1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 See Block 16C 4200604588 96968.4

6. ISSUED BY CODE OP-ES 7. ADMINISTERED BY (If other than Item 6) CODE

Same as block 6

John F. Kennedy Space Center, NASA Procurement Office, OP-ES-A Kennedy Space Center, FL 32899

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION.

X NNK17604588R

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] [ ] is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NNK17604588R : Revitalize Kennedy Space Center's Water & Wastewater Systems Phase 5

The purpose of this Amendment is to:

1. Make changes to the RFP

2. Provide PPI responses

See Attached Pages

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Sherry Gasaway, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY 11/17/2016

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. The following document is attached to this solicitation PPI Log dated 11/17/2016

2. The following changes are hereby made to the solicitation

SF1442 page 3

Delete Table in section 17 and replace with the following table (a revised page 3 is provided as an attachment):

21. Delete Table in section 21. ITEMS ACCEPTED, and replace with the following table (a revised page 3 is provided as an attachment):

CLIN DESCRIPTION UNIT UNIT PRICE

0001 TASK 1 (Base Bid) Replace Water Mains and Associated Appurtenances, Various Locations (Volume 1 Drawings)

1 JOB $____________________

0002 OPTION 0001 Replace W1 Pump Station (Volume 2 Drawings)

1 JOB $____________________

0003 OPTION 0002 Upgrade KARS Park 1 Water and Wastewater Systems (Volume 3 Drawings)

1 JOB $____________________

0004 OPTION 0003 Install Water Meters, Various Locations 1 JOB $____________________

TOTAL: $____________________

CLIN DESCRIPTION UNIT UNIT PRICE

0001 TASK 1 (Base Bid) Replace Water Mains and Associated Appurtenances, Various Locations (Volume 1 Drawings)

1 JOB $___________________

0002 OPTION #1 Replace W1 Pump Station (Volume 2 Drawings)

1 JOB $____________________

0003 OPTION #2 Upgrade KARS Park 1 Water and Wastewater Systems (Volume 3 Drawings)

1 JOB $____________________

0004 OPTION #3 Install Water Meters, Various Locations 1 JOB $____________________

TOTAL AWARD: $____________________

RFP Section B.1 CONSTRUCTION SERVICES AND PRICES

Delete Table of Line Items and replace with the following:

Line Item

Description Unit Total

TASK 1 (Base Bid): Replace Water Mains and Associated Appurtenances, Various Locations (Volume 1 Drawings)

1 JOB $ TBD

OPTION#1: Replace W1 Pump Station (Volume 2 Drawings)

1 JOB $ TBD

OPTION#2: Upgrade KARS Park 1 Water and Wastewater Systems (Volume 3 Drawings)

1 JOB $ TBD

0004 OPTION#3: Install Water Meters, Various Locations 1 JOB $ TBD

TOTAL: $ TBD

RFP Section C.1 SCOPE OF WORK (AUG 2016)

Delete Table of Line Items and replace with the following:

Line Item Description

0001 TASK 1 (Base Bid): Replace Water Mains and Associated Appurtenances, Various Locations (Volume 1 Drawings)

0002 OPTION#1: Replace W1 Pump Station (Volume 2 Drawings)

0003 OPTION#2: Upgrade KARS Park 1 Water and Wastewater Systems (Volume 3 Drawings)

0004 OPTION#3: Install Water Meters, Various Locations

RFP Section M.1(c) After paragraph (1) add paragraph (2) as follows:

(2) FAR PROVISION 52.217-4, EVALUATION OF OPTIONS EXERCISED AT TIME OF

CONTRACT AWARD (JUN 1988), applies to this solicitation. The Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.