NIFC 300-JWH Suite 138 143 Repairs - Prologue.docx

DOCX document 91 KB Posted

Attached to
NIFC 300 JWH REPAIRS SUITE 138/143
Solicitation number
140L3721R0008
Issued by

About this file

This document provides details for an interior renovation project at the National Interagency Fire Center in Boise, Idaho. The project involves renovating approximately 4,360 square feet of office and meeting space within Suite 138/143 of the 300-Jack Wilson Headquarters building. The work includes interior demolition, renovation of architectural, mechanical and electrical systems, and construction of open offices, private offices and conference rooms. The performance period is 160 calendar days. The occupied building requires coordination for any occupant relocations. The designated contractor work area will be provided onsite. Standard business hours are Monday through Friday from 7:00am to 4:30pm, with consideration given to requests to work additional hours. A pre-bid meeting will be held on the specified date and time provided. Interested contractors should refer to the associated solicitation for further details.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

Fire and Aviation 3833 S Development Ave Boise, Idaho 83705-5354

March 2021

PROLOGUE

NIFC 300-JWH Suite 138 143 Repairs

The work consists of an interior renovation of a 4,360 square foot suite and adjacent rooms on the first floor of the 300-Jack Wilson Headquarters (JWH) building. The construction includes interior demolition work and interior renovation of architectural, mechanical, and electrical systems for open offices, private offices, and conference rooms. The building is located on the National Interagency Fire Center (NIFC) campus at 3833 S. Development Ave Boise, ID 83705.

General information about 300-JWH and the project is provided below. See the Solicitation Documents for specific information on the project.

1. Construction Period: The construction period of performance is 160 days for this work.

2. Building Occupancy: The buildings will be occupied during this construction project. However, the project construction area within the suite will be unoccupied. Contractor shall coordinate with the Contracting Officer Representative (COR) a minimum of one week ahead of any work that requires occupant moves. Contractor shall provide all safety barriers required for contractor and occupant safety, as well as dust protection for equipment on work surfaces. The main hallway outside of the suite is to remain open to the occupants.

3. Existing Building Construction: 300-JWH is a two-story office building with a partial basement. Total building area is approximately 55,400 square feet. The suite is located on the main floor. The building is masonry block construction with steel structural framing. Masonry block construction is used at the exterior walls. Steel studs with gypsum board are used for interior partitions. The ceiling is primarily a dropped ceiling with T-grid acoustic tiles. The building was constructed in 1992.

4. Security: NIFC is a secure site with a controlled security entrance.

a. Prior to commencing work, the contractor shall provide a list to the Contracting Officer containing names for all contractor personnel who will work on NIFC. Any changes to the list shall be provided to the COR a minimum of one day prior to arrival.

b. All contractors’ personnel shall present an official US Government or State Government issued photo identification at the security gate. Starting October 2021, State Government issued ID must be REAL ID-compliant to be accepted. ID’s will be compared to the contractor’s personnel list.

c. All the contractors’ personnel shall wear NIFC furnished visitor badges in a visible location at all times while on the campus and return the badge at the end of each day, or at the completion of the project. Badge turn-in is at the discretion of the NIFC Security Manager.

d. Contractor personnel shall not enter the site more than 30 minutes prior to the start of the scheduled workday and must leave the campus within 30 minutes of the scheduled workday completion.

5. Contractor Area: A lay-down, staging, and contractor-provided portable toilet area will be designated for the project. Physical size of area required will be coordinated with the government upon award. Contractor shall provide sanitary facilities during the construction period for their employees and subcontractors.

6. Work Hours: Construction work shall be conducted during regular office hours which are 7:00 am to 4:30 pm, Monday through Friday with exceptions for holidays and early releases. Contractor requested work during holidays, evenings, nights, and weekends will be considered by the government Contracting Officer, on a case-by-case basis.

7. Pre-Bid Construction Meeting: The pre-bid construction meeting shall be held on [DATE] at [TIME] at [ADDRESS].