City of North Miami Beach Public Library Restroom Remodel - Technical Specifications Summary

This document comprises the 100% construction documents and technical specifications for the City of North Miami Beach Public Library Restroom Remodel Project (Project No. NMB-FY24-040), prepared by EXP U.S. Services Inc. as of September 4, 2025. The project encompasses the renovation and reconfiguration of existing public restroom facilities, including the addition of two unisex restrooms and renovation of existing men's and women's restrooms. The City of North Miami Beach is soliciting sealed responses via the city's eProcurement Portal at https://procurement.opengov.com/portal/citynmb, with responses due prior to 3:00 pm on Monday, November 16, 2026. The specifications detail work across multiple divisions, including selective demolition, cast-in-place concrete, miscellaneous rough carpentry, thermal insulation, and firestopping systems. The construction documents mandate preinstallation meetings, field quality control testing, and compliance with applicable standards including ACI 301, ASTM specifications, and ICC requirements.

The technical specifications establish comprehensive requirements for concrete mixtures (Classes A through D with minimum 5000 psi compressive strength at 28 days), insulation materials including mineral-wool and glass-fiber products with R-value specifications, and penetration firestopping systems rated by qualified testing agencies. Materials and workmanship must comply with standards from organizations including the American Concrete Institute (ACI), ASTM International, the National Fire Protection Association (NFPA), and the International Code Council (ICC). The specifications require independent testing agency involvement for concrete testing, with detailed protocols for specimen curing, compressive strength testing at seven and 28 days, and field quality control inspections. Contractors must provide submittals including design mixtures, concrete schedules, product data, shop drawings, and installer certifications, with all work performed in compliance with manufacturer instructions and applicable building codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifications

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY - RESTROOM REMODEL

PROJECT NO. NMB-FY24-040

100% CONSTRUCTION DOCUMENTS

September 4, 2025

VOLUME - 1

EXP U.S. SERVICES INC.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

PROJECT NO.

NMB-FY24-040

TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 020000 – EXISTING CONDITION

024119 SELECTIVE DEMOLITION

DIVISION 030000 – CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 060000 – WOOD, PLASTIC, AND COMPOSITES

061053 MISCELLANEOUS ROUGH CARPENTRY

DIVISION 070000 – THERMAL AND MOISTURE PROTECTION

072100 THERMAL INSULATION

078413 PENETRATION FIRE STOPPING

078443 JOINT FIRESTOPPING

079200 JOINT SEALANTS

079219 ACOUSTICAL JOINT SEALANTS

DIVISION 080000 – OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES

083113 ACCESS DOORS AND FRAMES

087100 DOOR HARDWARE

DIVISION 090000 – FINISHES

092216 NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

093013 PORCELAIN TILING

099123 INTERIOR PAINTING

DIVISION 100000 – SPECIALTIES

101423.16 ROOM-IDENTIFICATION PANEL SIGNAGE

102113.19 PLASTIC TOILET COMPARTMENTS

102800 TOILET, BATH, AND LAUNDRY ACCESSORIES

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

PROJECT NO.

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. The Work of this Section Includes:

1. Demolition and removal of selected portions of interior of building elements.

2. Removal and salvage of existing items for delivery to Owner and removal of existing items for reinstallation.

B. Related Requirements:

1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Section 017300 "Execution" for cutting and patching procedures.

3. Section 013516 "Alteration Project Procedures" for general protection and work procedures for alteration projects.

4. Section 330500 "Common Work Results for Utilities" for removal of site utility systems piping, equipment, and components.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner as indicated.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage; prepare for reuse; and reinstall where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 2

1.4 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

6. Review and finalize protection requirements.

7. Review procedures for noise control and dust control.

8. Review storage, protection, and accounting for items to be removed for salvage or reinstallation.

1.6 INFORMATIONAL SUBMITTALS

A. Engineering Survey: Submit engineering survey of condition of building.

B. Survey of Existing Conditions: Submit survey.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection , for dust control and , for noise control. Indicate proposed locations and construction of barriers.

D. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.

2. Temporary interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.

E. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 3

1.7 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

1.8 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

C. Hazardous Materials:

1. It is not expected that hazardous materials will be encountered in the Work.

a. Hazardous materials will be removed by a licensed asbestos abatement contractor, hired by the General Contractor before start of the Work.

b. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. All ACM removals will be performed by a licensed asbestos abatement contractor, hired by the General Contractor. Appropriate asbestos mitigation measures will be implemented in accordance with regulatory requirements to ensure safety and compliance.

D. On-site sale of removed items or materials is not permitted.

1.9 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding.

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect.

Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

C. Sustainable Design Requirements for Building Reuse:

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 4

1. Maintain the existing building structural systems where indicated to remain. Do not demolish such existing construction beyond indicated limits.

2. Maintain the existing interior ceilings, interior partitions, and/or demountable walls where indicated to remain. Do not demolish such existing construction beyond indicated limits.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

D. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

E. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video. Comply with Section 013233 "Photographic Documentation."

1. Inventory and record the condition of items to be removed for salvage or reinstallation. Photograph or video conditions that might be misconstrued as damage caused by removal.

2. Photograph or video existing conditions of adjoining construction including finish surfaces, that might be misconstrued as damage caused by selective demolition operations or removal of items for salvage or reinstallation.

3.2 PREPARATION

A. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

B. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 5

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location and cleaned and reinstalled in their original locations after selective demolition operations are complete.

D. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment in accordance with 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND BUILDING SYSTEMS

A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated utilities when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If disconnection of utilities and building systems will affect adjacent occupied parts of the building, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to those parts of the building.

4. Demolish and remove existing building systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment and components.

5. Abandon existing building systems, equipment, and components indicated on Drawings to be abandoned in place.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 6

a. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

b. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

6. Remove and reinstall/salvage existing building systems, equipment, and components indicated on drawings to be removed and reinstalled or removed and salvaged:

a. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment and components; when appropriate, reinstall, reconnect, and make equipment operational.

b. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and components and deliver to Owner.

3.4 SALVAGE/REINSTALL

A. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area designated by Owner.

5. Protect items from damage during transport and storage.

B. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level.

Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required.

Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 7

marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least 4 hours after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Concrete:

1. Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.

2. Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.

B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.

D. Resilient Floor Coverings: Remove floor coverings and adhesive in accordance with recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

4. Comply with requirements specified in Section 017419 "Construction Waste

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

SELECTIVE DEMOLITION 024119 - 8

Management and Disposal."

B. Burning: Do not burn demolished materials.

3.8 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

EXP US SERVICES INC.

September 4,2025

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 -GENERAL

1.1 SUMMARY

1. Concrete standards.

2. Concrete materials.

3. Repair materials.

4. Concrete mixture materials.

5. Concrete mixture class types.

6. Concrete mixing.

1.2 DEFINITIONS

A. Cementitious Materials: Portland cement or blended hydraulic cement alone or in combination with one or more of the following:

1. Fly ash, slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.

B. Water/Cementitious Materials (w/cm) Ratio: The ratio by weight of mixing water to cementitious materials.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for inspections and acceptance testing of concrete at Project site.

c. Ready-mix concrete manufacturer.

d. Concrete Subcontractor.

e. Special concrete finish Subcontractor.

2. Review the following:

a. Special inspection and testing and inspecting agency procedures for field quality control.

b. Construction joints, control joints, isolation joints, and joint-filler strips.

c. Semirigid joint fillers.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 2

d. Vapor-retarder installation.

e. Anchor rod and anchorage device installation tolerances.

f. Cold- and hot-weather concreting procedures.

g. Concrete finishes and finishing.

h. Curing procedures.

i. Forms and form-removal limitations.

j. Shoring and reshoring procedures.

k. Methods for achieving specified floor and slab flatness and levelness.

l. Floor and slab flatness and levelness measurements.

m. Concrete repair procedures.

n. Concrete protection.

o. Initial curing of standard-cured and field curing of field-cured test cylinders (ASTM C31/C31M.)

p. Protection of field cured field test cylinders.

q. Distribution of test reports.

