HPSC_DRFP_Past_Perferformance_Questionnaire.pdf
PDF 115 KB Posted
- Attached to
- High Performance Spacecraft Computing (HPSC) Processor Federal contract opportunity
- Solicitation number
- NNG16574410R
About this file
Past Performance Questionnaire
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HPSC_DRFP_Cost_Exhibits.pdf | ||
| HPSC_DRFP_Requirements.pdf | ||
| HPSC_DRFP_Statement_of_Work.pdf | ||
| HPSC_DRFP_Cover_Letter_.pdf | ||
| HPSC_DRFP_Sections_L_and_M.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This form contains Source Selection Information when completed. See FAR 3.104.
EXHIBIT 12 - PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS
4/19/2016
Sections I through III provide for contract-related descriptive information and identification of the evaluator.
Section IV lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. Your assessment of the relevancy should reflect the fact that the principal purpose of our contract is to develop a radiation hardened multi-core spaceflight processor “Chiplet” that meets future National Aeronautics and Space Administration (NASA) and United States Air Force (USAF) onboard computing needs. The Chiplet concept leverages commercial off the shelf (COTS) intellectual property (IP) cores and meets NASA/USAF performance, power, and radiation tolerance needs via implementation with existing RHBD technology. The Chiplet includes multiple high bandwidth serial interfaces, and multiple interfaces to high speed off-chip memory. The high bandwidth serial interfaces can be used as on-chip network bridges allowing multiple Chiplets to be tiled or cascaded to increase bandwidth or to improve fault tolerance. This project will deliver:
(a) Software-based Chiplet emulator
(b) Prototype Chiplet die and packaged devices
(c) Chiplet Evaluation Boards
(d) System Software (boot software including operating system, and development tools).
“Significant Experience” means that a full range of services was routinely performed by the contractor under the associated SOW element. “Moderate Experience” describes a contractor who has experience in several aspects of a work element even though the experience may not have been on a continuous basis or directly related to the purpose of our contract. “Minimal Experience/Did not Perform” means that, although at least some aspects of the work may have been performed, such performance was limited in scope or frequency, or the work element was not performed under the contract.
Section V evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). It is very important to keep in mind that only performance in the past 5 years is relevant. If you cannot answer any questions, please circle “N/R” for Not Rated.
The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections IV and V:
Very High
(VH)
The Offeror’s relevant past performance is of exceptional merit ;
indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.
High
(H)
The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.
Moderate
(M)
The Offeror’s relevant past performance t demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.
Low
(L)
The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.
Very Low
(VL)
The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.
N/R Not Rated
Section VI provides for evaluation of the contractor’s management of cost and award/incentive fee history.
RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center BY TBD. Attn: Denise Sydnor , Code 210.S Greenbelt, MD 20771 Phone: 301-286-8086 FAX: 301-286-1773 e-mail: denise.y.sydnor@nasa.gov
PAST PERFORMANCE QUESTIONNAIRE
I. Contract Information
A. Name of Company/Division Being Evaluated:_____________________
B. Address:_____________________________________________
C. Contractor Cage Code and/or DUNS number
D. Contract Number:_______________________________________
E. Contract Type:_________________________________________
F. Period of Performance (including options): From:______ To:_______
G. Total Contract Value:_____________________________________
H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________
II. Description of Contract
Briefly describe the services provided under this contract:
During the contract performance being evaluated, this firm was the:
Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________
Does a corporate or business relationship exist between the firm being evaluated and your organization?
Yes ___ No ___. If yes, please describe: ___________________________
III. Evaluator Information
Name: ____________________________________________________ Title: ____________________________________________________ Agency/Company: ____________________________________________ Address: __________________________________________________ Phone: ______________ Date Questionnaire Completed: _______________ Role in Program/Contract: _____________________________________ Length of Involvement in this Program/ Contract: _____________________
IV. SOW Survey: Relevant Experience and Performance Ratings: Please check the appropriate blocks for both Relevance (Significant, Moderate, Minimal/Did Not Perform) and the Performance (VH, H, M, L, VL, N/R) for each SOW Element Listed below (see page 1 definitions and instructions).
SOW ELEMENT
SIGNIFICANT
MODERATE
MINIMAL/
DID NOT
PERFORM
PERFORMANCE RATING
(Please circle)
Develop architecture design of highly reliable fault tolerant processor Chiplet, leveraging commercially available intellectual property (IP) cores
VH H M L VL N/R
Develop emulator of multicore processor Chiplet VH H M L VL N/R
Develop preliminary design (register transfer level) of highly reliable fault tolerant processor Chiplet, leveraging commercially available intellectual property (IP) cores
VH H M L VL N/R
Perform detailed physical design of processor Chiplet using radiation hardened by design (RHBD) techniques
VH H M L VL N/R
Fabricate processor Chiplet VH H M L VL N/R
Package processor Chiplet using spaceflight using packaging techniques that are amenable to spaceflight qualification
VH H M L VL N/R
Develop Evaluation Board to test and characterize processor Chiplet functions and interfaces
VH H M L VL N/R
Develop processor System Software, including boot software, operating systems, board support packages, and software development tools
VH H M L VL N/R
Test and characterize the fabricated processor Chiplets to verify compliance with requirements
VH H M L VL N/R
Develop specification document and user’s guide for Chiplet, Evaluation Board, Emulator, and System Software
VH H M L VL N/R
Manage project resources using Earned Value Management (EVM)
VH H M L VL N/R
V. General Performance Survey
NO PERFORMANCE QUESTIONS
PERFORMANCE RATING
(Please Circle)
1.
Overall performance in planning and controlling the program
VH H M L VL N/R
2.
Compliance with technical requirements and performance standards
VH H M L VL N/R
3.
Content, accuracy, quality, and timeliness of technical reports and deliverables
VH H M L VL N/R
4.
Ability to design and/or deliver a product that meets or exceeds performance requirements within costs and schedule
VH H M L VL N/R
5. Timely identification and mitigation of risks VH H M L VL N/R
6.
Contractor’s ability to identify and correct performance deficiencies in a timely manner
VH H M L VL N/R
7.
Compliance with technical process and control requirements (quality assurance, configuration management, etc.)
VH H M L VL N/R
8.
Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.
VH H M L VL N/R
9. Communicating and interfacing with Government VH H M L VL N/R
10.
Ability to effectively manage subcontractor performance
VH H M L VL N/R
11.
Ability to build effective working relationships with associate contractors, subcontractors and the Government in a team environment.
VH H M L VL N/R
12.
Timeliness, quality, and accuracy of schedule reporting
VH H M L VL N/R
13.
Timeliness, quality, and accuracy of financial reporting
VH H M L VL N/R
14.
Ability to establish realistic cost estimates and adhere to them
VH H M L VL N/R
15.
Ability to establish realistic schedule estimates and adhere to them
VH H M L VL N/R
16.
Ability to meet Small Business Subcontracting Plan Goals
VH H M L VL N/R
Section VI:
What is the Contract Value:
Initial Value Current Value Estimated Cost: $___________ $____________
Fee: $___________ $____________
Total Value: $___________ $_____________
Briefly describe any change(s) from original contract value:
What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?
What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?
Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:
If this was an award fee contract, what are the individual and/oraverage ratings of performance by your organization? Please attach any available award fee letters or database entries
Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost).
Overall Contract Performance Rating (circle one)
Very High High Moderate Low Very Low
Would you select this Contractor Again? ( ) Yes ( ) No
Please add any other comments you may feel are pertinent.
Rater’s Signature Date
File details come from the government source that posted it. Updated .