WageDeterminations.pdf

PDF 11 KB Posted

Attached to
Paving Maintenance Services Contract at National Institutes of Health
Solicitation number
NIHOF2011358
Issued by

About this file

Davis Bacon Wage Determination

View the file

Other files

File Type Posted
PACKAGING_AND_DELIVERY_OF_PROPOSALS.pdf PDF
Paving_Solicitation.pdf PDF
Paving_Solicitation.pdf PDF
Pavement_Contract__SOW.pdf PDF
PavingPricingStructure.pdf PDF
Paving_Solicitation.pdf PDF
Pavement Contract Q A.pdf PDF
Paving_Solicitation.pdf PDF
Pavement_Contract_SOW.pdf PDF
PavingPricingStructure.pdf PDF
Pavement Brief Notes TLH 20 Apr.ppt PPT presentation
paving sign in.PDF PDF
PreProposalQA.docx DOCX document
NIHOF2011358 amend2.pdf PDF
Paving_Solicitation.pdf PDF
SummaryofRelatedActivity.pdf PDF
Sec01700TaskOrderCloseoutProcedures.pdf PDF
InvoicingInstructionsFixedPriceContracts 1 .pdf PDF
PavingPricingStructure.pdf PDF
pastperformancesurvey.pdf PDF
Sec01400QualityControl.pdf PDF
PavementContractSOW.pdf PDF
paving solicitation.pdf PDF
DisclosureofLobbyingActivities.pdf PDF
SF 1442.pdf PDF
packaging_and_delivery_of_proposal-nonrd.pdf PDF
OfferorsPointsofContact.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: MD100074 08/06/2010 MD74

Superseded General Decision Number: MD20080074

State: Maryland

Construction Type: Highway

County: Montgomery County in Maryland.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Modification Number Publication Date 0 03/12/2010 1 08/06/2010

* SUMD2010-016 01/28/2010

Rates Fringes

CARPENTER........................$ 20.60 7.96

CEMENT MASON/CONCRETE FINISHER...$ 23.30

IRONWORKER

Reinforcing & Structural....$ 26.55 14.68

LABORER

Air Tool Operator...........$ 15.56 4.33 Common/Unskilled............$ 14.52 2.56 Concrete Surfacer...........$ 13.55 2.26 Flagger.....................$ 11.06 Pipelayer...................$ 16.00 3.55

PAINTER

Painter.....................$ 22.21 6.91 Steel Bridge................$ 30.32 7.91

POWER EQUIPMENT OPERATOR:

Backhoe.....................$ 23.10 9.95+a Bobcat......................$ 22.20 10.40+a Boom Truck..................$ 19.53 3.21 Bulldozer...................$ 23.10 11.05 Gradall.....................$ 24.10 10.40+a Grader......................$ 24.10 11.05+a Loader......................$ 23.10 10.40+a Master Mechanic.............$ 20.70 3.21 Milling Machine.............$ 23.10 9.95+a Paver.......................$ 22.20 10.40 Piledriver..................$ 24.80 7.83 Roller, Asphalt.............$ 22.20 10.40 Roller, Earth...............$ 22.84 8.29+a Screed......................$ 13.65 1.25 Sweeper.....................$ 22.20 10.40+a Tractor with attachments....$ 16.02 3.21

4/12/2011http://www.wdol.gov/wdol/scafiles/davisbacon/MD74.dvb

TRUCK DRIVER

Dump........................$ 15.35 5.45 Tack........................$ 19.24 3.21 Tractor Trailer.............$ 18.24 3.21

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .