About this file
This is a Traffic Control/Roadway Work Permit form issued by the New Mexico Department of Transportation (NMDOT) for projects requiring traffic management on state roadways. The permit establishes the framework for contractors to conduct roadway work while maintaining traffic safety and compliance with the Manual on Uniform Traffic Control Devices (MUTCD). The form requires submission of project-specific information including the contractor name, traffic control firm details, work zone location (route, mile post, or intersection), road classification (2 to 8 lanes), existing and proposed speed limits, and work duration with specific start and end dates and daily time parameters. Contractors must identify the purpose of work, whether for roadway construction/rehabilitation, shoulder work, signal and lighting work, utility work, drainage/excavation, soil testing, signing and striping, or other activities. A Traffic Control Plan (TCP) must be enclosed with the permit application or the NMDOT will not process the request.
The permit approval is conditioned upon the contractor's adherence to MUTCD standards and acceptance of indemnification and liability requirements protecting NMDOT and its employees from negligent acts. Contractors must provide NMDOT with a certified copy of their insurance policy and certificate of insurance naming NMDOT as an additional-named insured with primary coverage over other valid insurance policies. The contractor and TCP firm must contact the NMDOT District Office to confirm actual start dates and adhere to all attached conditions and notes. The permit is subject to approval, approval as amended, or denial by the NMDOT District Office Traffic Section, with approval documentation submitted to the District Public Information Officer.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Whole_Block_Reconstruction_-_Ciniza_Drive,_Gallup_NM_(Addendum_#1_Revision).pdf | ||
| Whole_Block_Reconstruction_-_Ciniza_Drive,_Gallup_NM.pdf | ||
| Plans:_Whole_Block,_Ciniza_Drive_ITB-2701-stamped.pdf | ||
| Engineer_Estimate_Whole_Block_Ciniza.pdf | ||
| Wage_Rates_MC-26-2209-A.pdf | ||
| EPA_Form_3510-9.pdf | ||
| Affidavit_of_Wages_Paid.pdf | ||
| Gallup_Sample_Contract.pdf | ||
| EPA_Form_3510-13.pdf | ||
| Gallup_Municipal_ROW-Public_Easement_Work_Permit.pdf | ||
| NMDOT_Indemnification_and_Hold_Harmless_Agreement.pdf | ||
| Statement_of_Intent_To_Pay_Prevailing_Wages.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form No. A-66 New 03/13
NEW MEXICO DEPARTMENT OF TRANSPORTATION
(NMDOT)
TRAFFIC CONTROL/ROADWAY WORK PERMIT
NMDOT Project Number (If applicable): Control Number:
General Scope of work:
Contractor Name:
Contact Person:
Contact Telephone: ( ) - Fax: ( ) -
Traffic Control Firm:
Certified Traffic Control Supervisor:
Contact Telephone: ( ) - Fax: ( ) -
Work Zone Location Information:
Route:
Mile Post: From To:
Or Intersection: Intersection:
Direction (NB, SB, EB, WB, or both):
2 lane Road 4 lane Road 6 lane Road 8 Lane Road Divided Undivided Existing Speed limit in area: ___ MPH or Ranges from ___MPH to ___MPH Proposed Speed Limit reduction within work zone (If Applicable):______________ MPH
Working Duration:
Start Date: End Date :_______________________________ Daily Start Time End Time:
Purpose of Permit: Roadway Construction/Rehab. Shoulder Work Signal and Lighting Work Utility work Drainage/Excavation work Soil Testing Signing and Striping Placement
Other:
TCP Plan Enclosed ___ (TC Permit will not be processed without a TCP plan)
If no, describe why:
Approval is conditioned on the following terms that are deemed accepted by the Contractor upon submission of this Permit
1. Traffic Control for operations under this permit shall conform with the Manual on Uniform Traffic Control Devices (MUTCD).
2. The Contractor agrees to indemnify and hold harmless the NMDOT and its employees from liability, claims, damages losses or expenses due to any negligent act of the Contractor, the Contractor’s employees, any agent acting on the Contractor’s behalf, and anyone else engaged by the Contractor to work pursuant to this permit.
3. The Contractor shall provide the NMDOT a certified copy of the its insurance policy and certificate of insurance and shall include on the certificate of insurance the NMDOT as an additional-named insured, with notice that the coverage is primary over any other valid insurance.
4. Any additional conditions as attached and referenced below.
For Official Use:
Approved (see conditions below) Approved As Amended Not Approved
Contractor/TCP firm SHALL contact the District Office and confirm the actual start dates.
TCP Firm and Contractor must adhere to the attached notes.
Permit Number: - Approved By
NMDOT District Office – Traffic Section Submitted to the District Public Information Officer By:_____________________________ On:____/_____/_____
| TRAFFIC CONTROL/ROADWAY WORK PERMIT |
| Or Intersection: Intersection: |
| NMDOT Project Number If applicable: |
| Control Number: |
| General Scope of work: |
| Contractor Name: |
| Contact Person: |
| Traffic Control Firm: |
| Certified Traffic Control Supervisor: |
| Mile Post From: |
| To: |
| Or Intersection: |
| Intersection: |
| Direction NB SB EB WB or both: |
| 4 lane Road: Off |
| 6 lane Road: Off |
| 8 Lane Road: Off |
| Divided: Off |
| Undivided: Off |
| Proposed Speed Limit reduction within work zone If Applicable: |
| Start Date: |
| Daily Start Time: |
| End Time: |
| Other: |
| TCP Plan Enclosed 1: |
| TCP Plan Enclosed 2: |
| If no describe why: |
| Approved By: |
| Submitted to the District Public Information Officer By: |
| On: |
| undefined_7: |
| undefined_8: |
| Text1: |
| Text2: |
| Text3: |
| 2 lane Road: Off |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| 15: Off |
| 16: Off |
| 17: Off |
| 18: Off |
| 19: Off |
| 20: Off |
| 21: Off |
| 22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Text85: |
| Text86: |
| Text87: |
| Text13: |
| Text563: |
| Text564: |
| Text566: |
| Text258: |
File details come from the government source that posted it. Updated .