About this file

This is a set of asbestos abatement construction documents prepared for Northeastern Junior College in Sterling, Colorado, specifically for the Phillips-Wyman Hall windows replacement project. The project scope involves the removal of asbestos-containing materials (ACM) including windows with asbestos-containing caulking and glazing compound, and asbestos-containing transite panels located on the first and second floors of the facility. The work is identified across four drawing sheets dated April 12, 2018, with project number 17071, prepared by RLH Engineering, Inc. The contractor must perform only those items designated within the asbestos abatement scope and coordinate work to accommodate ongoing educational activities and other contractors operating at the site. The contractor is responsible for verifying all quantities and existing conditions and must immediately notify the owner's representative of any discrepancies between site conditions, drawings, and specifications.

The contractor must supply weekly updated schedules, hold weekly progress meetings with documented minutes, and provide all necessary electrical equipment meeting work requirements. Personnel decontamination units shall utilize available water, power, and drainage facilities, with hoses and cords properly managed to prevent hazards in occupied and pedestrian areas. All HEPA-filtered vacuums must arrive clean and equipped with new filters installed on-site in the presence of the owner's representative. The contractor assumes responsibility for protecting existing finishes, electrical systems, casework, floor finishes, pavement, and other building components, with all repairs to be completed within seven days of each phase completion. Items to be decontaminated and returned for reinstallation must remain in the work area or a secondary enclosure staging area for visual inspection and final air clearance. The contractor's disposal trailer must be lined with 6-mil polyethylene and remain closed and locked except during active waste loading, with proper warning placards displayed at all times.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N O

R

TH

EA

ST

ER

N

JU

N

IO

R

C O

LL

EG

E

ST

ER

LI

N

G , C

O

LO

R A

D O

LA

N D

R U

M L

A N

E

PH

IL

LI

PS

W Y

M A

N H

A

LL

DRAWING #: 1

SHEET TITLE: ASBESTOS

COVER SHEET

RLH Project #: 17071

DATE: APRIL 12, 2018

CAD File:...\17071\CAD\

PHILLIPS WYMAN HALL_CD.DWG

A

SB

ES

TO

S A

B A

TE

M

EN

T

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o

O ff ic e (9

) 6

-5

Fa x

(9

) 6

-5 en gi ne er in g, in c.

Fa ci lit y

Pl an ni ng

, E ng in ee ri ng

E nv ir on m en ta l S er vi ce s*

GENERAL NOTES

ASBESTOS ABATEMENT WORK IS IDENTIFIED BY THE CONSTRUCTION DOCUMENTS FOR ASBESTOS

ABATEMENT, GENERAL ASBESTOS ABATEMENT NOTES, THE ASBESTOS ABATEMENT LEGEND AND

KEYED NOTES.

1. THE ASBESTOS ABATEMENT WORK FOR NORTHEASERN JUNIO COLLEGE PHILLIPS-WHYMAN

WINDOWS REPLACEMENT IS SHOWN ON DRAWING SHEETS 1-3, DATED APRIL 12, 2018. THE

WORK DESCRIBED IS THE SCOPE OF WORK FOR THE BASE BID THE CONTRACTOR SHALL

PERFORM ONLY THOSE ITEMS WHICH ARE SHOWN TO BE PART OF THE ASBESTOS ABATEMENT

SCOPE OF WORK.

2. WORK OF THIS ABATEMENT PROJECT IS SCHEDULED TO ACCOMMODATE EDUCATIONAL

ACTIVITIES AND WORK BY OTHER CONTRACTORS. THE CONTRACTOR SHALL COOPERATE WITH

THE OWNER, OWNER'S GENERAL CONTRACTOR, OTHER CONTRACTORS AND BUILDING

OCCUPANTS TO ALLOW OTHER SCHEDULED ACTIVITIES WHILE THE WORK OF THIS CONTRACT

IS BEING PERFORMED. THE GENERAL SEQUENCE OF THE WORK IS DESCRIBED IN SECTION

01013 OF THE SPECIFICATIONS.

3. WATER, POWER, AND DRAINAGE FACILITIES ARE AVAILABLE AT OR NEAR THE LOCATIONS

APPROVED FOR THE PERSONNEL DECONTAMINATION UNITS. WATER SUPPLY AND DRAINAGE

HOSES THAT MUST BE ROUTED THROUGH OCCUPIED SPACES OR PEDESTRIAN AREAS SHALL

BE PROPERLY DRAINED AND REMOVED FROM THESE AREAS AT THE END OF EACH SHIFT.

POWER SUPPLY CORDS SHALL BE ROUTED OR SUSPENDED SUCH THAT THEY DO NOT

PRESENT A TRIP HAZARD IN PEDESTRIAN AREAS.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL QUANTITIES AND

EXISTING CONDITIONS ARE ACCURATELY REFLECTED IN THE DRAWINGS AND SPECIFICATIONS.

THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY

DISCREPANCIES BETWEEN SITE CONDITIONS, DRAWINGS, AND SPECIFICATIONS.

5. ALL HEPA-FILTERED VACUUMS DELIVERED TO THE SITE FOR USE ON THE PROJECT SHALL BE

DELIVERED CLEAN AND FREE OF ASBESTOS WASTE AND DEBRIS. HEPA-FILTERED VACUUMS

SHALL BE FITTED WITH A NEW HEPA FILTER AT THE PROJECT SITE, IN THE PRESENCE OF THE

OWNER'S REPRESENTATIVE.

6. THE CONTRACTOR SHALL SUPPLY, ON A WEEKLY BASIS, AN UPDATED SCHEDULE SHOWING

PROGRESS FOR COMPLETION DATES. THE CONTRACTOR SHALL HOLD WEEKLY PROGRESS

MEETINGS, PROVIDE MEETING MINUTES, AND DISTRIBUTE AT A MINIMUM TWO DAYS PRIOR TO

THE NEXT MEETING.

7. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT FOR ALL ELECTRICAL POWER

AT THE PROJECT SITE. THE ELECTRICAL EQUIPMENT TO BE PROVIDED MUST MEET THE WORK

REQUIREMENTS. THE CONTRACTOR SHALL ARRANGE TO HAVE THE ELECTRICAL EQUIPMENT

ON SITE IN A TIMELY FASHION FOR CONNECTION TO THE OWNER'S ELECTRICAL SYSTEM BY

THE GENERAL CONTRACTOR'S ELECTRICAL SUBCONTRACTOR. THE

CONTRACTOR/SUBCONTRACTOR SHALL COORDINATE CONNECTION WITH THE OWNER'S

ELECTRICAL TRADE SHOP.

8. THE CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR FOR

DE-ENERGIZING ELECTRICAL CIRCUITS WITHIN ABATEMENT WORK AREAS. ALL ELECTRICAL

LOCK-OUT/TAG-OUT IS THE RESPONSIBILITY OF THE ABATEMENT CONTRACTOR, BUT SHALL BE

COORDINATED WITH THE GENERAL CONTRACTOR. NO ELECTRICAL DEMOLITION SHALL

COMMENCE UNTIL PROPER LOCK-OUT/TAG-OUT PROCEDURES ARE CONDUCTED.

9. THE CONTRACTOR'S ACM DISPOSAL TRAILER SHALL BE EMPTY OF ASBESTOS CONTAINING

WASTE MATERIAL (ACWM) AND NON-ACM DEBRIS FROM ANY OTHER PROJECT AND MUST BE

LINED WITH 6-MIL POLY BEFORE STARTING WASTE LOAD-OUT. WITH THE EXCEPTION OF

ACTIVE WASTE LOAD-OUT, THE CONTRACTOR'S DISPOSAL TRAILER SHALL REMAIN CLOSED

AND LOCKED AT ALL TIMES. PROPER WARNING PLACARDS SHALL BE DISPLAYED ON WASTE

DUMPSTERS AT ALL TIMES.

10. THE OWNER SHALL BE RESPONSIBLE FOR MOVING ALL LOOSE ITEMS, INCLUDING SOME ITEMS

ATTACHED TO THE WALLS, AND LOOSE FURNISHINGS, FROM THE WORK AREAS PRIOR TO THE

START OF ANY ABATEMENT WORK. ITEMS REMAINING AT THE START OF ABATEMENT AND NOT

SPECIFICALLY IDENTIFIED FOR SALVAGE SHALL BE REMOVED BY THE CONTRACTOR AND

DISPOSED OF AS GENERAL CONSTRUCTION DEBRIS. VERIFY WITH OWNER'S REPRESENTATIVE

PRIOR TO REMOVAL/DISPOSAL.

11. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT EXISTING FINISHES FROM

ABATEMENT AND DEMOLITION OPERATIONS. THE CONTRACTOR WILL BE RESPONSIBLE TO

REPAIR AND REPAINT FINISHES IF DAMAGE OCCURS AS A RESULT OF WORK PERFORMED

UNDER THIS PROJECT. THE CONTRACTOR SHALL PATCH DAMAGED WALLS AS SPECIFIED. ALL

REPAIRS WILL BE COMPLETED WITH WITHIN SEVEN DAYS OF EACH PHASE COMPLETION DATE.

THE OWNER WILL SUPPLY THE CONTRACTOR WITH PAINT CODES FOR EXISTING FINISHES.

12. THE CONTRACTOR SHALL PROTECT IN PLACE ALL WIRING, ELECTRICAL CONDUIT, TELEPHONE, COMPUTER, DATA, SECURITY, FIRE DETECTION CABLES, AND MECHANICAL CONTROLS DURING

ABATEMENT. CONTRACTOR SHALL PROPERLY CLEAN AND LEAVE IN PLACE UNLESS

OTHERWISE IDENTIFIED. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR COST ACCRUED TO

THE OWNER FOR THE REPAIR/REPLACEMENT OF SUCH ITEMS. ALL EXISTING ITEMS/SYSTEMS

MENTIONED ABOVE ARE CURRENTLY IN GOOD WORKING CONDITION AND WILL BE RETURNED

TO THE OWNER IN THE SAME CONDITION.

13. THE CONTRACTOR SHALL PROTECT IN PLACE ALL CASEWORK, CABINETS, SINKS, EXHAUST

HOODS, CHALKBOARDS, COAT RACKS, TV'S, TV BRACKETS, FLAG HOLDERS OR ANY OTHER

ITEMS NOT SPECIFICALLY ADDRESSED AS DEMOLITION ITEMS IN THE WORK AREA. THE

CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE MATERIALS OR ITEMS THAT ARE DAMAGED

OR MISSING AS A RESULT OF WORK OF THIS CONTRACT.

14. UNLESS OTHERWISE IDENTIFIED, THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN

PLACE ALL FLOOR FINISHES FROM ABATEMENT AND DEMOLITION OPERATIONS. THE

CONTRACTOR WILL BE RESPONSIBLE TO REPLACE/REPAIR FLOORING THAT IS DAMAGED AS A

RESULT OF WORK PERFORMED UNDER THIS PROJECT. REPAIRS/REPLACEMENT MUST BE

COMPLETE PRIOR TO THE OWNER RE-OCCUPYING THE BUILDING.

15. THE CONTRACTOR SHALL PROVIDE PROTECTION FOR AND/OR REPLACE PAVEMENT,

CONCRETE, IRRIGATION SYSTEM, AND SOD DAMAGED FROM WORK OF THIS CONTRACT.

CONTRACTOR SHALL VERIFY TO OWNER ANY EXISTING DAMAGE PRIOR TO MOBILIZATION AND

START OF WORK.

16. FOR ITEMS AND DEVICES NOTED IN THE ABATEMENT SCOPE TO BE DECONTAMINATED AND

RETURNED TO THE OWNER/GENERAL CONTRACTOR FOR REINSTALLATION, THESE ITEMS

SHALL BE DECONTAMINATED AND REMAIN IN THE ABATEMENT WORK AREA FOR VISUAL

INSPECTION AND FINAL AIR CLEARANCES. ALTERNATIVELY, THE ITEMS MAY BE

DECONTAMINATED AND TRANSPORTED TO A STAGING AREA THAT IS ESTABLISHED UNDER

SECONDARY ENCLOSURE CONTROLS, WHERE A FINAL VISUAL INSPECTION AND FINAL AIR

CLEARANCE WILL BE CONDUCTED. ALL ITEMS SHALL BE PROTECTED FROM VISIBLE AND

FUNCTIONAL DAMAGE.

17. FOR WORK ON THE ROOF OF THE FACILITY, THE CONTRACTOR SHALL TAKE ADEQUATE

PRECAUTIONS TO PROTECT THE ROOF. IN AREAS OF HEAVY USE, INCLUDING WORK AREA

EXTENSIONS FOR DECON/LOADOUT OR STAGING AREAS, THE CONTRACTOR SHALL PLACE

PLYWOOD OR OTHER RESILIENT SHEET MATERIAL (MINIMUM ½” THICK). FOR AREAS OF HEAVY

FOOT TRAFFIC, THINNER RESILIENT SHEET MATERIAL, SUCH AS MASONITE, MAY BE UTILIZED.

THE ROOF SHALL REMAIN FREE OF ALL TRASH AND DEBRIS DURING THE WORK.