1.4 ACTION SUBMITTALS

A. Product Data:

1. Portland cement.

2. Blended hydraulic cement.

3. Performance-based hydraulic cement.

4. Fly ash.

5. Slag cement.

6. Silica fume.

7. Natural or other pozzolans.

8. Aggregates.

9. Ground calcium carbonate and aggregate mineral fillers.

10. Admixtures:

a. Include limitations of use. Admixtures that do not comply with reference ASTM International requirements must be submitted with test data for approval.

11. Color pigments.

12. Fiber reinforcement.

13. Vapor retarders.

14. Floor and slab treatments.

15. Liquid floor treatments.

16. Curing materials.

a. Include documentation from color pigment manufacturer, indicating that proposed methods of curing are recommended by color pigment manufacturer.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 3

17. Joint fillers.

18. Repair materials.

B. Design Mixtures: For each concrete mixture, include the following:

1. Mixture identification.

2. Compressive strength at 28 days or other age as specified.

3. Compressive strength required at stages of construction.

4. Durability exposure classes for Exposure Categories F, S, W, and C.

5. Maximum w/cm ratio.

6. Calculated equilibrium and fresh density for lightweight concrete.

7. Slump or slump flow limit.

8. Air content.

9. Nominal maximum aggregate size.

10. Steel-fiber reinforcement content.

11. Synthetic microfiber content.

12. Synthetic macrofiber content.

13. Intended placement method.

14. Submit adjustments to design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant changes.

C. Shop Drawings:

1. Construction Joint Layout: Indicate proposed construction joints required to construct the structure.

a. Location of construction joints as indicated in the as-built drawings.

D. Concrete Schedule: For each location of each class of concrete indicated in "Concrete Mixture Class Types" Article, including the following:

1. Concrete class designation.

2. Location within Project.

3. Exposure class designation.

4. Formed surface finish designation and final finish.

5. Final finish for floors.

6. Floor treatment, if any.

A. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.

1. Manufacturer's production facilities and delivery vehicles certified in accordance with NRMCA's certification requirements or equivalent approval by a State DOT.

B. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with ASTM C1077 and ASTM E329 for testing that performs duties

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 4

on behalf of the Architect/Engineer.

1. Personnel performing laboratory tests to be an ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician, Level 1. Testing agency laboratory supervisor tests to be an ACI-certified Concrete Laboratory Testing Technician, Level 2.

C. Field Quality-Control Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.

1. Personnel conducting field tests on plastic concrete properties are to be qualified as an ACI Concrete Field Testing Technician, Grade 1, in accordance with policies from ACI CPP 610.1 or an equivalent certification program.

1.5 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on each concrete mixture.

1. Include the following information in each test report:

a. Admixture dosage rates.

b. Slump.

c. Air content.

d. Seven-day compressive strength.

e. 28-day compressive strength.

f. Evaluation of permeability-reducing admixtures.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Comply with ASTM C94/C94M and ACI 301.

1.7 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 301 as follows:

1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

2. When air temperature has fallen to, or is expected to fall below 40 deg F during the protection period, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

3. Do not use frozen materials or materials containing ice or snow.

4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 5

B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:

1. Maintain concrete temperature at time of discharge to not exceed [95 deg F][other permitted limit].

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

1.8 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to furnish replacement sheet vapor retarder/termite barrier material and accessories for sheet vapor retarder/ termite barrier and accessories that do not comply with requirements or that fail to resist penetration by termites within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

PART 2 -PRODUCTS

1.1 CONCRETE STANDARDS

A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.

1.2 CONCRETE MATERIALS

A. Cementitious Materials:

1. Portland Cement: ASTM C150/C150M, Type II, gray.

2. Pozzolans: ASTM C618, Class C, F, or N.

3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.

