This is a set of asbestos abatement construction documents prepared for Northeastern Junior College in Sterling, Colorado, specifically for the Phillips-Wyman Hall windows replacement project. The project scope involves the removal of asbestos-containing materials (ACM) including windows with asbestos-containing caulking and glazing compound, and asbestos-containing transite panels located on the first and second floors of the facility. The work is identified across four drawing sheets dated April 12, 2018, with project number 17071, prepared by RLH Engineering, Inc. The contractor must perform only those items designated within the asbestos abatement scope and coordinate work to accommodate ongoing educational activities and other contractors operating at the site. The contractor is responsible for verifying all quantities and existing conditions and must immediately notify the owner's representative of any discrepancies between site conditions, drawings, and specifications.
The contractor must supply weekly updated schedules, hold weekly progress meetings with documented minutes, and provide all necessary electrical equipment meeting work requirements. Personnel decontamination units shall utilize available water, power, and drainage facilities, with hoses and cords properly managed to prevent hazards in occupied and pedestrian areas. All HEPA-filtered vacuums must arrive clean and equipped with new filters installed on-site in the presence of the owner's representative. The contractor assumes responsibility for protecting existing finishes, electrical systems, casework, floor finishes, pavement, and other building components, with all repairs to be completed within seven days of each phase completion. Items to be decontaminated and returned for reinstallation must remain in the work area or a secondary enclosure staging area for visual inspection and final air clearance. The contractor's disposal trailer must be lined with 6-mil polyethylene and remain closed and locked except during active waste loading, with proper warning placards displayed at all times.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O
R
TH
EA
ST
ER
N
JU
N
IO
R
C O
LL
EG
E
ST
ER
LI
N
G , C
O
LO
R A
D O
LA
N D
R U
M L
A N
E
PH
IL
LI
PS
W Y
M A
N H
A
LL
DRAWING #: 1
SHEET TITLE: ASBESTOS
COVER SHEET
RLH Project #: 17071
DATE: APRIL 12, 2018
CAD File:...\17071\CAD\
PHILLIPS WYMAN HALL_CD.DWG
A
SB
ES
TO
S A
B A
TE
M
EN
T
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o
O ff ic e (9
) 6
-5
Fa x
(9
) 6
-5 en gi ne er in g, in c.
Fa ci lit y
Pl an ni ng
, E ng in ee ri ng
E nv ir on m en ta l S er vi ce s*
GENERAL NOTES
ASBESTOS ABATEMENT WORK IS IDENTIFIED BY THE CONSTRUCTION DOCUMENTS FOR ASBESTOS
ABATEMENT, GENERAL ASBESTOS ABATEMENT NOTES, THE ASBESTOS ABATEMENT LEGEND AND
KEYED NOTES.
1. THE ASBESTOS ABATEMENT WORK FOR NORTHEASERN JUNIO COLLEGE PHILLIPS-WHYMAN
WINDOWS REPLACEMENT IS SHOWN ON DRAWING SHEETS 1-3, DATED APRIL 12, 2018. THE
WORK DESCRIBED IS THE SCOPE OF WORK FOR THE BASE BID THE CONTRACTOR SHALL
PERFORM ONLY THOSE ITEMS WHICH ARE SHOWN TO BE PART OF THE ASBESTOS ABATEMENT
SCOPE OF WORK.
2. WORK OF THIS ABATEMENT PROJECT IS SCHEDULED TO ACCOMMODATE EDUCATIONAL
ACTIVITIES AND WORK BY OTHER CONTRACTORS. THE CONTRACTOR SHALL COOPERATE WITH
THE OWNER, OWNER'S GENERAL CONTRACTOR, OTHER CONTRACTORS AND BUILDING
OCCUPANTS TO ALLOW OTHER SCHEDULED ACTIVITIES WHILE THE WORK OF THIS CONTRACT
IS BEING PERFORMED. THE GENERAL SEQUENCE OF THE WORK IS DESCRIBED IN SECTION
01013 OF THE SPECIFICATIONS.
3. WATER, POWER, AND DRAINAGE FACILITIES ARE AVAILABLE AT OR NEAR THE LOCATIONS
APPROVED FOR THE PERSONNEL DECONTAMINATION UNITS. WATER SUPPLY AND DRAINAGE
HOSES THAT MUST BE ROUTED THROUGH OCCUPIED SPACES OR PEDESTRIAN AREAS SHALL
BE PROPERLY DRAINED AND REMOVED FROM THESE AREAS AT THE END OF EACH SHIFT.
