This document provides details on a federal contract opportunity for bridge construction services. The Department of Transportation Federal Highway Administration is soliciting bids under solicitation number 6982AF23B000032 for work on the NM FS 141(1) South Fork Negrito Creek Bridge. Bids are due by the date specified in the 20MB plan file NM FS 141(1) Plan flat.pdf, which contains additional technical requirements for replacing the bridge. Contract award will go to the responsible bidder offering the lowest price. Only domestic small businesses are eligible to compete. The selected contractor will be responsible for all aspects of bridge design, permitting, construction and inspection to bring the bridge into a state of good repair.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA 9.27.23.pdf | ||
| 6982AF23B000032.pdf | ||
| NM FS 141(1) S. Fork Negrito Bridge - Pavement V1 Tech Memo - Final.pdf | ||
| FP-14_Eng.pdf | ||
| Draft Geotechnical Investigations Report Negrito.pdf | ||
| NM FS 141(1) Borrow Pits.pdf | ||
| As-built Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R
SCOTT
Digitally signed by CURTIS R SCOTT Date: 2023.08.29 09:02:13 -06'00'
Sheet and Description
B3 B4 S2
Grading and Surfacing
Summaries
Miscellaneous Summaries
General Notes &
Estimates Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0060 15225-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING CONTROL MILE 0.071 0.071
A0080 15236-2000 SURVEY CONTROL, GRADE
FINISHING MILE 0.109 0.109
A0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0120 15401-0000 CONTRACTOR TESTING LPSM ALL
A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0160 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.48 0.07 0.55
A0200 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0220 20310-1000 PLUG, EXISTING PIPE EACH 1 1
A0240 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,475 75 1,550
A0260 20801-0000 STRUCTURE EXCAVATION CUYD 100 100 Contract Quantity
A0280 20803-0000 STRUCTURAL BACKFILL CUYD 40 40 Contract Quantity
A0300 25101-2400 PLACED RIPRAP, METHOD B,
CLASS 4 CUYD 290 290
A0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 517 33 550
A0340 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 138 14 152
A0360 41201-0000 TACK COAT TON 0.46 0.04 0.50
A0380 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 44 44
A0400 55401-1000 REINFORCING STEEL LB 4,600 4,600 Contract Quantity
A0420 55504-0000 PRE-FABRICATED STEEL BRIDGE
(26'x78') LPSM All ALL
A0440 56501-0200 DRILLED SHAFT, 24-INCH
DIAMETER LNFT 142 142
A0460 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A WOOD POSTS LNFT 25 25
A0480 61702-1500 TERMINAL SECTION, TYPE MGS
TANGENT EACH 4 4
A0500 61707-0000 STRUCTURE TRANSITION RAILING LNFT 50 50 Contract Quantity
A0520 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 10
A0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 10
MileStone: 100% Estimate Date Completed: 06/06/23 Report Date: 06/06/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-J un
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
N
N M
\1
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
Su m m ar yo fQ ua nt iti es _N
M _1
(1
.x ls m
]S he et
STATE PROJECT
B1NM 141(1)
S. FORK NEGRITO CR BRNM
SHEET
NUMBER
Sheet and Description
B3 B4 S2
Grading and Surfacing
Summaries
Miscellaneous Summaries
General Notes &
Estimates Allowance Bid
Schedule
A0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 10
A0580 62201-2750 MOTOR GRADER HOUR 10
A0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 10
A0620 62301-0000 GENERAL LABOR HOUR 20
A0640 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A0660 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.38 0.07 0.45
A0680 62510-1000 SEEDING, DRY METHOD ACRE 0.38 0.07 0.45
A0700 62515-1000 MULCHING, DRY METHOD ACRE 0.38 0.07 0.45
A0720 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0740 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
-J un -2
1:
P M
MileStone: 100% Estimate Date Completed: 06/06/23 Report Date: 06/06/23
N
N M
\1
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
Su m m ar yo fQ ua nt iti es _N
M _1
(1
.x ls m
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B2NM 141(1)
S. FORK NEGRITO CR BRNM
SHEET
NUMBER
File details come from the government source that posted it. Updated .