This is a Request for Qualifications (RFQ) issued by the Town of Huntersville, North Carolina for construction materials testing (CMT) and special inspection (SI) services for the North Mecklenburg Park Greenway Project. The project involves constructing a 0.86-mile greenway with asphalt and concrete trail segments, two pedestrian boardwalks supported on timber piles, a retaining wall, and amenities including a shade structure pavilion, fitness stations, and arbor swings. The selected Construction Engineering and Inspection (CEI) firm will provide technicians and inspectors to perform testing and inspection services during the 300-day construction period. SOQ submissions are due by March 21, 2025 at 12:00 noon, with contractor selection notification expected by March 28, 2025.
The evaluation criteria weighs firm experience (40%), staff experience (35%), and staff availability (25%). North Carolina firms will receive priority consideration. Required insurance coverage includes workers' compensation, commercial general liability ($1M per occurrence/$2M aggregate), automobile liability ($1M), professional liability ($2M), pollution liability ($1M), and umbrella coverage ($1M). The contract will be executed after Town Board approval and requires the selected firm to submit pricing based on unit rates for specific services, with additional services billed at hourly rates. All submissions are limited to 15 pages inclusive of cover sheet and must follow specific formatting requirements detailed in the RFQ.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract for Professional Engineering Services Page 1 of 24
REQUEST FOR QUALIFICATIONS FOR TESTING SERVICES FOR THE NORTH MECKLENBURG
PARK GREENWAY PROJECT
TOWN OF HUNTERSVILLE, NORTH CAROLINA
1.0 PURPOSE & PROJECT DESCRIPTION
The North Meck Park Greenway will consist of a trailhead and asphalt and concrete trail segments with concrete approach pads where stream crossings occur. The total length of the segments is approximately 0.86 miles and consists of one mainline -L- segment and three -Y- connections. The proposed construction also includes two pedestrian boardwalks supported on timber piles, a retaining wall at the trailhead, and additional greenway amenities (shade structure pavilion, fitness stations, arbor swings and other furnishings).
The Town of Huntersville (“Town”) seeks a construction, engineering, and inspection (“CEI”) firm to provide engineering technicians and inspectors to perform the requested construction materials testing (“CMT”) and special inspections (“SI”) services. Based on review of the project documents, special inspections will be required for retaining walls, boardwalks, and soils. The technicians and inspectors shall work under the supervision of a project manager and professional engineer from a CEI firm that is familiar with the project requirements. The expected construction duration for substantial completion is 300 consecutive calendar days from issuance of a Notice to Proceed. The following scope of services is anticipated for this project:
2.0 SCOPE OF SERVICES
2.1. Soils and Shallow Foundations:
• Obtain samples of structure fill / backfill material for laboratory testing consisting of soil classification and Proctor.
• Prior to placement of compacted fill, observe subgrades for stability in accordance with project requirements.
• Field density testing (compaction testing) of structural fill and backfill in pavement and structural areas, for utilities and other areas as required by project specifications.
• Verify the use of proper materials, densities, and lift thicknesses during placement and compaction of fill and backfill.
• Verify that materials below shallow footings are adequate to achieve the design bearing capacity.
The footing bearing grades will be evaluated visually, by probing with a “T”-handle probe rod and by performing shallow hand auger boring with Dynamic Cone Penetrometer (“DCP”) testing at selected locations.
• Verify that shallow foundation excavations are extended to the proper embedment depth.
Contract for Professional Engineering Services Page 2 of 24
2.2 Timber Pile Foundations:
• Observe the installation of each pile based on the installation criteria supplied by other.
• Prepare a record for each pile that includes location, tip elevation (depth), pile length, and/or deviation from plumb after installation.
2.3 Asphalt Pavements:
• Proof roll observation of soil subgrade and pavement base course for stability.
• Field density testing of soil subgrade and base course layer.
• Observation of asphalt placement, temperature measurements, and field compaction testing using nuclear density gauge. If requested, perform pavement coring for thickness and density measurements.
2.4 Exterior Concrete Pavement & Walkways
• Proof roll observation of soil subgrade and pavement base course for stability.
• Field density testing of soil subgrade and base course layer.
• Observe the reinforcing steel installation for compliance with the project drawings and details, including size, type, grade, overlap, and cleanliness.
• Sampling and testing of plastic concrete, including field measurement of slump, temperature, unit weight, and air content, and casting specimens for compressive strength testing (8 cylinders per
100 cubic yards).
2.5 Reporting
The results of SI and CMT observations and testing will be presented in a daily report that will be reviewed by an engineer from the CEI firm and provided electronically to the designated project team members. When discrepancies are discovered and not immediately corrected, or require the input of the design team, a Discrepancy Notice will be issued and listed on a Discrepancy Log to track the item through resolution. The Discrepancy Log will be issued electronically to the project team. Laboratory testing reports will be issued electronically following the completion of the laboratory test. The CEI firm will issue Reports of Special Inspections as requested following the completion of Special Inspection disciplines. To facilitate testing and inspection services, the CEI firm will be provided with Requests for
Information (RFIs), Project Supplementary Information (PSIs), Change Order Directives, etc., issued during the course of construction that would impact the proposed services.