THIS SYMBOL INDICATES THE APPROXIMATE LOCATION OF WINDOWS/PANEL FRAMES WITH

ASBESTOS CONTAINING CAULKING AND GLAZING COMPOUND TO BE REMOVED. WINDOWS/PANEL

FRAMES SHALL BE REMOVED AS COMPONENTS (INCLUDING BLINDS, LOUVRES, SECURITY SCREENS, AS NOTED) USING NON-FRIABLE REMOVAL METHODS. OSHA REGULATED AREA CONTROLS CAN BE

UTILIZED IN LIEU OF SECONDARY ENCLOSURE ENGINEERING CONTROLS, AS LONG AS THE

ASBESTOS CONTAINING MATERIAL REMAINS NON-FRIABLE (REMOVAL BY NON-POWERED HAND

TOOLS ONLY). REMOVAL OF CAULKING FROM ADJACENT BRICK FACES MAY REQUIRE MINOR

CHIPPING OF BRICK AND MORTAR. CHIPPING OF BRICK AND MORTAR SHALL EXTEND NO FURTHER

THAN 1/4” FROM THE CAULK BEAD LOCATION. UPON WINDOW REMOVAL, CONTRACTOR TO PROVIDE

TEMPORARY FRAMING AND ½” OSB SHEATHING TO COVER WINDOW OPENINGS FOR SECURITY AND

WEATHER.

THIS SYMBOL INDICATES THE APPROXIMATE LOCATION OF ASBESTOS CONTAINING TRANSITE

PANELS TO BE REMOVED. TRANSITE PANELS SHALL BE REMOVED INTACT BY REMOVING

SCREWS/ALUMINUM STAYS FROM WINDOW FRAME, ALLOWING PANELS TO BE REMOVED IN

ENTIRETY. TRANSITE PANELS CAN BE REMOVED WITH WINDOW FRAME COMPONENTS AS LONG AS

TRANSITE PANELS REMAIN INTACT. OSHA REGULATED AREA CONTROLS CAN BE UTILIZED IN LIEU OF

SECONDARY ENCLOSURE ENGINEERING CONTROLS, AS LONG AS THE ASBESTOS CONTAINING

MATERIAL REMAINS NON-FRIABLE (REMOVAL BY NON-POWERED HAND TOOLS ONLY). UPON

WINDOW REMOVAL, CONTRACTOR TO PROVIDE TEMPORARY FRAMING AND ½” OSB SHEATHING TO

COVER WINDOW OPENINGS FOR SECURITY AND WEATHER.

LEGEND

PROJECT DIRECTORY

OWNER:

NORTHEASTERN JUNIOR COLLEGE

100 COLLEGE AVE.

STERLING, CO 80751

OWNER'S REP / ENV.CONSULTANT:

RLH ENGINEERING, INC.

541 EAST GARDEN DRIVE

WINDSOR, COLORADO 80550

JEFF KIRTLEY, SR. PROJECT MANAGER

303-210-1326

PROJECT SITES:

PHILIPS-WHYMAN HALL

NORTHEASTERN JUNIOR COLLEGE

701 LANDRUM LANE

STERLING, CO 80751

DRAWING INDEX

SHEET# NAME

1 COVER SHEET

2 FIRST FLOOR PLAN

3 SECOND FLOOR PLAN

4 ELEVATIONS

PHILLIPS WYMAN HALL

AutoCAD SHX Text Monica

AutoCAD SHX Text

4/17/2018 8:52 AM

AutoCAD SHX Text Phillips wyman hall_cd.dwg

R

TH

EA

ST

ER

N

JU

N

IO

R

C O

LL

EG

E

ST

ER

LI

N

G , C

O

LO

R A

D O

LA

N D

R U

M L

A N

E

PH

IL

LI

PS

W Y

M A

N H

A

LL

DRAWING #: 2

SHEET TITLE: FIRST LEVEL

FLOOR PLAN

RLH Project #: 17071

DATE: APRIL 12, 2018

CAD File:...\17071\CAD\

PHILLIPS WYMAN HALL_CD.DWG

A

SB

ES

TO

S A

B A

TE

M

EN

T

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o

O ff ic e (9

) 6

-5

Fa x

(9

) 6

-5 en gi ne er in g, in c.

