SOW_Attachment_3_LMS_TD-0940_UPDATED.pdf

PDF 11 KB Posted

Attached to
Design and Installation of Nadir Research Portals in a NASA Gulfstream C-20B Aircraft
Solicitation number
NNL17637308Q
Issued by

About this file

Statement of Work Attachment 3 Updated

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LMS-TD-0940

Revision H: RSD

Verify correct revision before use by checking the LMS Web site.

5.4 Flight Readiness Review(s) and Maintenance Test Flight(s)

A Flight Readiness Review (FRR) shall be convened after a major inspection or modification and prior to the aircraft being released for flight. The FRR is used to inform all interested individuals of maintenance actions or modifications performed on the aircraft and to ensure that all have been completed and the aircraft is ready for flight.

A functional check flight is required for all aircraft where maintenance or modification(s) have been performed on a system that cannot be completely certified through ground based testing or is required by the particular maintenance manual, Time Compliance Technical Order, or Maintenance Work Order. Use of a test flight as a method to aid in the diagnosis of a discrepancy of a newly installed system is acceptable.

File details come from the government source that posted it. Updated .