Contract for Professional Engineering Services Page 3 of 24
3.0 SELECTION PROCESS / SCHEDULE
3.1 The selection of a Firm to provide the desired services will be handled in accordance with the following process:
a. Submission and review of the submitted statements of qualifications (“SOQs”) by the Town.
b. The Town will rank the top three firms.
c. If there are not at least three qualified firms, then the Town will rank the number of qualified firms.
a. The Town MAY, at its discretion, conduct interviews of the firms selected.
d. The firms will be contacted in order of ranking.
a. If the Town and the first ranked firm cannot agree on a fee, then the next ranked firm will be contacted, and so on.
e. In order to be considered for selection, firms must submit a complete response to this request.
3.2 Advertisement
An advertisement for the RFQ will be posted on the following website: http://www.huntersville.org and the LME website at: https://www.ips.state.nc.us/IPS/Default.aspx
In addition, a copy of the RFQ and any addendum may be obtained by sending an e-mail to Tracy Houk, Assistant Parks and Recreation Director, Town of Huntersville Parks and Recreation Department, PO
Box 2879, Huntersville, NC 28070 (thouk@huntersville.org ).
All questions regarding this project should be directed to Tracy Houk in writing or by email. In order to maintain equal access to information, firm representatives are not to contact anyone other than the individual named above.
4.0 NOTIFICATION OF INTEREST AND INQUIRIES/QUESTIONS
4.1 Notification of Interest / Addenda
Upon receipt of this RFQ, firms interested in submitting a SOQ must immediately notify Tracy Houk by mail or e-mail (see 4.2) in order to place the firm’s name, address, and contact information (including e-mail address) on a Notification of Interest list for distribution of possible addenda to this RFQ.
4.2 Inquiries/Questions and Deadline
All inquiries/questions regarding this RFQ must be directed to Tracy Houk by e-mail
(thouk@huntersville.org) and must reach her office by Friday, 12:00 noon, March 14, 2025 [at least seven days before the SOQ submittal due date] in order to be considered for a response. To ensure fair consideration and equal access to information for all firms, the questions and answers will be sent via e-mail to each firm who has submitted a “Notification of Interest.” Any other contact in reference to this RFQ, prior to the time an award decision has been made, will result in disqualification of the firm.
Oral answers will not be authoritative.
5.0 QUALIFICATIONS SUBMITTAL
Written submittals of SOQs must be received by the Town of Huntersville Parks and Recreation
Department no later than Friday, 12:00 noon, March 21, 2025. Submittals received after this deadline will not be considered.
5.1 Submittal Material
http://www.huntersville.org/ https://www.ips.state.nc.us/IPS/Default.aspx mailto:thouk@huntersville.org mailto:thouk@huntersville.org
Contract for Professional Engineering Services Page 4 of 24
Firms interested in providing services as described in this RFQ shall submit their response via e-mail or digitally on a flash drive (please use the firm’s name within the file name of the digital copy and compile all files into a single file for the digital submittal) in a sealed container labeled on the outside, “RFQ for
Testing Services for Downtown Huntersville Greenway Project,” along with the firm name. Send or deliver submittals to:
Submitting by e-mail:
Tracy Houk Thouk@huntersville.org
Submitting by mail:
Attn: Tracy Houk Huntersville Parks and Recreation PO Box 2879 Huntersville, NC 28070
5.2 Notification
The selected firm will be notified via email by March 28, 2025.
5.3 Board Approval
The Town Board will consider authorizing the Town Manager to enter into a contract with the selected firm.
6.0 EVALUATION
Firms submitting SOQs to perform the desired services on this specific project will be evaluated based upon certain considerations. The following considerations, with the weighted importance, will be utilized to select firms from those submitting an RFQ:
1. Firm's experience, knowledge, familiarity, and past performance with similar projects – 40%
2. The experience of the firm's proposed staff to perform the type of work required – 35%
3. The availability of the firm’s staff to complete the project by the proposed date – 25%.
North Carolina firms qualified to do the required work will be given priority consideration. A North Carolina firm is a firm whose principal place of business is in North Carolina, staffed with an adequate number of employees with the appropriate expertise judged by the Town to be capable of performing a majority of the work required, who pays unemployment or income taxes in North Carolina.
mailto:Thouk@huntersville.org
Contract for Professional Engineering Services Page 5 of 24
7.0 SUBMITTAL DOCUMENT REQUIREMENTS
All SOQs are limited to fifteen pages inclusive of the cover sheet. SOQs containing more than fifteen pages will not be considered. Firms submitting SOQs are encouraged to carefully check them for conformance to the requirements above. If SOQs do not meet all of these requirements, they will be disqualified.