Fa ci lit y

Pl an ni ng

, E ng in ee ri ng

E nv ir on m en ta l S er vi ce s

FIRST LEVEL FLOOR PLAN

SCALE: 1/8"=1'-0" on 24" x 36" paper

AutoCAD SHX Text

513 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 26E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

143 SQ. FT.

AutoCAD SHX Text 26D

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

108 SQ. FT.

AutoCAD SHX Text

96 SQ. FT.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 26F

AutoCAD SHX Text

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

332 SQ. FT.

AutoCAD SHX Text

576 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

HALLWAY

AutoCAD SHX Text

839 SQ. FT.

AutoCAD SHX Text 26C

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

108 SQ. FT.

AutoCAD SHX Text 26B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

143 SQ. FT.

AutoCAD SHX Text

568 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

96 SQ. FT.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 26A

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

HALLWAY

AutoCAD SHX Text

739 SQ. FT.

AutoCAD SHX Text

577 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

577 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

210 SQ. FT.

AutoCAD SHX Text

MENS

AutoCAD SHX Text

210 SQ. FT.

AutoCAD SHX Text

171 SQ. FT.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

1577 SQ. FT.

AutoCAD SHX Text

413 SQ. FT.

AutoCAD SHX Text

BOILER RM.

AutoCAD SHX Text

915 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

876 SQ. FT.

AutoCAD SHX Text

COMPUTER LAB

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

876 SQ. FT.

AutoCAD SHX Text

143 SQ. FT.

AutoCAD SHX Text

ENTRY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UCOPY ROOM

AutoCAD SHX Text

120 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

%%USTORAGE

AutoCAD SHX Text

120 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

563 SQ. FT.

AutoCAD SHX Text

323 SQ. FT.

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

324 SQ. FT.

AutoCAD SHX Text 17A

AutoCAD SHX Text

%%UOFFICE

AutoCAD SHX Text

120 SQ. FT.

AutoCAD SHX Text

134 SQ. FT.

AutoCAD SHX Text 17B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

295 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

819 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

819 SQ. FT.

AutoCAD SHX Text

819 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

54 SQ. FT.

AutoCAD SHX Text

JAN. CLOSET

AutoCAD SHX Text

%%UHANDICAP

AutoCAD SHX Text

56 SQ. FT.

AutoCAD SHX Text

74 SQ. FT.

AutoCAD SHX Text

%%UCLOSET

AutoCAD SHX Text

47 SQ. FT

AutoCAD SHX Text

UP

AutoCAD SHX Text %%uELEV.

AutoCAD SHX Text

40 SQ. FT.

AutoCAD SHX Text %%uSTAIRS

AutoCAD SHX Text

322 SQ. FT

AutoCAD SHX Text %%uELEV. EQUIP.

AutoCAD SHX Text

83 SQ. FT

AutoCAD SHX Text Monica

AutoCAD SHX Text

4/17/2018 8:52 AM

R

TH

EA

ST

ER

N

JU

N

IO

R

C O

LL

EG

E

ST

ER

LI

N

G , C

O

LO

R A

D O

LA

N D

R U

M L

A N

E

PH

IL

LI

PS

W Y

M A

N H

A

LL

DRAWING #: 3

SHEET TITLE: SECOND LEVEL

FLOOR PLAN

RLH Project #: 17071

DATE: APRIL 12, 2018

CAD File:...\17071\CAD\

PHILLIPS WYMAN HALL_CD.DWG

A

SB

ES

TO

S A

B A

TE

M

EN

T

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o

O ff ic e (9

) 6

-5

Fa x

(9

) 6

-5 en gi ne er in g, in c.

Fa ci lit y

Pl an ni ng

, E ng in ee ri ng

E nv ir on m en ta l S er vi ce s

SECOND LEVEL FLOOR PLAN

SCALE: 1/8"=1'-0" on 24" x 36" paper

AutoCAD SHX Text

STAIR & LANDING

AutoCAD SHX Text

AutoCAD SHX Text

%%UCLASSROOM

AutoCAD SHX Text

322 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

%%UCLASSROOM

AutoCAD SHX Text

848 SQ. FT.

AutoCAD SHX Text

96 SQ. FT.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 214F

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

332 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text 214E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

143 SQ. FT.

AutoCAD SHX Text

108 SQ. FT.

AutoCAD SHX Text

HALLWAY

AutoCAD SHX Text

839 SQ. FT.

AutoCAD SHX Text

96 SQ. FT.

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 214A

AutoCAD SHX Text 214C

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

108 SQ. FT.

AutoCAD SHX Text 214D

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 214B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

