This document is a Lightning Protection System (LPS) Inspection Report for NIST Building 42, conducted by Lyncole XIT Grounding on December 20, 2023. The comprehensive inspection revealed multiple non-compliance issues with NFPA 780 and UL 96A standards, including ungrounded utility services, improperly secured rooftop conductors, missing air terminals, and inadequate bonding of pipes and equipment. Specific deficiencies include: the natural gas pipe not being bonded to the grounding system, no Surge Protection Device (SPD) installed on the main service entrance, water pipes not bonded, conductors with sharp bends, and rooftop equipment lacking proper lightning protection.
The report provides detailed recommendations for bringing the LPS into compliance, such as bonding utility pipes using main size conductors, installing an SPD on the main service panel, replacing secondary bonding conductors with main size conductors, adding missing air terminals, securing conductors at 3-foot intervals, and repairing/reinstalling lightning protection on various rooftop equipment. The inspection was performed by Tito Nunez of VFC Lightning Protection, with the report written by Benjamin Du of Lyncole Technical Services. The document suggests that VFC can provide a proposal to repair the existing LPS and bring it into compliance with current safety standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Lightning Protection Repair at CUP SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lyncole Project No: 202303-036 Project Name: NIST Building 42 Engineer: Benjamin Du Account Manager: Zahid Mitha Date & Revision: January 29, 2024 - Initial Release
WE ARE LIGHTNING
PROTECTION
Lightning Protection System Inspection December 20, 2023
Olgoonik Construction Division/NOAA NIST Building 42 Boulder, CO
Project # 202303-036 Lightning Protection System Inspection
January 29, 2024 - Initial Release i Lyncole XIT® Grounding
Contents
Introduction
General
Scope of Work
Observations
Utility Services
Rooftop
Summary
Recommendations
Utility Services
Rooftop
Photos
1 Lyncole XIT® Grounding
Lightning Protection System Inspection Olgoonik Construction Division/NOAA
NIST Building 42 Boulder, CO
Introduction
This report contains the results of the inspection of the Lightning Protection System (LPS) on behalf of the Olgoonik Construction Division for NIST – Building 42. This facility is located at 325 Broadway, Boulder, CO 80305. The inspection was conducted on December 20, 2023, by Tito Nunez of VFC Lightning Protection. The report was written by Benjamin Du of Lyncole Technical Services.
General
The current state of the LPS is unknown, as well as whether this system complies with the latest UL 96A & National Fire Protection Association (NFPA) 780-2023 Standards. Therefore, VFC Lightning Protection/Lyncole Technical Services was contracted to perform an LPS inspection to confirm if the existing LPS’s installation complies with latest NFPA 780 and UL 96A Standards for Lightning Protection Systems.
Scope of Work
VFC Lightning Protection/Lyncole Technical Services was contracted to perform the LPS inspection to determine if, the LPS complies with the latest UL 96A and NFPA 780 Standards and conforms to the best installation practices, identify any risks and deficiencies, and to provide recommendations for mitigations or improvements.
The Scope of Work includes the following:
• Visual inspection of the existing LPS
• Provide a list of the system’s deficiencies
• Provide recommendations to repair the system(s) to bring it/them up to present code compliant levels
2 Lyncole XIT® Grounding
Observations
The LPS inspection is based on National Fire Protection Associations (NFPA) 780, LPI, UL 96A, National Electrical Code (NEC) and other industry standards.
Utility Services
• The natural gas pipe is not bonded to the grounding system per NFPA 780 Section 4.13.4.1 (Photo 1, Rec. 1).
• No Surge Protection Device (SPD) is installed on the main service entrance per NFPA 780 Section 4.19 (Photo 2, Rec. 2).
• Both the emergency water pipe and the domestic water pipe entrances are not bonded to the grounding system per NFPA 780 Section 4.13.4.1 (Photo 3, Photo 4, Rec. 3).
• The bonding connection from the LPS to the grounding system was not visible at the Main Ground Bar (MGB) per NFPA 780 Section 4.13. Multiple grounding conductors bonded to the MGB have sharp bends, violation NFPA 780 Section 4.8.5 (Photo 5, Rec. 4).
Rooftop
• At multiple locations, the bonding conductors to the rooftop equipment and along the cross runs are not properly secured at 3 ft. intervals per NFPA 780 Section 4.9 (Photo 6, Photo 7, Rec. 5).