7.1 Section I - General Information
The General Information section should be two pages in length with the following information formatted into bullet points:
• Expression of firm’s interest in the work.
• Describe the firm’s experience with similar projects.
• Statement regarding firm’s possible conflict(s) of interest for the work.
• Identification of the Project Manager and their contact information.
• Describe how the firm communicates to the client throughout the process.
7.2 Section II – Evaluation Factors
7.2.1 Firm Information – Provide an organizational chart of the project team, listing key individuals involved and the role they will perform, including any field personnel. Indicate how the work described in this RFQ will fit into the total workload of the firm (maximum one page).
7.2.2 Similar Project Experience (Graphics and Narrative) – Submit a maximum of three projects completed that demonstrate experience with similar projects (maximum nine pages).
Include for each project:
Specific project name, location and client / Description of the project, size, services rendered /
List the key individuals who were responsible for the planning, design, construction engineering and inspection. Identify all public agencies that reviewed the project.
7.2.3 Individual Qualifications/Experience - Provide a description of the qualifications and experience of the key individuals who will be actively involved in the work (including registration numbers of engineers, architects, certifications, etc.). Include the office location in which each key individual is located. Clearly identify each key individual’s experience with similar type projects, the specific role that individual performed, and the firm they were employed by at the time of the project work (maximum two pages).
Contract for Professional Engineering Services Page 6 of 24
8.0 GENERAL PROVISIONS
8.1 Submittal Ownership/Costs
Upon submission, all information becomes the property of the Town, which has the right to use any or all ideas presented in any submission in response to this RFQ, whether or not the submittal results in a contract with the submitting firm. All costs for development of the written submittal and the oral presentation are entirely the obligation of the firm and shall not be remunerated in any manner by the
Town.
8.2 Non-Warranty of Request for Qualifications
Due care and diligence has been used in preparing this RFQ. However, the Town shall not be responsible for any error or omission in this RFQ, nor for the failure on the part of the firm to ensure that they have all information necessary to affect their submittals.
8.3 Request for Clarification
The Town reserves the right to request clarification of information submitted, and any additional information of one or more firms, either orally or in writing.
9.0 ACCEPTANCE/REJECTION OF SUBMITTALS
The Town reserves the right to accept or reject any or all submittals in whole or in part, with or without cause, to waive technicalities, or to accept submittals or portions thereof, which, in the Town’s judgment, best serve the interest of the
Town.
The Town of Huntersville reserves the right to allow alterations, modifications or revisions to individual elements of the
Scope of Services any time during the period of contracts, which result from this RFQ.
Collusion – The firm, by submitting a SOQ, declares that the submission is made without any previous understanding, agreement, or connections with any persons, firms, or corporations making a competing submission on the same project, and that it is in all respects, fair and in good faith without any outside control, collusion or fraud.
Contract Process - Selected firm will be invited to execute an agreement containing the Town’s standard Contract
(Attachment A). The agreement shall not guarantee project work and shall not represent a paid retainer for services. If the Town and the selected firm cannot come to terms regarding scope and/or fee for any project, either party may, at their discretion, terminate further discussions on that project.
Consideration of Submittals – SOQs will be considered from firms normally engaged in providing and performing services as specified in this RFQ. The firm must have adequate organization, facilities, equipment and personnel to ensure prompt and efficient service to the Town. The Town reserves the right to inspect the facilities and organization, or to take any other action necessary to determine ability to perform in accordance with specifications, terms, and conditions before recommending any award.
Americans with Disabilities Act (ADA) Compliance – The Town will comply with the Americans with Disabilities Act
(ADA), which prohibits discrimination on the basis of a disability. The Town will make reasonable accommodations in all programs to enable participation by an individual with a disability who meets essential eligibility requirements. Town
Contract for Professional Engineering Services Page 7 of 24 programs will be available in the most integrated setting for each individual. If any accommodations are necessary for participation in any program or services, participants are encouraged to notify Town Staff.
Applicable Laws – By the submission of an SOQ, the firm represents to the Town that it is familiar with the laws applicable to public contracts, including but not limited to, N.C.G.S § 133-1 (Conflict of Interest) and § 133-32 (Regulation of Gifts and Favors), and if awarded a contract with the Town, that the firm will comply with all such laws in the performance of such contract.
