NIHDA-2018-00265_SOW_TEC_Attachment_8.5.2018.pdf
PDF 16 KB Posted
- Solicitation number
- NIHDA-2018-00265
About this file
Technical Evaluation Criteria - Statement of Work Attachment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NIHDA-2018-00265_CSS_8.5.2018.pdf | ||
| NIHDA201800265_Statement_of_Work_Redacted.pdf | ||
| NIHDA-2018-00265_CSS_8.5.2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CTF 100% HELIUM RECOVERY SYSTEM
ATTACHMENT: TECHNICAL EVALUATION CRITERIA
FAR clause 52.212-2, Evaluation – Commercial Items applies to this acquisition and the specific evaluation criteria to be included in paragraph (a) of that provision are as follows:
The Government will award a contract or purchase order resulting from this requirement on the basis of best value, technical factors and price considered. Technical factors together shall be considered more important than price. The technical evaluation factors are as follows, in order of importance:
1. Factor 1: Technical Approach
The Contractor’s proposal shall address each area of the statement of work requirements in sufficient detail to demonstrate a clear understanding of the technical proposal of how it meets each of the project requirements. This shall include the proposed equipment utilized, how the system will be integrated into the existing hardware, and quality control.
2. Factor 2: Approach to Delivery, Installation and Testing, and Training
The Offer shall detail in its technical proposal how it shall meet the specifications for the proposed equipment, how it shall perform system integration to existing hardware, how it shall perform quality control, how the proposed equipment will be delivered and installed, what testing will be performed, and how staff will be trained on the new equipment.
Technical proposals will be evaluated using a summary adjectival rating in accordance with the following scale:
Excellent
The proposal has exceptional merit and reflects an excellent approach which will clearly result in the superior attainment of all requirements and objectives. This clearly achievable approach includes several advantageous characteristics of substance, and very few disadvantages, which can be expected to result in outstanding performance. The risk of unsuccessful performance is very low as the proposal provides solutions which are unquestionably feasible and practical.
These solutions are further considered very low risk in that they are exceptionally clear and precise, fully supported, and demonstrate a clear understanding of the requirements. Risk Level: Very Low
Good The proposal demonstrates a sound approach which is expected to meet all requirements and objectives. This sound approach includes advantageous characteristics of substance, and few relatively minor disadvantages, which collectively can be expected to result in satisfactory performance. The risk of unsuccessful performance is low as the proposal contains solutions which are considered feasible and practical. These solutions are further considered to reflect low risk in that they are clear and precise, supported, and demonstrate an understanding of the requirements. Risk Level: Low
Acceptable
The proposal demonstrates an approach which is capable of meeting all requirements and objectives. The approach includes both advantageous and disadvantageous characteristics of substance, where the advantages are not outweighed by the disadvantages. Collectively, the advantages and disadvantages are likely to result in acceptable performance. The risk of unsuccessful performance is moderate, as the proposal solutions are generally feasible and practical. These solutions may also be considered to reflect moderate risk in that they may be somewhat clear and precise, partially supported, and/or demonstrate a general understanding of the requirements. Risk Level: Neutral
Marginal The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The approach has disadvantages of substance and advantages, which if they exist, are outweighed by the disadvantages. Collectively, the advantages and disadvantages present a low or questionable likelihood of resulting in satisfactory performance. The risk of unsuccessful performance is high as the proposal contains solutions which may not be feasible and practical. These solutions may also be considered to reflect high risk in that they lack clarity and precision, are generally unsupported, and/or do not demonstrate a complete understanding of the requirements. Risk Level: High
Unacceptable The proposal demonstrates an approach which, based on a very high risk, will very likely not be capable of meeting all requirements and objectives. This approach has several disadvantages of substance, and advantages which, if they exist, are outweighed by disadvantages.
Collectively, the advantages and disadvantages are unlikely to result in satisfactory performance. The risk of unsuccessful performance is very high as the proposal contains solutions which are not feasible and practical. The solutions may also be considered to reflect very high risk in that they lack any clarity or precision. Risk Level: Very High
File details come from the government source that posted it.