AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

ATTACHMENT 1

NGA-RFI-15-0088

SOURCES SOUGHT/REQEST FOR INFORMATION

Open Date: 08/17/15_Close Date: 09/30/15

RFI Amendment 1_8-31/15

CALDER MOBILE MOVEMENT MODEL

A.1 INTRODUCTION:

(a) In accordance with Federal Acquisition Regulation (FAR) 52.215-3, “Request for Information for Planning

Purposes” This Sources Sought (SS) Notice / Request for Information (RFI) is for information and planning purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the National

Gallery of Art.

(b) The National Gallery of Art (NGA), Office of Procurement and Contracts (APC) is conducting market research for the Office of Object Conservation (DCL-OB) and is seeking written responses with information to assist the NGA with identifying potential sources that are interested in and capable of performing the work as described in Section

A.2 Requirements Description. The NGA is seeking to gain awareness of capabilities, determine interested parties, and support the formulation of an acquisition strategy for the planned project for an anticipated future solicitation.

Interested parties are encouraged to submitted comments and questions on the requirements.

A.2. REQUIREMENT DESCRIPTION:

(a) The National Gallery of Art in Washington, DC is interested in investigating means to create consistent, yet random movement in the large Calder Mobile installed in the NGA East Building Atrium that is not limited to simple rotation. In order to design a system that will effectively and safely produce movement of the Mobile, the NGA would like to investigate means for creating a three-dimensional computer model of the Mobile within the Atrium to simulate the effects of different means of moving the Mobile.

(b) The work requirements will encompass the following:

(1) The model should allow the NGA to visualize the Mobile’s movement under various conditions.

(2) The model should be able to simulate air-flow in a large atrium space from a number of supply locations and at differing velocities to determine the resulting velocity vectors / airflows in the East Building Atrium.

(3) The computer model should include a three-dimensional model of the Mobile in the existing East Building

Atrium and allow the NGA to see the resulting movement of the Mobile due to different air-flow scenarios.

(4) The model should be able to simulate the movement of the Mobile under more direct mechanical means to rotate the shaft which supports the Mobile.

(5) The project must include Finite Element Analysis of the Mobile to determine the stresses placed on the structural elements of the Mobile in response to various airflow loads and mechanical forces.

(6) The NGA is open to other means of creating movement of the Mobile in a manner that appears natural, and would like to be able to model these efforts through computer software.

(c) Contractor and/or Partner Questions:

(7) What experience does the contractor have with complex 3D modeling that requires associated material data in an industrial design, prototyping & manufacturing setting?

(8) What experience does the contractor have with 3D scanning and creating accurate geometry from those captured point cloud data sets?

(9) What experience does the contractor have with combing multiple 3D model elements into one file in a

CFD/FEA testing environment?

(10) What experience does the contractor have with running combined test sin CFD and FEA environments?

(I.E. Structural, Mechanical and Fluid dynamics overlapped)

(11) What experience does the contractor have with producing dynamic simulations in a CFD/FEA testing environment for which the results will be used to virtually prototype several solutions for testing using different variables until the desired result is achieved?

(12) Can the contractor provide simulation examples that can be viewed by the NGA team?

(13) What programs will the contractor be using and what is the output formats available to those programs?

(14) Will the contractor be willing to work with software companies of NGA’s choosing in order to produce the desired experiments?

(15) Will the contractor turn over all associated files to NGA on a drive for storage and archival purposes?

A.3. Site Visit

(a) Notice of Site Visit. The NGA located at Sixth Street and Constitution Avenue NW, Washington, DC 20565 has scheduled a site visit for Monday, August 31, 2015 from 10:00AM-11:00AM.

(b) The interested parties intending to attend the scheduled site visit must send an email to Denise B. Gilson, Contracting

Officer at db-gilson@nga.gov not later than 3:00PM (EST) Monday, August 31, 2015. The interested parties shall provide the following information: name of company or organization, a list of all attendees (full name) name of primary contact, including mailing address and phone numbers.

(c) All interested parties attending the site visit shall meet with NGA personnel at the NGA, East Building Entrance on

4th street Washington, DC 20565. No parking is available on site; please make the appropriate arrangements to arrive at Service Entrance at 9:45AM. Late arrivers will not be escorted.