LINKS TO PLANS: North Mecklenburg Park Greenway 100% Plans
SITE
https://huntersvillenc-my.sharepoint.com/:b:/g/personal/thouk_huntersville_org/EaAGorZ5BelLjUbRbaD8uUIB4kdb2v7DcKK30d48DkemyQ?e=t5cQf0
Contract for Professional Engineering Services Page 8 of 24
ATTACHMENT A
101 Huntersville-Concord Rd
Huntersville, NC 28078
(704) 875-6541
CONTRACT FOR PROFESSIONAL
ENGINEERING SERVICES
FIRM: Name______________________ PROJECT: Street Name
Address____________________ PROJECT
ADDRESS:
Street Name at Street Name
City, State Zip________Phone #_________ Huntersville, NC
Project Manager Name_________________
Project Manager email_________________
This Contract for Professional Services, and all exhibits, (collectively this “Contract”) is entered into this _____day of ___________________, 20______ by and between, the Town of
Huntersville, a municipal corporation of the State of North Carolina, (the “Town”) and Firm
Name (the “Firm”) located at Firm Address.
WITNESSETH:
For and in consideration of the mutual promises set forth in this Contract, the sufficiency of which is acknowledged by the parties hereto, the parties do mutually agree as follows:
1. Scope of Services. The Firm agrees to perform for the Town the following services according to the following requirements:
The Firm agrees to provide engineering technicians and inspectors to perform the requested construction materials testing (“CMT”) and special inspections (“SI”) services needed to complete the project. Such professional engineering services shall constitute the
“Work.” The Scope of Services and Firm’s Fee Schedule are attached as Exhibits C and D, which are incorporated herein by reference. Additional (extra) services are defined as any work not included in the Scope of Services in Exhibit C that are requested by the Town or any review agencies (“Additional Services”). Additional
Contract for Professional Engineering Services Page 9 of 24
Services will be billed at the Firm’s billing rates as shown on the attached Exhibit E, which is incorporated herein by reference. The Firm represents to the Town that the hourly billing rates are the Firms standard billing rates. The Firm may adjust the hourly rates shown on the attached Exhibit E only if and to the extent that the Firm’s standard billing rates are adjusted. The Firm shall provide thirty (30) days advanced notice to the Town in writing of any increases to the Firm’s standard billing rates.
Upon receipt of such notice, the Town shall have the option of terminating this
Agreement within the thirty (30) day notice period given by the Firm. Any meetings not included in the Scope of Services in Exhibit C will be considered Additional
Services. Additional Services will be identified either in writing or by verbal communication but must be approved in writing by Town before proceeding to perform such Additional Services.
The Firm will be responsible for providing properly licensed engineers to complete the
Work in accordance with the standard of care ordinarily used by members of the
Firm’s engineering profession practicing under similar circumstances and at the same time in Mecklenburg County. In addition to the indemnification obligations contained in the Standard Terms and Conditions attached to this Contract, the Firm further agrees to indemnify and save harmless the Town from all claims and liabilities to the extent caused by the negligent errors or omissions of the Firm, including its engineers, technicians or subcontractors.
The Firm agrees to coordinate its Work with the work of any other separate professional services, contractors or with the work of the Town’s own forces to avoid delaying or interfering with their work.
The Firm must be properly registered with the North Carolina Board of Examiners for
Engineers and Surveyors and must be properly authorized to conduct business in the state of North Carolina. The engineers performing the Work, and in responsible charge of the Work, must be a licensed Engineer in the State of North Carolina and must have a good ethical and professional standing.
The Town reserves the right to terminate the professional service contract of the Firm based on the Firm’s breach of this Contract (ex: schedule, responsiveness, quality of design, accuracy of documents etc.). The Town reserves the right to modify the
Scope of Work described in Exhibit C Scope of Services, and in such event the Town and Firm shall negotiate in good faith to make corresponding modifications to the Fee
Schedule in Exhibit D.
2. Contract Insurance. Firm shall be required to purchase and maintain during its performance under this Contract insurance coverage as shown on the Insurance
Requirements as stated in Exhibit B, which is incorporated herein by reference. With the exception of Worker’s Compensation and Professional Liability policies, all
Contract for Professional Engineering Services Page 10 of 24 insurance purchased shall have a specific endorsement, copy of which shall be provided to the Town, naming the Town as an additional insured and for all insurance purchased, an endorsement providing that such insurance will not be cancelled without providing thirty (30) days advance written notice to the Town.
3. Standard Terms and Conditions. The Standard Terms and Conditions, attached hereto as Exhibit A, shall be a part of this Contract. The Standard Terms and Conditions are hereby incorporated by reference, and all parties agree to be bound thereby.
4. Historically Underutilized Businesses (HUB). It is the policy of the Town of to provide minorities and women equal opportunity for participating in all aspects of the Town’s contracting and procurement programs, including but not limited to employment, construction development projects, materials/services contracts and/or lease agreements, consistent with the laws of the State of North Carolina.
5. Time for Performance of the Work. The Work will begin within ten (10) days of receipt of the Notice to Proceed from the Town. The Firm and the Town recognize that time is of the essence for completion of the Work. Any Notice to Proceed shall also contain a date that the Firm shall complete the Work by (the “Date of
Completion”). The terms of this Contract shall apply to every Notice to Proceed issued by the Town.