• The air terminals installed on the vent covers are not interconnected with an LPS conductor. The vent covers are less than 3/16 of an inch thick, violation per NFPA 780 Section 4.6.11 (Photo 8, Photo 9, Rec. 6).
• All bonding conductors bonded to the vent stacks are secondary bonding conductors.
These stacks are exposed directly to lightning strikes and should be bonded using main size conductors per NFPA 780 (Photo 10, Photo 11, Rec. 7).
• Missing two (2) air terminals on two (2) vent stacks (Photo 12, Rec. 8).
• An air terminal is missing at the corner of the building, in violation of NFPA 780 Section
4.6.2.1 (Photo 13, Rec. 9).
• The rooftop’s newly installed piping system is not protected/bonded to the LPS per NFPA 780 Section 4.15.3 (Photo 14, Photo 15, Rec. 10).
3 Lyncole XIT® Grounding
• The conductors have multiple sharp bends, in violation of NFPA 780 Section 4.8.5 (Photo 16, Photo 17, Rec. 11).
• The LPS on the AHU was removed during its last maintenance service but was never repaired/reinstalled or replaced, violation of NFPA 780 Section 4.6.12 (Photo 18, Rec. 12).
Summary
The present Lightning Protection System (LPS) is not compliant with NFPA 780 and UL 96A.
VFC can provide a proposal to repair the existing LPS and bring it into compliance with NFPA 780 and UL 96A.
4 Lyncole XIT® Grounding
Recommendations
Utility Services
Bond the natural gas pipe entrance to the nearest grounding system using a main size conductor.
Install an SPD on the main service panel. This SPD must be compliant with the UL 1449 5th Edition.
Bond the emergency water pipe entrance and the domestic water pipe entrance to the nearest grounding system using main size conductors.
Verify if the LPS is bonded to the exterior grounding system. If not, bond the LPS to the MGB using a Class I copper conductor and a main bonding plate. Repair or replace the bonding conductors on the MGB to ensure bends are greater than 90 degrees.
Rooftop
Repair/replace/install additional fasteners on the conductors to ensure all conductors are properly secured at 3 ft. intervals.
Repair the Lightning Protection Systems on the vent covers to ensure the systems are compliant with NFPA 780.
Replace all bonding conductors that are bonded to the vent stacks using main size conductors.
Replace the two (2) missing air terminals on the vent stacks.
Replace the missing air terminal at the corner of the building.
Bond the rooftop’s piping system to the LPS at 200 ft. intervals using main size conductors.
Repair the sharp bends on the conductors to ensure that all bends are greater than 90 degrees or have at least an 8 in. bend radius.
Repair/replace the LPS on the AHU.
5 Lyncole XIT® Grounding
Photos
6 Lyncole XIT® Grounding
Photo 1: Natural Gas Pipe Entrance is not Bonded
Photo 2: No SPD installed on the Main Services Entrance
7 Lyncole XIT® Grounding
Photo 3: Domestic Water Pipe is not Bonded
Photo 4: Emergency Water Pipe is not Bonded
8 Lyncole XIT® Grounding
Photo 5: LPS is not Visible on the MGB. Multiple Grounding Conductors with Sharp Bends
Photo 6: Conductors are not Secured at 3 ft. Intervals
9 Lyncole XIT® Grounding
Photo 7: Conductors are not Secured at 3 ft. Intervals
Photo 8: LPS Installed on the Vent Covers
10 Lyncole XIT® Grounding
Photo 9: LPS Installed on the Vent Covers
Photo 10: Vent Stack is Bonded using a Secondary Bonding Conductor
11 Lyncole XIT® Grounding
Photo 11: Vent Stacks are Bonded using Secondary Bonding Conductors
Photo 12: Missing Air Terminals on the Vent Stacks
12 Lyncole XIT® Grounding
Photo 13: Missing Air Terminal at the Corner of the Building
Photo 14: Ungrounded Pipes
13 Lyncole XIT® Grounding
Photo 15: Ungrounded Pipes
Photo 16: Sharp Bend on the Conductor and not Secured at 3 ft. Intervals
14 Lyncole XIT® Grounding
Photo 17: Conductor with a Sharp Bend
Photo 18: LPS was Removed from the AHU