEW

BLR-2

BLR-1

ACP

NEW

NEW

NEW

HP-1-VFD

NEW

HP-2-VFD

NEW

P201

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

BLR-1

BLR-2

UH-2

21a

20a

19a

Db D CEF

Da

21a

20a

19a

Db D CEF

Da

T 9 K

V A

HMB

EHLS

ATS

HLB

LRB

F A

C P

SMOKE CONTROL PANEL

ATS

P

PUMP CONTROLLER

EXISTING FIRE

ON ROOF ABOVE

EXISTING CU-I

PRESSURE 15 PSI

TANKS; SET FILL

EXISTING EXPANSION

LDP RIGHT

EXISTING PULLBOX

LDP LEFT

G

3"

BOILER GAS REGULATOR

4" 2•"

1•"

3"

G

IN VERTICAL

GAS REGULATOR

WATER HEATER

EXISTING

REMOVE

EXISTING

REMOVE

NOTES:(THIS SHEET ONLY)

CHECK VALVE

INCREASER

FLOOR DRAIN (FD)

CLEANOUT (CO) VENT THRU ROOF

SOIL, WASTE

VENT

G GAS (LOW PRESSURE)GAS COCK

GATE VALVE

GLOBE VALVE

UNION

HUB DRAIN

VALVE IN VALVE BOX

HIGH PRESSURE GAS

BELOW FLOOR

ABOVE CEILING

NOT TO SCALE

HPG

NTS

THRUST BLOCK

EXISTING TO REMAIN

EXISTING TO BE REMOVED

LEGEND

BALL VALVE

T

THERMOMETER

AQUASTAT LIMIT OF DEMOLITION

N.F.W.H. NON-FREEZE WALL HYDRANT

ABOVE FINISHED GRADE

TEST PLUG

STRAINER

PRESSURE REDUCING VALVE COLD WATER

HOT WATER (120 )

HOT WATER RETURN

BF

AC

AFG

VTR

CPHB

BALANCER (CIRCUIT SETTER)

FLOW INDICATOR

HOSE BIBB (HB)

SILL COCK (SC)

NEW TO EXISTING

POINT OF CONNECTION

HOSE BIBB

CHROME PLATED

COMPRESSED AIRCA

COMPRESSED AIR OUTLETCA

FIXTURES.

SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL PLUMBING

ALL WATER PIPING SHALL BE RUN ABOVE CEILING UNLESS OTHERWISE

NOTED.

ALL VENTS THRU ROOF (VTR) SHALL BE OFFSET A MINIMUM OF 15'-0"

FROM ALL OUTSIDE INTAKES.

-5 PROVIDE HANGER ON ALL HORIZONTAL WATER PIPING INSIDE CHASES

COORDINATE PLUMBING PIPING WITH AIR CONDITIONING DUCTS, EQUIPMENT

AND ELECTRICAL CONDUIT.

GENERAL NOTES:

WITHIN 6" OF SPECIFIED WATER HAMMER ARRESTOR.

NOTES:

GAS REGULATOR SCHEDULE

NUMBER

REGULATOR

SERVED

EQUIPMENT

LOCATION

EQUIPMENT

INPUT DEMAND

MBH GAS

PRESSURES

INLET/OUTLET

BOILER 2,000 MBH MECH. ROOM 5psi/10"W.C.

* PIPE RELIEF VENT FULL SIZE TO OUTSIDE. PIPE AWAY FROM INTAKE LOUVERS, ETC.

GR-1

NOTE TO CONTRACTOR:

PROVIDE ACCESS TO THE CONCEALED UTILITY.

WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO

PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF

TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES

NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING

FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT

WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,

REGULATOR AS SHOWN BACK TO ISOLATION VALVE.

REMOVE EXISTING GAS PIPING AND VALVES DOWN TO EACH BOILER. REMOVE EXISTING MAIN AND GAS

GR-1

GR-2

GR-2 BOILER MECH. ROOM 2,000 MBH 5psi/10"W.C.

3"

3" 1 •"

1 •"

CONNECT NEW 1 •" GAS PIPING TO EXISTING GAS PIPING.