6. Payment for Services. In consideration of the above services, the Town will pay the
Firm, in accordance with the submitted fee schedule in Exhibit D, attached hereto and incorporated by reference, plus reimbursable expenses at the Firm’s actual cost up to, but not exceeding, the lump sum stated in the Fee Schedule in Exhibit D. Firm will submit monthly invoices for Work performed based upon the Firm’s estimate of the percentage of the total Work completed during the billing period which shall be paid thirty (30) days after receipt of undisputed invoices delivered. Additional Services will be billed as provided in Paragraph 1 above in accordance with the hourly fee schedule shown on Exhibit E, attached hereto and incorporated by reference. If any invoice is disputed by the Town, in whole or in part, it shall provide a written explanation for such dispute to Firm within five days of receipt of the invoice and shall pay all undisputed amounts therein.
Contract for Professional Engineering Services Page 11 of 24
In witness thereof, the contracting parties, by their authorized agents, affix their signatures and seals at
Huntersville, North Carolina, this _______ day of __________________________, 20______.
Contractor Town of Huntersville
Name:
Name of Contractor (type or print)
Town Manager
By:
(Signature)
Attest: ___________________________
Town Clerk
Title:
This instrument has been pre-audited in the manner required by the Local Government
Budget and Fiscal Control Act
Attest:
(Secretary, if a corporation)
Finance Director
EXHIBIT A
STANDARD TERMS & CONDITIONS
1. Acceptance. Contractor’s acknowledgment of the terms of this Contract constitutes an agreement to: (i) all terms and conditions set forth or referenced herein, (ii) on any attachments hereto, (iii) any applicable solicitation documentation related to this Contract
(including without limitation any request for proposals or invitation for bids or
Contractor’s response thereto) that deal with the same subject matter as this Contract, and
(iv) any other terms and conditions of a written agreement signed by Contractor and the
Town that deals with the same subject matter as this Contract (collectively, the “Contract
Documents”). The terms and provisions set forth in the Contract Documents shall constitute the entire agreement between Contractor and the Town with respect to the purchase by the Town of the: (i) goods (“Goods”) and/or (ii) services provided or work performed (“Services”) as described in the Contract Documents. The agreements set forth in the Contract Documents are sometimes referred to herein as the “Contract.” In the event of any conflict between any terms and conditions of the Contract Documents, the terms and conditions most favorable to the Town shall control. No additional or supplemental provision or provisions in variance herewith that may appear in
Contractor's quotation, acknowledgment, invoice, or in any other communication from
Contractor to the Town shall be deemed accepted by or binding on the Town. The Town hereby expressly rejects all such provisions which supplement, modify, or otherwise vary from the terms of the Contract Documents, and such provisions are superseded by the terms and conditions stated in the Contract Documents, unless and until the Town’s authorized representatives expressly assent, in writing, to such provisions. Stenographic and clerical errors and omissions by the Town are subject to correction.
2. Entire Agreement. These terms and conditions and any other specifications contained in any other documents referenced shall constitute and represent the complete and entire agreement between the Town and Contractor and supersede all previous communications, either written or verbal with respect to the subject matter of this Contract.
3. Changes, Additions, Deletions. No changes, additions, deletions, or substitutions of scope of work, specifications, terms and conditions, quantity, unit of issue, delivery date, delivery charges or price will be permitted without the prior written approval from the
Town.
4. Relationship of the Parties. The Contractor is an independent contractor and not an employee of the Town. The conduct and control of the work will lie solely with the
Contractor. The Contract shall not be construed as establishing a joint venture, partnership, or any principal-agent relationship for any purpose between the Contractor and the Town. Employees of the Contractor shall remain subject to the exclusive control and supervision of the Contractor, which is solely responsible for their compensation.
5. Prices. If Contractor’s price or the regular market price of any of the Goods or Services covered hereunder is lower than the price stated in the Contract Documents on the date of shipment of such Goods or performance of such Services, Contractor agrees to give the
Town the benefit of such lower price on any such Goods or Services. In no event shall
Contractor’s price be higher than the price last quoted or last charged to the Town unless otherwise agreed in writing. No charges for transportation, boxing, crating, etc. are allowable unless such charges are included in the Contract Documents .
6. Taxes. Any applicable taxes shall be invoiced as a separate item.
7. Substitutions. No substitutions or cancellations shall be permitted without prior written approval from the Town.
8. Indemnification. To the greatest extent allowed by North Carolina law the Contractor shall indemnify and hold harmless the Town, its officers, agents, employees and assigns from and against all claims, losses, costs, damages, expenses (including expenses of litigation and attorneys’ fees), and attorneys’ fees (“Claims”). In the event that any portion of the Service performed under the Contract shall be defective in any respect whatsoever, the Firm shall indemnify and save harmless the Town, its officers, agents, employees, and assigns from and against all Claims as defined herein, but only to the extent allowed by law.
