NNK16586991R_-_0004.pdf
PDF 19 KB Posted
- Solicitation number
- NNK16586991R
About this file
Amendment 0004
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0004 See Block 16C 4200586991 99094
6. ISSUED BY CODE OP-ES 7. ADMINISTERED BY (If other than Item 6) CODE
Same as block 6
John F. Kennedy Space Center, NASA Procurement Office, OP-ES-A Kennedy Space Center, FL 32899
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION.
X NNK16586991R
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] [ ] is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NNK16586991R : Structural Steel and Connection Repairs, Haulover Canal Bridge, Facility E4-2414
The purpose of this Amendment is to:
1. Make changes to the RFP
2. Provide PPI Log dated 8.15.2016
ACKNOWLEDGEMENT OF THIS AMENDMENT IS REQUIRED WITH YOUR PROPOSAL
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Sherry Gasaway, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY 8/15/2016
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. The following document is attached to this solicitation
a. PPI Log - NNK16586991R-8.15.2016
2. The following changes are made to the RFP
RFP Section J-B, Item J-B-41
Delete Pragraph 1 after the word NOTE and replace with the following:
Refer to J-B-57 “Occupancy During Construction.” Contractor shall coordinate via e-mail construction activities to include bridge openings, closings, and potential extended openings and closings with vehicular and boating traffic via the Contracting Officer. Contractor shall attend a bi-weekly tagup for coordination while construction activities are underway. Contractor shall be prepared to stop and safe work, within 2 hours, temporarily as required to maintain safety work clears associated with operations related to the bridge, roadway, and waterway. Contractor shall protect existing facilities at all times including protection from weather. Any damage to existing facilities will be restored at no additional cost to the Government. In the event of damage, Contractor shall submit repair procedures for Government approval prior to performing any repairs or restorations. Contractor shall identify proposed temporary laydown areas and shall submit plan together with days needed for Government approval.
Maintenance of Traffic on Waterways: Contractor shall submit a Maintenance of Traffic plan for Government approval at least 2 weeks before the start of any construction activities and at least 2 weeks prior to any changes to the plan. Plan shall be in accordance with 33 CFR Part 117 Drawbridge Operation Regulations. Plan shall include temporary changes to drawbridge operating schedule with details such as length of time for single leaf operation, restricted access through the waterway due to construction activities (barge/work vessel in the canal, crane operations overhead, etc) and details of temporary equipment to be used in the waterway. Plan shall include request for a temporary change to the drawbridge operating schedule per 117.36. Note that work on the drawbridge typically will not be permitted on weekends or Federal Holidays. Contractor may request extended work hours for work beyond daylight provided night operations include temporary lighting that meets OSHA Safety requirements.
Contractor shall provide phone contact information to the government for real time waterway traffic coordination.
Maintenance of Traffic on Roads: Contractor shall submit a Maintenance of Traffic plan for Government approval at least 2 weeks before the start of any construction activities and at least 2 weeks prior to any changes to the plan.
Plan shall conform to FDOT and MUTCD (Manual of Uniform Traffic Control Devices) and all general standards of Index 600. Plan shall include temporary sign details and proposed locations.
(End of Project Specific Requirement)