4. Ground Glass Pozzolan: ASTM C1866/C1866M, Type GS or GE.

5. Silica Fume: ASTM C1240.

B. Normal-Weight Aggregates:

1. Coarse Aggregate: ASTM C33/C33M, Class 1N

2. Maximum Coarse-Aggregate Size: 3/4 inch nominal.

3. Fine Aggregate: ASTM C33/C33M.

4. Recycled Aggregate: Provide documentation of characteristics of recycled aggregate and mechanical properties and durability of proposed concrete, which incorporates recycled aggregate to conform to appliable requirements for the class of concrete.

5. Alkali-Silica Reaction: Comply with one of the following for each aggregate used:

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 6

a. Expansion Result of Aggregate: Not more than 0.04 percent at one year when tested in accordance with ASTM C1293.

b. Expansion Results of Aggregate and Cementitious Materials in Combination: Not more than 0.10 percent at an age of 16 days when tested in accordance with ASTM C1567. Do not use this option with fly ash with an alkali content greater than 4.0 percent. Submit supporting data for each aggregate showing expansion in excess of

0.10 percent when tested in accordance with ASTM C1260.

c. Alkali Content in Concrete: Not to exceed 4 lb./cu. yd. for aggregate with expansion greater than or equal to 0.04 percent and less than

0.12 percent or 3 lb./cu. yd. for aggregate with expansion greater than or equal to 0.12 percent and less than 0.24 percent. Test aggregate reactivity in accordance with ASTM C1293. Calculate alkali content of concrete in accordance with ACI 301. Do not use this option with natural pozzolan or fly ash that has a calcium oxide content greater than 18 percent or an alkali content greater than 4.0 percent; or for an aggregate with expansion at one year greater than or equal to 0.24 percent when tested in accordance with ASTM C1293.

C. Ground Calcium Carbonate or Aggregate Mineral Filler: ASTM C1797. Unless otherwise permitted, do not use mineral filler derived from carbonate sources in concrete for members assigned to Exposure Class S1, S2, or S3.

1.3 ADMIXTURES

A. Air-Entraining Admixture: ASTM C260/C260M.

B. Chemical Admixtures: Do not use calcium chloride or admixtures containing calcium chloride in steel-reinforced concrete.

1. Water-Reducing Admixture: ASTM C494/C494M, Type A.

2. Retarding Admixture: ASTM C494/C494M, Type B.

3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.

5. High-Range, Water-Reducing and -Retarding Admixture: ASTM

C494/C494M, Type G.

6. Admixtures with special properties, with documentation of claimed performance enhancement, ASTM C494/C494M, Type S.

C. Mixing Water for Concrete Mixtures and Water Used to Make Ice: ASTM C1602/C1602M. Include documentation of compliance with limits for alkalis, sulfates, chlorides, or solids content of mixing water from Table 2 in ASTM C1602/C1602M.

1.4 CURING MATERIALS

A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 7

B. Moisture-Retaining Cover: ASTM C171, polyethylene film burlap-polyethylene sheet.

1. Color:

a. Ambient Temperature Below 50 deg F (10 deg C): Black.

b. Ambient Temperature between 50 and 85 deg F (10 and 29 deg C):

Any color.

c. Ambient Temperature Above 85 deg F (29 deg C): White.

C. Water: Potable water that does not cause staining of the surface.

1.5 ACCESSORIES

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D1751, asphalt-saturated cellulosic fiber or ASTM D1752, cork or self-expanding cork.

B. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

C. Epoxy Bonding Adhesive: ASTM C881/C881M, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade and class to suit requirements, and as follows:

1. Types I and II, nonload bearing, for bonding hardened or freshly mixed concrete to hardened concrete.

1.6 REPAIR MATERIALS

A. Repair Underlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at edges to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

2. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand, as recommended by underlayment manufacturer.

4. Compressive Strength: Not less than 4000 psi at 28 days when tested in accordance with ASTM C109/C109M.

A. Repair Overlayment: Cement-based, polymer-modified, self-leveling product that can be applied in thicknesses from 1/4 inch and that can be filled in over a scarified surface to match adjacent floor elevations.

1. Cement Binder: ASTM C150/C150M portland cement or hydraulic or blended hydraulic cement, as defined in ASTM C219.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 8

2. Primer: Product of topping manufacturer recommended for substrate, conditions, and application.

3. Aggregate: Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommended by topping manufacturer.

4. Compressive Strength: Not less than 5000 psi at 28 days when tested in accordance with ASTM C109/C109M.

4.2 CONCRETE MIXTURE MATERIALS

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.

1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland or hydraulic cement in concrete assigned to Exposure Class F3 as follows:

1. Fly Ash or Other Pozzolans: 25 percent by mass.

2. Slag Cement: 50 percent by mass.

3. Silica Fume: 10 percent by mass.

4. Total of Fly Ash or Other Pozzolans, Slag Cement, and Silica Fume: 50 percent by mass, with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

5. Total of Fly Ash or Other Pozzolans and Silica Fume: 35 percent by mass with fly ash or pozzolans not exceeding 25 percent by mass and silica fume not exceeding 10 percent by mass.

C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.

1. Use corrosion-inhibiting admixture in concrete mixtures where indicated.

2. Use permeability-reducing admixture in concrete mixtures where indicated.

D. Color Pigment: Add color pigment to concrete mixture in accordance with manufacturer's written instructions and to result in hardened concrete color consistent with approved mockup.

4.3 CONCRETE MIXTURE CLASS TYPES

A. Class A: Normal-weight concrete used for footings, grade beams, and tie beams.

1. Exposure Class: ACI 318 Class F0.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 9

2. Minimum Compressive Strength: 5000 psi at 28 days.

3. Maximum w/cm Ratio: 0.45.

4. Slump Limit: 5 inches, plus or minus 1-1/2 inches for concrete.

5. Air Content:

6. Compressive strength or alternative methods of estimating in-place strength of concrete by maturity or other nondestructive testing with acceptable correlation between test results and concrete compressive strength.

B. Class B: Normal-weight concrete used for foundation walls.

1. Air Content:

C. Class C: Normal-weight concrete used for interior slabs-on-ground.

1. Exposure Class: ACI 318 Class F0.

2. Minimum Compressive Strength: 5000 psi at 28 days.

3. Maximum w/cm Ratio : 0.45.

4. Slump Limit: 5 inches, plus or minus 1.5 inches for concrete.

5. Steel-Fiber Reinforcement: Add to concrete mixture, in accordance with manufacturer's written instructions, at a rate of 50 lb/cu. yd..

6. Synthetic Macrofiber: Uniformly disperse in concrete mixture at manufacturer's recommended rate, but not less than a rate of

4.0 lb/cu. yd..

D. Class D: Normal-weight concrete used for interior suspended slabs.

1. Exposure Class: ACI 318 Class F0.

2. Minimum Compressive Strength: 5000 psi at 28 days.

3. Maximum w/cm Ratio: 0.45.

4. Slump Limit: 5 inches, plus or minus 1.5 inches for concrete.

5. Air Content:

a. Total air content must not exceed 3 percent for concrete used in trowel-finished floors.

6. Steel-Fiber Reinforcement: Add to concrete mixture, in accordance with manufacturer's written instructions, at a rate of 50 lb/cu. yd..

7. Synthetic Microfiber: Uniformly disperse in concrete mixture at manufacturer's recommended rate, but not less than a rate of

1.0 lb/cu. yd..

8. Synthetic Macrofiber: Uniformly disperse in concrete mixture at manufacturer's recommended rate, but not less than a rate of

4.0 lb/cu. yd..

4.4 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M and furnish delivery ticket.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 10

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete in accordance with ASTM C94/C94M. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than five minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd..

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.