Nothing contained in this Contract shall waive the Constitutional limitation on the Town indemnifying obligations of other parties.
9. Invoices and Payment Terms. It is understood and agreed that orders will be shipped at the established Contract prices in effect on dates orders are placed. Invoicing that does not comply with this provision will subject the Contract to cancellation. Upon satisfactory delivery of the Goods or satisfactory completion of the Work, all invoices and statements shall reference the Contract number and be submitted to: Town of
Huntersville, Accounts Payable, PO Box 664, Huntersville, North Carolina, 28070.
Payment terms are Net 30 days after receipt of correct, undisputed invoice or acceptance of Goods or Services, whichever is later.
When the Contract is for construction services, the Contractor will submit monthly
Requests for Payment for Work performed, for review. The Request for payment shall be based upon the Contractor’s estimate of the percentage of the total Work completed during the period represented on the Request for Payment. The Contractor must certify that the Work represented in the Contractor’s Request for Payment has been completed in accordance with the Contract Documents and certify that the Request for Payment is appropriate for payment before the Town shall be obligated to make such payment to the
Contractor. If any Request for Payment is disputed by the Town, in whole or in part, the
Town shall provide a written explanation for such dispute to Contractor within five days of receipt of the certified Request for Payment and shall pay all undisputed amounts therein.
10. Anti-Discrimination and Equal Employment. During the performance of the Contract, Contractor shall comply with all federal and state requirements concerning fair and equal employment and shall not discriminate against or deny the Contract’s benefits to any person on the basis of race, religion, color, creed, national origin, age, sex (including sexual orientation, gender identity, and pregnancy), disability or handicapping condition, or genetic information.
11. Insurance. The Firm shall provide the insurance coverages shown on Exhibit B, attached hereto and incorporated herein by reference. The Firm shall provide the Town with a
North Carolina Certificate of Insurance and such endorsements as may be required by the
Contract Documents prior to the commencement of any work under the Contract and agrees to maintain such insurance until the completion of the Contract. Such certificates of insurance shall be considered part of the Contract.
12. Ethics in Public Contracting. By submitting their prices and acceptance of this
Contract, all Contractors certify that their bids are made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other supplier, manufacturer, or subcontractor in connection with their offer, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged.
13. Applicable Laws and Courts. All Town Contracts for Services shall be governed in all respects by the laws of the State of North Carolina. All matters, whether sounding in contract or tort relating to the validity, construction, interpretation, and enforcement of the Contract, shall be governed in all respects by the laws of the State of North Carolina and venue shall be proper only in a court of competent jurisdiction located in Mecklenburg
County, North Carolina. The Contractor represents and warrants that it shall comply with all applicable federal, state, and local laws, regulations, and orders, including, not limited to, licensure requirements.
14. Codes and Permits. When applicable, the Contractor shall obtain all required permits, , give all required notices, and comply with all laws, ordinances, codes, rules, and regulations bearing on the conduct of the work under this contract. If the Contractor observes that the drawings and specifications are at variance therewith, he shall promptly notify the designer in writing. All work under this contract shall conform to the current
North Carolina Building Code and other state and national codes as are applicable. If the
Contractor performs any work knowing it to be contrary to such laws, ordinances, codes, rules and regulations, and without such notice to the Owner, he shall bear all cost arising therefrom.
15. License Requirement. If applicable, the Contractor must be a licensed General
Contractor as required by North Carolina General Statutes Section 87-1 and must have a good ethical and professional standing with the North Carolina General Contractor’s
Licensing Board. The Contractor will be responsible for providing properly qualified, licensed (if required) personnel to complete the Work in accordance with the standard of care ordinarily used by members of the Contractor’s profession practicing under similar circumstances and at the same time in Mecklenburg County.
16. Strict Compliance. The Town may at any time insist upon strict compliance with these terms and conditions notwithstanding any previous course of dealing or course of performance between the parties to the contrary.
17. Assignment. Contractor may not assign, pledge, or in any manner encumber Contractor’s rights under this Contract or delegate the performance of any of its obligations hereunder, without Town’s prior, express written consent.
18. General Provisions. The Town’s remedies as set forth herein are not exclusive. Any delay or omission by the Town in exercising any right hereunder, or any waiver by the
Town of any single breach or default hereunder, shall not be deemed to be a waiver of such right or of any other right, breach, or default.