POWER SUPPLY CORDS SHALL BE ROUTED OR SUSPENDED SUCH THAT THEY DO NOT
PRESENT A TRIP HAZARD IN PEDESTRIAN AREAS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL QUANTITIES AND
EXISTING CONDITIONS ARE ACCURATELY REFLECTED IN THE DRAWINGS AND SPECIFICATIONS.
THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE OF ANY
DISCREPANCIES BETWEEN SITE CONDITIONS, DRAWINGS, AND SPECIFICATIONS.
5. ALL HEPA-FILTERED VACUUMS DELIVERED TO THE SITE FOR USE ON THE PROJECT SHALL BE
DELIVERED CLEAN AND FREE OF ASBESTOS WASTE AND DEBRIS. HEPA-FILTERED VACUUMS
SHALL BE FITTED WITH A NEW HEPA FILTER AT THE PROJECT SITE, IN THE PRESENCE OF THE
OWNER'S REPRESENTATIVE.
6. THE CONTRACTOR SHALL SUPPLY, ON A WEEKLY BASIS, AN UPDATED SCHEDULE SHOWING
PROGRESS FOR COMPLETION DATES. THE CONTRACTOR SHALL HOLD WEEKLY PROGRESS
MEETINGS, PROVIDE MEETING MINUTES, AND DISTRIBUTE AT A MINIMUM TWO DAYS PRIOR TO
THE NEXT MEETING.
7. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT FOR ALL ELECTRICAL POWER
AT THE PROJECT SITE. THE ELECTRICAL EQUIPMENT TO BE PROVIDED MUST MEET THE WORK
REQUIREMENTS. THE CONTRACTOR SHALL ARRANGE TO HAVE THE ELECTRICAL EQUIPMENT
ON SITE IN A TIMELY FASHION FOR CONNECTION TO THE OWNER'S ELECTRICAL SYSTEM BY
THE GENERAL CONTRACTOR'S ELECTRICAL SUBCONTRACTOR. THE
CONTRACTOR/SUBCONTRACTOR SHALL COORDINATE CONNECTION WITH THE OWNER'S
ELECTRICAL TRADE SHOP.
8. THE CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR FOR
DE-ENERGIZING ELECTRICAL CIRCUITS WITHIN ABATEMENT WORK AREAS. ALL ELECTRICAL
LOCK-OUT/TAG-OUT IS THE RESPONSIBILITY OF THE ABATEMENT CONTRACTOR, BUT SHALL BE
COORDINATED WITH THE GENERAL CONTRACTOR. NO ELECTRICAL DEMOLITION SHALL
COMMENCE UNTIL PROPER LOCK-OUT/TAG-OUT PROCEDURES ARE CONDUCTED.
9. THE CONTRACTOR'S ACM DISPOSAL TRAILER SHALL BE EMPTY OF ASBESTOS CONTAINING
WASTE MATERIAL (ACWM) AND NON-ACM DEBRIS FROM ANY OTHER PROJECT AND MUST BE
LINED WITH 6-MIL POLY BEFORE STARTING WASTE LOAD-OUT. WITH THE EXCEPTION OF
ACTIVE WASTE LOAD-OUT, THE CONTRACTOR'S DISPOSAL TRAILER SHALL REMAIN CLOSED
AND LOCKED AT ALL TIMES. PROPER WARNING PLACARDS SHALL BE DISPLAYED ON WASTE
DUMPSTERS AT ALL TIMES.
10. THE OWNER SHALL BE RESPONSIBLE FOR MOVING ALL LOOSE ITEMS, INCLUDING SOME ITEMS
ATTACHED TO THE WALLS, AND LOOSE FURNISHINGS, FROM THE WORK AREAS PRIOR TO THE
START OF ANY ABATEMENT WORK. ITEMS REMAINING AT THE START OF ABATEMENT AND NOT
SPECIFICALLY IDENTIFIED FOR SALVAGE SHALL BE REMOVED BY THE CONTRACTOR AND
DISPOSED OF AS GENERAL CONSTRUCTION DEBRIS. VERIFY WITH OWNER'S REPRESENTATIVE
PRIOR TO REMOVAL/DISPOSAL.
11. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT EXISTING FINISHES FROM
ABATEMENT AND DEMOLITION OPERATIONS. THE CONTRACTOR WILL BE RESPONSIBLE TO
REPAIR AND REPAINT FINISHES IF DAMAGE OCCURS AS A RESULT OF WORK PERFORMED
UNDER THIS PROJECT. THE CONTRACTOR SHALL PATCH DAMAGED WALLS AS SPECIFIED. ALL
REPAIRS WILL BE COMPLETED WITH WITHIN SEVEN DAYS OF EACH PHASE COMPLETION DATE.
THE OWNER WILL SUPPLY THE CONTRACTOR WITH PAINT CODES FOR EXISTING FINISHES.
12. THE CONTRACTOR SHALL PROTECT IN PLACE ALL WIRING, ELECTRICAL CONDUIT, TELEPHONE, COMPUTER, DATA, SECURITY, FIRE DETECTION CABLES, AND MECHANICAL CONTROLS DURING
ABATEMENT. CONTRACTOR SHALL PROPERLY CLEAN AND LEAVE IN PLACE UNLESS
OTHERWISE IDENTIFIED. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR COST ACCRUED TO
THE OWNER FOR THE REPAIR/REPLACEMENT OF SUCH ITEMS. ALL EXISTING ITEMS/SYSTEMS
MENTIONED ABOVE ARE CURRENTLY IN GOOD WORKING CONDITION AND WILL BE RETURNED
TO THE OWNER IN THE SAME CONDITION.
13. THE CONTRACTOR SHALL PROTECT IN PLACE ALL CASEWORK, CABINETS, SINKS, EXHAUST
HOODS, CHALKBOARDS, COAT RACKS, TV'S, TV BRACKETS, FLAG HOLDERS OR ANY OTHER
ITEMS NOT SPECIFICALLY ADDRESSED AS DEMOLITION ITEMS IN THE WORK AREA. THE
CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE MATERIALS OR ITEMS THAT ARE DAMAGED
OR MISSING AS A RESULT OF WORK OF THIS CONTRACT.
14. UNLESS OTHERWISE IDENTIFIED, THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT IN
PLACE ALL FLOOR FINISHES FROM ABATEMENT AND DEMOLITION OPERATIONS. THE
CONTRACTOR WILL BE RESPONSIBLE TO REPLACE/REPAIR FLOORING THAT IS DAMAGED AS A
RESULT OF WORK PERFORMED UNDER THIS PROJECT. REPAIRS/REPLACEMENT MUST BE
COMPLETE PRIOR TO THE OWNER RE-OCCUPYING THE BUILDING.
15. THE CONTRACTOR SHALL PROVIDE PROTECTION FOR AND/OR REPLACE PAVEMENT,
CONCRETE, IRRIGATION SYSTEM, AND SOD DAMAGED FROM WORK OF THIS CONTRACT.
CONTRACTOR SHALL VERIFY TO OWNER ANY EXISTING DAMAGE PRIOR TO MOBILIZATION AND
START OF WORK.
16. FOR ITEMS AND DEVICES NOTED IN THE ABATEMENT SCOPE TO BE DECONTAMINATED AND
RETURNED TO THE OWNER/GENERAL CONTRACTOR FOR REINSTALLATION, THESE ITEMS
SHALL BE DECONTAMINATED AND REMAIN IN THE ABATEMENT WORK AREA FOR VISUAL
INSPECTION AND FINAL AIR CLEARANCES. ALTERNATIVELY, THE ITEMS MAY BE
DECONTAMINATED AND TRANSPORTED TO A STAGING AREA THAT IS ESTABLISHED UNDER
SECONDARY ENCLOSURE CONTROLS, WHERE A FINAL VISUAL INSPECTION AND FINAL AIR
CLEARANCE WILL BE CONDUCTED. ALL ITEMS SHALL BE PROTECTED FROM VISIBLE AND
FUNCTIONAL DAMAGE.
