FEDIS_Synopsis_Questions_-_04_12_16.pdf

PDF 105 KB Posted

Attached to
Facilities Engineering Design and Inspection Services (FEDIS) at MSFC
Solicitation number
NNM16577827L
Issued by

About this file

Revision to FEDIS Synopsis Questions 04 12 16

View the file

Other files

File Type Posted
FEDIS_Synopsis_Questions_-_FINAL.pdf PDF
SF330-13a.pdf PDF
Synopsis_Attachment_Form_SC_PP_Interview_and_Questionnaire_03_22_16.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NNM16577827L

Facilities Engineering Design and Inspection Services (FEDIS)

Pre-solicitation Synopsis Questions

Deadline 04/05/16 3:00 pm CST

Rev. 1

1. Reference: Synopsis Description

Question: Is this a follow-on requirement for work currently being performed under

Contract # NNM11AA41C with LEIDOS and Contract # NNM11AA39C with KAYA

Associates, Inc.

Answer: This is a follow-on requirement, which in this Synopsis, historically combines the work being performed on two separate contracts; The On-Site Architect and Engineering AE

Services Contract (Design Services and Master Planning) and the Construction Phase, Value

Engineering and Total Building Commissioning Services Contract (Surveillance and

Inspection Services).

2. Reference: A/E firms will be evaluated based on (2) Proposing firm’s geographic office location to the MSFC must be located within 200 miles from Huntsville, Alabama (5 points).

Question: A firm is not located within 200 miles of the site, though if awarded the job, the firm would consider temporary relocation. Considering the firms current location is not of that which is specified, is this something in which the firm would be disqualified?

Answer: The firm would not be disqualified, but evaluated based upon the firm’s geographic office location to MSFC (5 points). This solicitation is limited to 8a firms located in the Small Business Administration (SBA), Southern Region IV.

3. Reference: The following criteria will be used in the preliminary screening of the A/E firms responding to this announcement: (1) Must submit a fully completed, current Standard Form

330.

Question: Confirm the number of hardcopies of the SF 330 that are required to be submitted?

Answer: 3 copies of the SF 330 should be submitted. 1 needs to have an original signature.