19. Warranties. The Contractor warrants it shall adhere to all laws, codes, ordinances, and regulations of the United States, the State of North Carolina, the County of Mecklenburg, and the Town of Huntersville in the performance of the Services outlined in this Contract and any attached specifications. Contractor warrants that any finished work completed hereunder shall also adhere to all laws, codes, ordinances, and regulations of the United
States, the State of North Carolina, the County of Mecklenburg, and the Town of
Huntersville. Contractor warrants that all Services delivered hereunder will be free from defects in materials and workmanship and will conform strictly to the specifications, drawings, or samples specified or furnished. This warranty shall survive any inspection, delivery, acceptance, or payment by the Town of the Services and shall run to the Town and any user of the Services. Contractor warrants that all Services will be performed in a professional and workman like manner in accordance with best industry practices. This express warranty is in addition to Contractor’s implied warranties of merchantability and fitness for a particular purpose which shall not be disclaimed. In addition to any other rights available at law or in equity, the Town shall be entitled to consequential and incidental damages.
20. Quality and Workmanship. All work shall be performed to the satisfaction of the
Town. The work shall not be considered complete nor applicable payments rendered until the Town is satisfied with the Services provided.
21. Default. The Town may terminate the Contract, in whole or in part, immediately and without prior notice upon breach of the Contract by the Contractor. In addition to any other remedies available to the Town in law or equity, the Town may procure upon such terms as the Town shall deem appropriate, Services substantially similar to those so terminated, in which case the Contractor shall be liable to the Town for any excess costs for such similar supplies or services and any expenses incurred in connection therewith.
22. Termination for Convenience. The Town shall have the right, without assigning any reason therefore, to terminate any work under the Contract, in whole or in part, at any time at its complete discretion by providing 10 days’ notice in writing from the Town to
Contractor. If the Contract is terminated by the Town in accordance with this paragraph, the Contractor will be paid in an amount which bears the same ratio to the total compensation as does the Services actually delivered or performed to the total originally contemplated in the Contract. The Town will not be liable to the Contractor for any costs for materials acquired or contracted for if such costs were incurred prior to the date of this Contract.
23. Risk of Loss. Risk of Loss for all supplies, materials, the Work performed, and the
Project as it is being constructed, shall be on the Contractor until such time as substantial completion is achieved, and approved by the Town.
24. No Third-Party Beneficiaries. There shall be no intended nor incidental third-party beneficiaries of this Contract. Contractor shall include in all contracts, subcontracts, or other agreements relating to the Contract an acknowledgment by the contracting parties that the Contract creates no third-party beneficiaries.
25. Exclusivity. Nothing in this Contract shall require the Town to use the Contractor or prohibit the Town from soliciting third parties for the good or services provided in this
Contract.
26. Confidentiality. The Contractor acknowledges the Town is subject to public records law and no term shall be inconsistent with N.C.G.S. §132 et al.
27. Valid Contract for Services. In order for a Contract for Services of the Town to be valid, it must be executed by the Town Manager or his or her authorized designee, and must be pre-audited in that manner required by the Local Government Budget and Fiscal
Control Act, as the same may be amended.
28. Verification of Work Authorization. Contractor shall comply with, and require all contractors and subcontractors to comply with, the requirements of Article 2 of Chapter
64 of the North Carolina General Statutes, “Verification of Work Authorization,” sometimes known as E-verify, for all contractors and subcontractors.
29. Iran Divestment List. With the execution hereof, Contractor, certifies that they are not on the Iran Final Divestment List created by the N.C. State Treasurer pursuant to
N.C.G.S. § 147-86.58, and will not contract with anyone on such List in performance of the work hereunder.
30. Buyer. All references to Buyer or Town, throughout these terms and conditions, shall refer to the Town of Huntersville, North Carolina.
31. Contractor. All references to Contractor, Seller, or Firm throughout these terms and conditions shall refer to the contractor identified on page 1 of this Contract.
32. Authority to Sign. Each of the Parties herein represents and warrants that the execution, delivery, and performance of this Contract has been duly authorized to execute this
Contract and to bind that party of whose behalf the individual is signing.
33. Availability of Funds. Any and all payments to the Contractor are dependent upon and subject to the availability of funds to the Town for the purpose set forth in this agreement.
34. Severability. If any provision of this Contract is found to be invalid or unlawful, then remainder of this Contract shall not be affected thereby, and each remaining provision shall be valid and enforced to the fullest extent permitted by law.
35. Companies that Boycott Israel. With the execution hereof, Contractor, certifies that they are not on the Companies that Boycott Israel List created by the N.C. State Treasurer pursuant to N.C.G.S. § 147-86.80, and will not contract with anyone on such List in performance of the work hereunder.
36. Governmental Immunity. Nothing contained in this Contract shall constitute a waiver of the Town’s governmental immunity or of any limitation on liability or damages created by law.
EXHIBIT B
INSURANCE AND BOND REQUIREMENTS
1. The Work under this Contract shall not commence until the Contractor has obtained all required insurance and verifying certificates of insurance have been approved in writing by the Town. The Contractor shall furnish the Town with satisfactory proof of carriage of the insurance required before written approval is granted by the Town.