17. FOR WORK ON THE ROOF OF THE FACILITY, THE CONTRACTOR SHALL TAKE ADEQUATE
PRECAUTIONS TO PROTECT THE ROOF. IN AREAS OF HEAVY USE, INCLUDING WORK AREA
EXTENSIONS FOR DECON/LOADOUT OR STAGING AREAS, THE CONTRACTOR SHALL PLACE
PLYWOOD OR OTHER RESILIENT SHEET MATERIAL (MINIMUM ½” THICK). FOR AREAS OF HEAVY
FOOT TRAFFIC, THINNER RESILIENT SHEET MATERIAL, SUCH AS MASONITE, MAY BE UTILIZED.
THE ROOF SHALL REMAIN FREE OF ALL TRASH AND DEBRIS DURING THE WORK.
THIS SYMBOL INDICATES THE APPROXIMATE LOCATION OF WINDOWS/PANEL FRAMES WITH
ASBESTOS CONTAINING CAULKING AND GLAZING COMPOUND TO BE REMOVED. WINDOWS/PANEL
FRAMES SHALL BE REMOVED AS COMPONENTS (INCLUDING BLINDS, LOUVRES, SECURITY SCREENS, AS NOTED) USING NON-FRIABLE REMOVAL METHODS. OSHA REGULATED AREA CONTROLS CAN BE
UTILIZED IN LIEU OF SECONDARY ENCLOSURE ENGINEERING CONTROLS, AS LONG AS THE
ASBESTOS CONTAINING MATERIAL REMAINS NON-FRIABLE (REMOVAL BY NON-POWERED HAND
TOOLS ONLY). REMOVAL OF CAULKING FROM ADJACENT BRICK FACES MAY REQUIRE MINOR
CHIPPING OF BRICK AND MORTAR. CHIPPING OF BRICK AND MORTAR SHALL EXTEND NO FURTHER
THAN 1/4” FROM THE CAULK BEAD LOCATION. UPON WINDOW REMOVAL, CONTRACTOR TO PROVIDE
TEMPORARY FRAMING AND ½” OSB SHEATHING TO COVER WINDOW OPENINGS FOR SECURITY AND
WEATHER.
THIS SYMBOL INDICATES THE APPROXIMATE LOCATION OF ASBESTOS CONTAINING TRANSITE
PANELS TO BE REMOVED. TRANSITE PANELS SHALL BE REMOVED INTACT BY REMOVING
SCREWS/ALUMINUM STAYS FROM WINDOW FRAME, ALLOWING PANELS TO BE REMOVED IN
ENTIRETY. TRANSITE PANELS CAN BE REMOVED WITH WINDOW FRAME COMPONENTS AS LONG AS
TRANSITE PANELS REMAIN INTACT. OSHA REGULATED AREA CONTROLS CAN BE UTILIZED IN LIEU OF
SECONDARY ENCLOSURE ENGINEERING CONTROLS, AS LONG AS THE ASBESTOS CONTAINING
MATERIAL REMAINS NON-FRIABLE (REMOVAL BY NON-POWERED HAND TOOLS ONLY). UPON
WINDOW REMOVAL, CONTRACTOR TO PROVIDE TEMPORARY FRAMING AND ½” OSB SHEATHING TO
COVER WINDOW OPENINGS FOR SECURITY AND WEATHER.
LEGEND
PROJECT DIRECTORY
OWNER:
NORTHEASTERN JUNIOR COLLEGE
100 COLLEGE AVE.
STERLING, CO 80751
OWNER'S REP / ENV.CONSULTANT:
RLH ENGINEERING, INC.
541 EAST GARDEN DRIVE
WINDSOR, COLORADO 80550
JEFF KIRTLEY, SR. PROJECT MANAGER
303-210-1326
PROJECT SITES:
PHILIPS-WHYMAN HALL
NORTHEASTERN JUNIOR COLLEGE
701 LANDRUM LANE
STERLING, CO 80751
DRAWING INDEX
SHEET# NAME
1 COVER SHEET
2 FIRST FLOOR PLAN
3 SECOND FLOOR PLAN
4 ELEVATIONS
PHILLIPS WYMAN HALL
AutoCAD SHX Text Monica
AutoCAD SHX Text
4/17/2018 8:52 AM
AutoCAD SHX Text Phillips wyman hall_cd.dwg
R
TH
EA
ST
ER
N
JU
N
IO
R
C O
LL
EG
E
ST
ER
LI
N
G , C
O
LO
R A
D O
LA
N D
R U
M L
A N
E
PH
IL
LI
PS
W Y
M A
N H
A
LL
DRAWING #: 2
SHEET TITLE: FIRST LEVEL
FLOOR PLAN
RLH Project #: 17071
DATE: APRIL 12, 2018
CAD File:...\17071\CAD\
PHILLIPS WYMAN HALL_CD.DWG
A
SB
ES
TO
S A
B A
TE
M
EN
T
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o
O ff ic e (9
) 6
-5
Fa x
(9
) 6
-5 en gi ne er in g, in c.