PART 3 -EXECUTION

3.1 EXAMINATION

A. Verification of Conditions:

1. Before placing concrete, verify that installation of concrete forms, accessories, reinforcement, and embedded items is complete and that required inspections have been performed.

2. Do not proceed until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:

1. Daily access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.

4. Security and protection for test samples and for testing and inspection equipment at Project site.

3.3 TOLERANCES

A. Comply with ACI 117.

3.4 INSTALLATION OF EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 11

1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

2. Install reglets to receive waterproofing and through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

3.5 INSTALLATION OF CAST-IN-PLACE CONCRETE

A. Before placing concrete, verify that installation of formwork, reinforcement, embedded items, and vapor retarder is complete and that required inspections are completed.

1. Immediately prior to concrete placement, inspect vapor retarder for damage and deficient installation, and repair defective areas.

2. Provide continuous inspection of vapor retarder during concrete placement and make necessary repairs to damaged areas as Work progresses.

B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.

C. Water addition in transit or at the Project site must be in accordance with ASTM C94/C94M and must not exceed the permitted amount indicated on the concrete delivery ticket.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.

1. If a section cannot be placed continuously, provide construction joints as indicated.

2. Deposit concrete to avoid segregation.

3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.

4. Consolidate placed concrete with mechanical vibrating equipment in accordance with ACI 301.

a. Do not use vibrators to transport concrete inside forms.

b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.

c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.

d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 12

E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

1. Do not place concrete floors and slabs in a checkerboard sequence.

2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

3. Maintain reinforcement in position on chairs during concrete placement.

4. Screed slab surfaces with a straightedge and strike off to correct elevations.

5. Level concrete, cut high areas, and fill low areas.

6. Slope surfaces uniformly to drains where required.

7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.

8. Do not further disturb slab surfaces before starting finishing operations.

3.6 INSTALLATION OF JOINTS

A. Construct joints true to line, with faces perpendicular to surface plane of concrete.

B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.

1. Install so strength and appearance of concrete are not impaired, at locations indicated on Drawings or as approved by Architect.

2. Place joints perpendicular to main reinforcement.

a. Continue reinforcement across construction joints unless otherwise indicated.

3. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete.

4. Locate joints for beams, slabs, joists, and girders at third points of spans.

Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.

5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.

6. Space vertical joints in walls as indicated on Drawings. Unless otherwise indicated on Drawings, locate vertical joints beside piers integral with walls, near corners, and in concealed locations where possible.

7. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

8. Use epoxy-bonding adhesive at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 13

C. Control Joints in Slabs-on-Ground: Form weakened-plane control joints, sectioning concrete into areas as indicated. Construct control joints for a depth equal to at least one-fourth of concrete thickness as follows:

1. Grooved Joints: Form control joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of control joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.

2. Sawed Joints: Form control joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random cracks.

D. Isolation Joints in Slabs-on-Ground: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated on Drawings.

2. Terminate full-width joint-filler strips not less than 1/2 inch or more than 1 inch below finished concrete surface, where joint sealants, specified in Section 079200 "Joint Sealants," are indicated.

3. Install joint-filler strips in lengths as long as practicable. Where more than one length is required, lace or clip sections together.

E. Doweled Joints:

1. Install dowel bars and support assemblies at joints where indicated on Drawings.

2. Lubricate or asphalt coat one-half of dowel bar length to prevent concrete bonding to one side of joint.

F. Dowel Plates: Install dowel plates at joints where indicated on Drawings.

3.7 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS

A. Filling in:

1. Fill in holes and openings left in concrete structures after Work of other trades is in place unless otherwise indicated.

2. Mix, place, and cure concrete, as specified, to match color and texture with in-place construction exposed to view.

3. Provide other miscellaneous concrete filling indicated or required to complete the Work.

B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 14

C. Equipment Bases and Foundations:

1. Coordinate sizes and locations of concrete bases with actual equipment provided.

2. Construct concrete bases 8 inches high unless otherwise indicated on Drawings, and extend base not less than 6 inches in each direction beyond the maximum dimensions of supported equipment unless otherwise indicated on Drawings, or unless required for seismic anchor support.