CONNECT NEW 3" GAS TO BOILER. PROVIDE A MINIMUM 5 FEET OF PIPING BETWEEN REGULATOR AND BOILER.

HP-3

HP-4

AC-1

B.E.@ 6'-0" A.F.F.

LARGE SCALE - MECHANICAL ROOM - NEW WORK - PLUMBING

NEW WORK - PLUMBING

DEMOLITION &

MECHANICAL ROOM -

LARGE SCALE -

LARGE SCALE - MECHANICAL ROOM - DEMOLITION - PLUMBING

P:\24007\24007e001.dgn

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007e001.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

TWT

BCO

TWT

24007

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

T

05.24.2024

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

P O

L E

CKT

PANEL

NOTES

Minimum KAIC:

CKT

TRIP

4#10

4#10

4#10

4#10

4#10

4#10

WIRE

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

PANEL SECTION CONN AMPS

PANEL SECTION CONN V A

SPARE

JOCKEY PUMP

BLR-1 BLOWER

HP-4

HP-3

HP-2

HP-1

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

10090

10090

A

PHASE LOAD V.A.

10090

10090

B

FED BY

10090

10090

C

HDP

LIGHTING-REC, APPROX. 20 INCHES WIDE, MAX 100 AMP BRANCH

LOCATION:

AMPS

VOLT-

SPACE

SPACE

SPACE

SPACE

SPARE

SPARE

SPARE

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

HMB

LRB

1. PROVIDED WITH IG BAR.

NOTES

Minimum KAIC:

CKT

TRIP

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

WIRE

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0511

REC 0518

REC 0521

REC 0504

REC 0506

REC 0515

REC 0503

REC 0507

EWC

REC 0500

REC 0501

SERVES

WIRE

PH,

AMPS

VOLT-

EXISTING

A

PHASE LOAD V.A.

B

FED BY

C

LDP

LOCATION:

AMPS

VOLT-

SURGE

SPACE

SPACE

SPACE

SPACE

SPACE

SPARE

SPARE

SPARE

GENERATOR REC

WATER HEATER

WATER HEATER

ACP

SF-4

CU-1

AC-1

REC ELEV PIT

CAB LIGHTS

SERVES

1/2"

1/2"

1/2"

1/2"

1/2"

3/4"

1/2"

1/2"

1/2"

CD.

MLO

#10

#12

#12

#12

#12

4#10

#12

#12

#12

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL

NOTES

Minimum KAIC:

CKT

TRIP

AMPS

VOLT-

MODIFIED

A

PHASE LOAD V.A.

B

FED BY

C

HDP

LOCATION:

AMPS

VOLT-

SPACE

SPACE

SPACE

SPACE

SPARE

SPARE

SPARE

SERVES CD.

MLO

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL HMB

1. PROVIDED WITH IG BAR.

NOTES

Minimum KAIC:

CKT

TRIP

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

#12

WIRE

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0522 (IG)

REC 0511

REC 0518

REC 0521

REC 0504

REC 0506

REC 0515

REC 0503

REC 0507

EWC

REC 0500

REC 0501

SERVES

WIRE

PH,

AMPS

VOLT-

MODIFIED

A

PHASE LOAD V.A.

B

FED BY

C

LDP

LOCATION:

AMPS

VOLT-

SURGE

SPACE

SPACE

SPACE

SPACE

SPACE

ACP

BOILER #2

BOILER #1

GENERATOR REC

WATER HEATER

WATER HEATER

ACP

SF-4

CU-1

AC-1

REC ELEV PIT

CAB LIGHTS

SERVES

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

3/4"

1/2"

1/2"

1/2"

CD.

MLO

#12

#12

#12

#10

#12

#12

#12

#12

4#10

#12

#12

#12

WIRE

SURFACE

TRIP

MOUNTED

AMPS

CKT

PANEL LRB

4#10

4#10

4#10

WIRE

3/4"

3/4"

3/4"

CD.