Fa ci lit y
Pl an ni ng
, E ng in ee ri ng
E nv ir on m en ta l S er vi ce s
FIRST LEVEL FLOOR PLAN
SCALE: 1/8"=1'-0" on 24" x 36" paper
AutoCAD SHX Text
513 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 26E
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
143 SQ. FT.
AutoCAD SHX Text 26D
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
108 SQ. FT.
AutoCAD SHX Text
96 SQ. FT.
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 26F
AutoCAD SHX Text
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text
332 SQ. FT.
AutoCAD SHX Text
576 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text
839 SQ. FT.
AutoCAD SHX Text 26C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
108 SQ. FT.
AutoCAD SHX Text 26B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
143 SQ. FT.
AutoCAD SHX Text
568 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
96 SQ. FT.
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 26A
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text
739 SQ. FT.
AutoCAD SHX Text
577 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
577 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
210 SQ. FT.
AutoCAD SHX Text
MENS
AutoCAD SHX Text
210 SQ. FT.
AutoCAD SHX Text
171 SQ. FT.
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
1577 SQ. FT.
AutoCAD SHX Text
413 SQ. FT.
AutoCAD SHX Text
BOILER RM.
AutoCAD SHX Text
915 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
876 SQ. FT.
AutoCAD SHX Text
COMPUTER LAB
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
876 SQ. FT.
AutoCAD SHX Text
143 SQ. FT.
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UCOPY ROOM
AutoCAD SHX Text
120 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text
120 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
563 SQ. FT.
AutoCAD SHX Text
323 SQ. FT.
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
324 SQ. FT.
AutoCAD SHX Text 17A
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
120 SQ. FT.
AutoCAD SHX Text
134 SQ. FT.
AutoCAD SHX Text 17B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text
295 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
819 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
819 SQ. FT.
AutoCAD SHX Text
819 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
54 SQ. FT.
AutoCAD SHX Text
JAN. CLOSET
AutoCAD SHX Text
%%UHANDICAP
AutoCAD SHX Text
56 SQ. FT.
AutoCAD SHX Text
74 SQ. FT.
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
47 SQ. FT
AutoCAD SHX Text
UP
AutoCAD SHX Text %%uELEV.
AutoCAD SHX Text
40 SQ. FT.
AutoCAD SHX Text %%uSTAIRS
AutoCAD SHX Text
322 SQ. FT
AutoCAD SHX Text %%uELEV. EQUIP.
AutoCAD SHX Text
83 SQ. FT
AutoCAD SHX Text Monica
AutoCAD SHX Text
4/17/2018 8:52 AM
R
TH
EA
ST
ER
N
JU
N
IO
R
C O
LL
EG
E
ST
ER
LI
N
G , C
O
LO
R A
D O
LA
N D
R U
M L
A N
E
PH
IL
LI
PS
W Y
M A
N H
A
LL
DRAWING #: 3
SHEET TITLE: SECOND LEVEL
FLOOR PLAN
RLH Project #: 17071
DATE: APRIL 12, 2018
CAD File:...\17071\CAD\
PHILLIPS WYMAN HALL_CD.DWG
A
SB
ES
TO
S A
B A
TE
M
EN
T
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o
O ff ic e (9
) 6
-5
Fa x
(9
) 6
-5 en gi ne er in g, in c.