143 SQ. FT.

AutoCAD SHX Text

577 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UCLASSROOM

AutoCAD SHX Text

1145 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

%%UOFFICE

AutoCAD SHX Text

152 SQ. FT

AutoCAD SHX Text

568 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text

210 SQ. FT.

AutoCAD SHX Text

677 SQ. FT.

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

583 SQ. FT.

AutoCAD SHX Text

DN

AutoCAD SHX Text

HALLWAY

AutoCAD SHX Text

AutoCAD SHX Text

1531 SQ. FT.

AutoCAD SHX Text

210 SQ. FT.

AutoCAD SHX Text

MENS

AutoCAD SHX Text

AutoCAD SHX Text

%%UCLASSROOM

AutoCAD SHX Text

1055 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

%%UCLASSROOM

AutoCAD SHX Text

832 SQ. FT.

AutoCAD SHX Text

617 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

PREP ROOM

AutoCAD SHX Text

1039 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

CHEMISTRY

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

219 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

%%UOFFICE

AutoCAD SHX Text

99 SQ. FT

AutoCAD SHX Text

1577 SQ. FT.

AutoCAD SHX Text

1027 SQ. FT.

AutoCAD SHX Text

CLASSROOM

AutoCAD SHX Text

AutoCAD SHX Text

208 SQ. FT.

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

%%UOFFICE

AutoCAD SHX Text

107 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

%%UOFFICE

AutoCAD SHX Text

107 SQ. FT.

AutoCAD SHX Text

AutoCAD SHX Text

HALLWAY

AutoCAD SHX Text

AutoCAD SHX Text

%%UCLASSROOM

AutoCAD SHX Text

849 SQ. FT.

AutoCAD SHX Text

235 SQ. FT.

AutoCAD SHX Text

STAIR & LANDING

AutoCAD SHX Text

DN

AutoCAD SHX Text

JAN.CLOSET

AutoCAD SHX Text

54 SQ. FT.

AutoCAD SHX Text

%%UHANDICAP

AutoCAD SHX Text

56 SQ. FT.

AutoCAD SHX Text

%%UCLOSET

AutoCAD SHX Text

32 SQ. FT.

AutoCAD SHX Text

DN

AutoCAD SHX Text %%uELEV.

AutoCAD SHX Text

40 SQ. FT.

AutoCAD SHX Text %%uELEV. EQUIP.

AutoCAD SHX Text

83 SQ. FT

AutoCAD SHX Text %%uSTAIRS

AutoCAD SHX Text

322 SQ. FT

AutoCAD SHX Text

AutoCAD SHX Text

%%UOFFICE

AutoCAD SHX Text

99 SQ. FT

AutoCAD SHX Text Monica

AutoCAD SHX Text

4/17/2018 8:52 AM

R

TH

EA

ST

ER

N

JU

N

IO

R

C O

LL

EG

E

ST

ER

LI

N

G , C

O

LO

R A

D O

LA

N D

R U

M L

A N

E

PH

IL

LI

PS

W Y

M A

N H

A

LL

DRAWING #: 4

SHEET TITLE: ELEVATIONS

RLH Project #: 17071

DATE: APRIL 12, 2018

CAD File:...\17071\CAD\

PHILLIPS WYMAN HALL_CD.DWG

A

SB

ES

TO

S A

B A

TE

M

EN

T

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o

O ff ic e (9

) 6

-5

Fa x

(9

) 6

-5 en gi ne er in g, in c.

Fa ci lit y

Pl an ni ng

, E ng in ee ri ng

E nv ir on m en ta l S er vi ce s

ELEVATION

SCALE: 1/4"=1'-0" on 24" x 36" paper

ELEVATION

SCALE: 1/4"=1'-0" on 24" x 36" paper

PROTECT BRICK IN

PLACE

REMOVE ALUMINUM

FRAMED WINDOW WITH

ACM CAULKING AND/OR

GLAZING COMPOUND

PROTECT BRICK IN PLACE

PROTECT METAL PARAPET CAP AND

SOFFIT IN PLACE

REMOVE ALUMINUM FRAMED

WINDOW PANELS WITH ACM

CAULKING OR GLAZING COMPOUND

REMOVE ACM

TRANSITE PANEL

AutoCAD SHX Text Monica

AutoCAD SHX Text

4/17/2018 8:52 AM

Sheets and Views
Phillips wyman hall_cd-COVER
Phillips wyman hall_cd-1
Phillips wyman hall_cd-2
Phillips wyman hall_cd-ELEV

File details come from the government source that posted it. Updated .