2. The insurance coverage shall be provided and maintained for the duration of the
Contract.
3. Except for Worker’s Compensation and Professional Liability policies, the Town shall be named as additional insured on all policies with coverage at least as broad as that provided to the named insureds.
4. The verifying certificates shall document that coverages afforded under the policies will not be cancelled, reduced in amount, or coverages eliminated until at least thirty (30) days after mailing written notice, by certified mail, return receipt requested, to the insured and the Town of such alteration or cancellation.
5. If endorsements are needed to comply with the notification or other requirements of this
Agreement, copies of the endorsements shall be submitted with the certificates.
6. Any deductible, if applicable to loss covered by insurance provided, is to be borne by the Contractor.
7. The Contractor is required to provide and maintain the following minimum insurance coverage:
a. Worker’s Compensation and Employer's Liability.
The Contractor shall provide and maintain, until final acceptance, Workers’
Compensation insurance, as required by law, as well as employer’s liability coverage with minimum limits of $1,000,000.
b. Commercial General Liability (CGL) Insurance.
The Contractor shall provide and maintain, commercial general liability insurance, including coverage for premises operations, independent contractors, completed operations, products and contractual exposures, as shall protect such contractors from claims arising out of any bodily injury, including accidental death, as well as from claims for property damages which may arise from operations under this contract, whether such operations be by the Contractor or by any subcontractor, or by anyone directly or indirectly employed by either of them and the minimum limits of such insurance shall be as follows:
Bodily Injury: $1,000,000 per occurrence/$2,000,000 aggregate
Property Damage: $1,000,000 per occurrence/$2,000,000 aggregate
Products/Completed Operations: $1,000,000 per occurrence/$2,000,000 aggregate
Such coverage for completed operations must be maintained for at least two (2) years following final acceptance of the Work performed under the contract.
The commercial general liability insurance policy shall provide that such insurance is primary to and non-contributory with any liability insurance carried by the additional insureds and provide a severability of interests clause.
c. Automobile Liability.
The Contractor shall provide and maintain automobile liability coverage including coverage for owned, hired, and non-owned vehicles, with limits no less than
$1,000,000 per accident for bodily injury and property damage.
d. Builder’s Risk/Course of Construction.
For construction projects, the Contractor shall provide and maintain builder’s risk coverage utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.
This coverage is not required for road maintenance projects.
e. Professional Liability.
The Contractor shall provide and maintain professional liability coverage with limits no less than $2,000,000.
f. Pollution Liability.
The Contractor shall provide and maintain pollution liability coverage with minimum limits of $1,000,000 per occurrence/aggregate.
g. Umbrella Coverage.
The Contractor shall provide and maintain umbrella coverage with minimum limits of no less than $1,000,000 per occurrence/aggregate.
h. Other Insurance.
The Contractor shall obtain such additional insurance as may be required by the
Town or by the General Statutes of North Carolina including motor vehicle insurance, in amounts not less than the statutory limits.
8. If the Contractor maintains broader coverage and/or higher limits than the minimum limits shown above, the Town requires and shall be entitled to the broader coverage and/or high limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Town.
9. The policies shall provide that any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Town or its officers, officials, employees, agents, or volunteers.
10. All liability and Workers’ Compensation insurance policies shall provide that the insurance company waives all rights of recovery by way of subrogation against the
Town and other insureds.
11. The insurance providers shall be North Carolina admitted insurers (licensed to do business in North Carolina) with a current A.M. Best’s rating of no less than A-VIII.
Notwithstanding the foregoing, if no North Carolina admitted insurance company provides the required insurance, it is acceptable to procure the required insurance from a
United States domiciled carrier that meets the required Best’s rating.
12. The Town reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.
13. The limits of insurance described herein shall not limit the liability of the Contractor and Contractor’s officers, employees, agents, representatives, and subcontractors. The
Contractor’s obligation to defend, indemnify, and hold the Town and its officers, officials, employees, agents and volunteers harmless under the provisions of this paragraph are not limited to or restricted by any requirement in the Contract for
Contractor to procure and maintain a policy of insurance.
14. For construction projects only, the Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and
Contractor shall ensure that Town is an additional insured on insurance required from subcontractors.
15. For construction projects only, the Contractor shall provide a payment bond and a performance bond in a sum equal to 100% of the contract price.
EXHIBIT C
FIRM’S SCOPE OF SERVICES
[Attach a copy]
EXHIBIT D
FIRM’S FEE SCHEDULE
Services Qty Units Fee Type Fee
Survey Services
Full Boundary Survey Each
Recombination Plats Each
SUB TOTAL
NOT TO EXCEED TOTAL =
EXHIBIT E
FIRM’S HOURLY RATES FOR ADDITIONAL SERVICES
[Attach a copy]
END OF REQUEST FOR QUALIFICATIONS