Fa ci lit y
Pl an ni ng
, E ng in ee ri ng
E nv ir on m en ta l S er vi ce s
SECOND LEVEL FLOOR PLAN
SCALE: 1/8"=1'-0" on 24" x 36" paper
AutoCAD SHX Text
STAIR & LANDING
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLASSROOM
AutoCAD SHX Text
322 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLASSROOM
AutoCAD SHX Text
848 SQ. FT.
AutoCAD SHX Text
96 SQ. FT.
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 214F
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text
332 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text 214E
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
143 SQ. FT.
AutoCAD SHX Text
108 SQ. FT.
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text
839 SQ. FT.
AutoCAD SHX Text
96 SQ. FT.
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 214A
AutoCAD SHX Text 214C
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
108 SQ. FT.
AutoCAD SHX Text 214D
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 214B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
143 SQ. FT.
AutoCAD SHX Text
577 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLASSROOM
AutoCAD SHX Text
1145 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
152 SQ. FT
AutoCAD SHX Text
568 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text
210 SQ. FT.
AutoCAD SHX Text
677 SQ. FT.
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
583 SQ. FT.
AutoCAD SHX Text
DN
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text
AutoCAD SHX Text
1531 SQ. FT.
AutoCAD SHX Text
210 SQ. FT.
AutoCAD SHX Text
MENS
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLASSROOM
AutoCAD SHX Text
1055 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLASSROOM
AutoCAD SHX Text
832 SQ. FT.
AutoCAD SHX Text
617 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
PREP ROOM
AutoCAD SHX Text
1039 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
CHEMISTRY
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
219 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
99 SQ. FT
AutoCAD SHX Text
1577 SQ. FT.
AutoCAD SHX Text
1027 SQ. FT.
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
208 SQ. FT.
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
107 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
107 SQ. FT.
AutoCAD SHX Text
AutoCAD SHX Text
HALLWAY
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLASSROOM
AutoCAD SHX Text
849 SQ. FT.
AutoCAD SHX Text
235 SQ. FT.
AutoCAD SHX Text
STAIR & LANDING
AutoCAD SHX Text
DN
AutoCAD SHX Text
JAN.CLOSET
AutoCAD SHX Text
54 SQ. FT.
AutoCAD SHX Text
%%UHANDICAP
AutoCAD SHX Text
56 SQ. FT.
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
32 SQ. FT.
AutoCAD SHX Text
DN
AutoCAD SHX Text %%uELEV.
AutoCAD SHX Text
40 SQ. FT.
AutoCAD SHX Text %%uELEV. EQUIP.
AutoCAD SHX Text
83 SQ. FT
AutoCAD SHX Text %%uSTAIRS
AutoCAD SHX Text
322 SQ. FT
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
99 SQ. FT
AutoCAD SHX Text Monica
AutoCAD SHX Text
4/17/2018 8:52 AM
R
TH
EA
ST
ER
N
JU
N
IO
R
C O
LL
EG
E
ST
ER
LI
N
G , C
O
LO
R A
D O
LA
N D
R U
M L
A N
E
PH
IL
LI
PS
W Y
M A
N H
A
LL
DRAWING #: 4
SHEET TITLE: ELEVATIONS
RLH Project #: 17071
DATE: APRIL 12, 2018
CAD File:...\17071\CAD\
PHILLIPS WYMAN HALL_CD.DWG
A
SB
ES
TO
S A
B A
TE
M
EN
T
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
Ea st G ar de n D riv e, U ni t S W in ds or , C ol or ad o
O ff ic e (9
) 6
-5
Fa x
(9
) 6
-5 en gi ne er in g, in c.
Fa ci lit y
Pl an ni ng
, E ng in ee ri ng
E nv ir on m en ta l S er vi ce s
ELEVATION
SCALE: 1/4"=1'-0" on 24" x 36" paper
ELEVATION
SCALE: 1/4"=1'-0" on 24" x 36" paper
PROTECT BRICK IN
PLACE
REMOVE ALUMINUM
FRAMED WINDOW WITH
ACM CAULKING AND/OR
GLAZING COMPOUND
PROTECT BRICK IN PLACE
PROTECT METAL PARAPET CAP AND
SOFFIT IN PLACE
REMOVE ALUMINUM FRAMED
WINDOW PANELS WITH ACM
CAULKING OR GLAZING COMPOUND
REMOVE ACM
TRANSITE PANEL
AutoCAD SHX Text Monica
AutoCAD SHX Text
4/17/2018 8:52 AM
| Sheets and Views |
| Phillips wyman hall_cd-COVER |
| Phillips wyman hall_cd-1 |
| Phillips wyman hall_cd-2 |
| Phillips wyman hall_cd-ELEV |
File details come from the government source that posted it. Updated .