MULTISECTION CONN AMPS

MULTISECTION CONN V A

JOCKEY PUMP

SPARE

(7.5 HP)

HP-4

(7.5 HP)

HP-3

SPARE

SPARE

SERVES

WIRE

PH,

E001

RECEPTACLES

CIRCUITS

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

QUADRAPLEX - NORMAL

ELECTRICAL LEGEND

WP

H HORIZONTALLY MOUNTED

WEATHER PROOF OUTLET

RACEWAY EXPOSED

FLEXIBLE RACEWAY

CONDUIT UP

CONDUIT DOWN

HOMERUN- ONE ARROW PER CIRCUIT

ONE CROSSMARK PER WIRE

(3 WIRE UNLESS SHOWN)

RACEWAY CONCEALED IN CEILING OR WALL

RACEWAY IN GROUND, SLAB, OR UNDER FLOOR

CAP

CONNECTION TO EQUIPMENT

GENERAL EQUIPMENT

TRANSFORMER

F

PANELBOARD-250 VAC OR LESS

SURFACE MOUNTED

PANELBOARD-250 VAC OR LESS

RECESSED

PANELBOARD-OVER 250 VAC

RECESSED

PANELBOARD-OVER 250 VAC

SURFACE MOUNTED

T

M MANUAL STARTER AND MOTOR RATED SWITCH

EMERGENCY PUSHBUTTON

EXHAUST FAN

MOTOR

JJ J

COMMUNICATIONS

ENCLOSED CIRCUIT BREAKER

JUNCTION BOX - WALL/CEILING/FLOOR

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

COMBINATION STARTER AND DISCONNECT

WITH A RJ45 CONNECTOR. STAINLESS STEEL COVER PLATE

POWER RISER

NOT TO SCALE

DATA OUTLET WITH A SINGLE CAT 6 CABLE TERMINATED

G

HMB

100A

HLB

100A

EHLS

200A

ATS

VIA

HDP

ATS

200A

LRB

100A

SECTION 1"

"LDP-

RENAME

EXISTING-

SECTION 2"

"LDP-

RENAME

EXISTING-

PULLBOX

EXISTING

ENTRANCE PANEL

FOR EXISTING SERVICE

ALL SURGE SUPPRESSOR

BE SEALED AT BOTH ENDS TO PREVENT WATER INFILTRATION.

FEEDERS. EXTEND NEW DUCTBANK TO EXISTING. FEEDER CONDUITS SHALL

REUSED. VERIFY EXISTING CONDUITS CAN ACCEPT THE NEW #600 KCMIL

NUMBER OF EXISTING CONDUIT/CONDUCTORS. NO CONDUCTORS SHALL BE

BUILDING EXTERIOR MAY BE REUSED. CONTRACTOR SHALL VERIFY SIZE AND

BETWEEN TWO SECTIONS OF LDP. CONDUITS FROM STUB-UP LOCATION TO

ARE STUBBED UP THRU BASEMENT FLOOR INTO LARGE PULLBOX LOCATED

PROVIDE 3 SETS 4#600KCMIL, 4"C. EXISTING FEEDER CONDUITS TO LDP

INFILTRATION.

FEEDER CONDUITS SHALL BE SEALED AT BOTH ENDS TO PREVENT WATER

GRADE AS POSSIBLE. ALL PENETRATIONS SHALL BE SEALED AND FIREPROOFED.

INTO EXISTING BASEMENT MECHANICAL ROOM SHALL BE KEPT AS CLOSE TO

PROVIDE 4 SETS 4#600 KCMIL, 4"C. ANY NEW EXTERIOR WALL PENETRATIONS

2 MOUNTED INSIDE GENERATOR ENCLOSURE

200A ENCLOSED CASE CIRCUIT BREAKER

1#6G, 3"C

4#1/0 AWG,

XFMR

NEW 480V

CONTROL

PUMP

FIRE

BASEMENT

1600A

HDPHDPLDP

100 KW

NOTES:(THIS SHEET ONLY)

HDP

480V

CONDUIT)

(NEW CONDUCTORS/

PADMOUNT XFMR

TO EXISTING 480V

XFMR (SEE SITE PLAN)

208V PADMOUNT

TO EXISTING

ELECTRICAL

& RISER -

PANELBOARDS,

LEGEND,

P:\24007\24007e201.dgn

DGN FILE

24-MAY-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\24007\24007e201.dgn

AS SHOWN

A m e ri c u s

G e o rg ia

TWT

BCO

TWT

24007

G E

O R

G

IA

S

O U

T H

W E S

T E

R N S

T A

T E U

N

IV

E R

S

IT

Y

S T

U D

E N

T S

U C

C E S S C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

COA Expiration: 6.30.2024

NBP Engineers, Inc.