3. Minimum Compressive Strength: 5000 psi at 28 days.

4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of concrete base.

5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base and anchor into structural concrete substrate.

6. Prior to pouring concrete, place and secure anchorage devices.

a. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

b. Cast anchor-bolt insert into bases.

c. Install anchor bolts to elevations required for proper attachment to supported equipment.

D. Steel Pan Stairs: Provide concrete fill for steel pan stair treads, landings, and associated items.

1. Cast-in inserts and accessories, as shown on Drawings.

2. Screed, tamp, and trowel finish concrete surfaces.

3.8 APPLICATION OF CONCRETE CURING

A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

1. Comply with ACI 301 for cold weather protection during curing.

2. Comply with ACI 301 and ACI 305.1 for hot-weather protection during curing.

3. Maintain moisture loss no more than 0.2 lb/sq. ft. x h, calculated in accordance with ACI 305R, before and during finishing operations.

B. Curing Formed Surfaces: Comply with ACI 308.1 as follows:

1. Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces.

2. Cure concrete containing color pigments in accordance with color pigment manufacturer's instructions.

3. If forms remain during curing period, moist cure after loosening forms.

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 15

4. If removing forms before end of curing period, continue curing for remainder of curing period as follows:

a. Continuous Fogging: Maintain standing water on concrete surface until final setting of concrete.

b. Continuous Sprinkling: Maintain concrete surface continuously wet.

c. Absorptive Cover: Pre-dampen absorptive material before application; apply additional water to absorptive material to maintain concrete surface continuously wet.

d. Water-Retention Sheeting Materials: Cover exposed concrete surfaces with sheeting material, taping, or lapping seams.

e. Membrane-Forming Curing Compound: Apply uniformly in continuous operation by power spray or roller in accordance with manufacturer's written instructions.

1) Recoat areas subject to heavy rainfall within three hours after initial application.

2) Maintain continuity of coating and repair damage during curing period.

C. Curing Unformed Surfaces: Comply with ACI 308.1 as follows:

1. Begin curing after finishing concrete.

2. Interior Concrete Floors:

a. Floors to Receive Floor Coverings Specified in Other Sections:

Contractor has option of the following:

1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.

a) Lap edges and ends of absorptive cover not less than 12 inches.

b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.

2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.

a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.

b) Cure for not less than seven days.

3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following not in cold weather:

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 16

b) Continuous water-fog spray.

b. Floors to Receive Penetrating Liquid Floor Treatments: Contractor has option of the following:

1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.

a) Lap edges and ends of absorptive cover not less than 12 inches.

b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.

2) Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.

a) Immediately repair any holes or tears during curing period, using cover material and waterproof tape.

b) Cure for not less than seven days.

3) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:

a) Water.

b) Continuous water-fog spray.

c. Floors to Receive Polished Finish: Contractor has option of the following:

1) Absorptive Cover: As soon as concrete has sufficient set to permit application without marring concrete surface, install prewetted absorptive cover over entire area of floor.

a) Lap edges and ends of absorptive cover not less than 12 inches.

b) Maintain absorptive cover water saturated, and in place, for duration of curing period, but not less than seven days.

2) Ponding or Continuous Sprinkling of Water: Maintain concrete surfaces continuously wet for not less than seven days, utilizing one, or a combination of, the following:

CITY OF NORTH MIAMI BEACH

PUBLIC LIBRARY-

RESTROOM REMODEL

CAST-IN-PLACE CONCRETE 03 30 00 - 17

b) Continuous water-fog spray.

d. Floors To Receive Chemical Stain:

1) As soon as concrete has sufficient set to permit application without marring concrete surface, install curing paper over entire area of floor.

2) Install curing paper square to building lines, without wrinkles, and in a single length without end joints.

3) Butt sides of curing paper…