NIFC 300-JWH Suite 138 143 Repairs - QA_0001.pdf

PDF 382 KB Posted

Attached to
NIFC 300 JWH REPAIRS SUITE 138/143
Solicitation number
140L3721R0008
Issued by

About this file

This document contains questions and answers from a post-site visit for a federal solicitation to perform repairs at NIFC 300 JWH in Boise, Idaho. The solicitation number is 140L3721R0008 and is issued by the Bureau of Land Management Idaho Region. Key details include confirmation that basement space exists under rooms 169 and 170 requiring poke-through floor boxes, clarification that MC cable cannot be used per the specifications, restrictions on the number of workers allowed on site during construction, confirmation that the period of performance includes 160 calendar days of on-site work starting no earlier than October 4th, verification that contractor access will be through the west door at hall 136, clarification that past performance is for responsibility determination not an evaluation factor, correction to the bid schedule, and confirmation that the height from floor to deck is approximately 13 feet 7 inches.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

Fire and Aviation 3833 S Development Ave

Boise, Idaho 83705-5354

POST SITE VISIT Q&A 3 MAY 2021

NIFC 300-JWH Repairs Suite 138/143 Solicitation Number 140L3721R0008

1. Question: Sheet E401 depicts a floor box that will be recessed in the existing floor. Is there basement space located under rooms 169 and 170? If so, will a “Poke Thru” type floor box be required?

Answer: There is basement space under rooms 169 and 170 that will have a dropped ceiling with removable acoustic tiles. See E401 and section 260533 for floor box requirements. Floor box to maintain floor fire separation.

2. Question: Specification documents 260519-2.1-state that type “MC Cable” is not to be used. Specification 260519-3.1-A states to conceal cables in finished walls, ceilings, and floors…… Upon investigation during the site walk-thru of the existing ceiling space, MC Cable is installed currently. Is it acceptable to use MC Cable within new wall spaces, and above ceiling grid when concealed?

Answer: No, work to comply with 260519-2.1.

3. Question: Will the government be restricting the number of worker personnel in the space during the construction activities?

Answer: See Prologue Revision 1

4. Question: Please confirm that the number of days for physical construction on site is 160 calendar days, and the anticipated start date is no earlier than October 4th.

Answer: See Amendment 1 which indicates the overall Period of Performance. See Prologue Revision 1 which indicates the on-site date.

5. Question: Will the contractor have unobstructed access through the west door at hall 136 for the duration of the project?

Answer: See Prologue Revision 1

6. Question: Section L, Page 32 of 33, Volume 2: Factor 1 (b) Though the solicitation package includes a Past Performance Questionnaire, the requirements for proposal submission do not contain any requirement to provide either past performance questionnaires or any form of project experience from the Prime Contractor. Please advise.

Answer: Past performance is not an evaluation factor. LPTA uses past performance as a responsibility determination, not a factor.

7. Question: Page 32 of 33, Volume 2: Factor 1 (c) Volume 2 has a 10-page allowance and requires the following: “information on major subcontractors demonstrating experience with requirements on projects of similar scope and complexity, as a minimum mechanical, electrical, controls sub-contractors. Evidence shall also be provided demonstrating their experience in managing projects/contracts of the same/similar dollar magnitude, size, complexity, and scope, including renovation, in the capacity for which they are proposed for this project.” This leaves little space for the requirements in section (b) (Question 6 above).

Answer: Conform to the 10 page allowance as required in the solicitation

8. Question: The Bid Schedule included with the solicitation appears to be for the incorrect project. Please provide the correct Bid Schedule.

Answer: See Bid Schedule Revision 1

9. Question: What is the height to the bottom of deck above?

Answer: It is approximately 13 feet 7 inches from the first floor finished floor to the bottom of the second floor deck. Verify in field.

10. Question: The Period of Performance listed on the SF1442 shows 9/6/21 – 11/16/21. This does not match the calendar days listed in Block 11 of the SF1442. What is the correct period of performance or project duration?

Answer: See Amendment 1

File details come from the government source that posted it. Updated .