COA#PEF000774

P ro je c t

G S

W -4

-0

-2

T

05.24.2024

DATA

MECHANICAL

DATA

MECHANICAL

UH-2

T 9 K

V A

HMB

EHLS

ATS

HLB

LRB

F A

C P

SMOKE CONTROL PANEL

ATS

P

PUMP CONTROLLER

EXISTING FIRE

ON ROOF ABOVE

EXISTING CU-I

F

LRB-6

30A/2P/3R

PRESSURE 15 PSI

TANKS; SET FILL

EXISTING EXPANSION

J

J

LRB-16

LRB-18

LRB-12,37

LRB-8

TRANSFORMER

TO 480V PADMOUNT

LDP RIGHT

EXISTING PULLBOX

LDP LEFT

EHLS-3

AC-1

B.E.@ 6'-0" A.F.F.

EXISTING

HP-1

HP-2

NEW

NEW

BLR-2

BLR-1

ACP

NEW

NEW

NEW

HP-1-VFD

NEW

HP-2-VFD

NEW

E201

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

UH-2

21a

20a

19a

Db D CEF

Da

21a

20a

19a

Db D CEF

Da

T 9 K

V A

HMB

EHLS

ATS

HLB

LRB

F A

C P

SMOKE CONTROL PANEL

ATS

P

PUMP CONTROLLER

EXISTING FIRE

ON ROOF ABOVE

EXISTING CU-I

F

30A/3P F

LRB-6

30A/2P/3R

PRESSURE 15 PSI

TANKS; SET FILL

EXISTING EXPANSION

J

J

LRB-16

LRB-18

LRB-12,37

HMB-1

HMB-7

LRB-8

HMB-13

HMB-19

HMB-25

TRANSFORMER

TO 480V PADMOUNT

LDP RIGHT

EXISTING PULLBOX

LDP LEFT

EHLS-3

EXISTING

REMOVE

HP-1

BLR-1

EXISTING

REMOVE

BLR-2

EXISTING

REMOVE

EXISTING

REMOVE

HP-2

HP-3

EXISTING

REMOVE

HP-4

EXISTING

REMOVE

AC-1

B.E.@ 6'-0" A.F.F.

EXISTING

HMB-13

HMB-19

M

M

GENERAL NOTES:(THIS SHEET ONLY)

2 LABEL ABANDONED BREAKER AS "SPARE" AND UPDATE PANEL SCHEDULE.

LARGE SCALE - MECHANICAL ROOM - DEMOLITION - ELECTRICAL LARGE SCALE - MECHANICAL ROOM - NEW WORK - ELECTRICAL

NEW WORK - ELEC

DEMOLITION &

MECHANICAL ROOM -

LARGE SCALE -

LRB-24

LRB-22

LRB-26

PROVIDE A NEW 20A/1P BREAKER TO MATCH THE EXISTING PANEL KAIC RATING.

USE A SPARE 20A/1P BREAKER FOR NEW LOADS. IF NO SPARE EXISTS,

F 30A/3P

F 30A/3P

REUSE EXISTING BREAKER FOR NEW WORK. UPDATE PANEL SCHEDULE.

24007aCov
24007m001
References
tb, 24007tb.dgn
24007m201
References
tb, 24007tb.dgn
axfp1, 24007aXb.dgn
axfp2, 24007aXb.dgn
existing, 24007m201.dgn
24007m301
References
tb, 24007tb.dgn
24007m401
References
tb, 24007tb.dgn
24007p201
References
tb, 24007tb.dgn
axfp1, 24007aXb.dgn
axfp2, 24007aXb.dgn
existing, 24007p201.dgn
24007m201.dgn
24007e001
References
tb, 24007tb.dgn
PANELS, panel1-Excel.dgn
24007e201
References
tb, 24007tb.dgn
axfp1, 24007aXb.dgn
axfp2, 24007aXb.dgn
existing, 24007e201.dgn
new hvac, 24007m201.dgn

File details come from the government source that posted it. Updated .