(d) Site visit attendees are responsible for making their own lodging reservations, meals, and incidentals.

A.4. GENERAL SUBMISSION

(a) SUBMISSION INSTRUCTIONS:

(1) Responses shall be submitted electronically via email to Denise B. Gilson, Contracting Officer at db-gilson@nga.gov.

(2) Responses shall be received on or before Wednesday, September 30, 2015 at 3:00 PM (EST).

mailto:db-gilson@nga.gov mailto:db-gilson@nga.go mailto:db-gilson@nga.go

(b) GENERAL QUESTIONS:

All general questions shall be submitted electronically via email to Denise B. Gilson, Contracting Officer at db-gilson@nga.gov . The cut-off date and time for receipt of general questions is Thursday, September 24, 2015 at

12:00PM (EST). Questions received after this date and time may not be answered.

(c) TECHNICAL QUESTIONS:

Questions of a technical nature will be handled via email. Oral question of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of technical questions is September 24, 2015 at 12:00 PM (EST). Technical Questions received after this date and time may not be answered.

A.4. SUBMISSION INSTRUCTIONS:

(a) RESPONSE PREPARATION COSTS:

The Contracting Officer is the only individual legally authorized to commit the NGA to the expenditure of public funds in connection with any procurement. This SS/RFI does not commit the NGA to pay any costs for the preparation and submission of a response in response to this SS/RFI notice.

(b) GENERAL:

All potential sources with the capability to provide the requirements referenced in this SS/RFI are invited to submit, in writing, sufficient information within the page & format limitation (listed below). This information must demonstrate the responder's ability to fulfill the requirements and be responsive to the technical questions in this

SS/RFI, as indicated below.

(c) FORMAT:

The response shall be clearly indexed and logically assembled. Arial or Times New Roman fonts are required.

Characters shall be set at no less than normal spacing and 100% scale. Font size shall be no smaller than 12-point.

The response must be submitted as a single application-generated (not scanned) PDF document that is less than or equal to 20MB in size.

(d) CONTENT REQUIREMENTS:

All information shall be confined to the appropriate tab. The requirements for each tab are shown in the Table below:

TAB INFORMATION

TAB 1 COVER PAGE

TAB 2 CAPABILITY INFORMATION

TAB 3 REQUIRMENT RESPONSES

(e) TAB I – COVER PAGE REQUIREMENTS: The cover page shall include the following information:

(1) SS/RFI Title & Number (NGA-RFI-15-0088_ Calder Mobile Movement Model);

(2) Company Name;

(3) Company Address;

(4) Company Point of Contact (Name, Phone Number, email address)

(5) Company Data Universal Numbering System (DUNS) Number;

(6) Company Business Size;

(7) Company Business type (i.e., Large Business, Small Business, Service-Disabled Veteran-Owned Small

Business, Small Disadvantaged Business, Woman-Owned Small Business, Hub Zone Small Business, etc.).

(8) Company’s Federal Supply Schedule (FSS) Contract (If applicable). Provide the GSA Contract

Number and relevant Special Item Number(s) (SINs) applicable to this requirement.

(f) TAB II – CAPABILITY INFORMATION REQUIREMENTS: Respondents shall provide a general capabilities statement to address the following information:

(1) Provide no more than five (5) contracts that your company has performed within the last three (3) years that are of comparable size, complexity, and scope to this requirement. Please include the following information at a minimum:

I. Contract Name;

II. Contract Scope;

III. Awarded Price/Cost;

IV. Governments technical representative/Contracting Officer’s Representative (COR) and current e-mail address, telephone and fax numbers (or commercial point of contact equivalent);

V. Describe your self-performed** effort (as either a Prime or Subcontractor). Describe self- performed work in terms of dollar value and description;

**Self-Performed means work performed by the company themselves, NOT work performed by another company for them for any of the project examples provided.

VI. A brief narrative that describes the details of each project and why it is relevant to this requirement, including difficulties and successes.

(g) TAB III – RESPONSES TO NGA’s REQUIRMENTS : Respondents shall provide responses to the following questions concerning the attached REQUIRMENTS:

(1) Provide any comments and/or questions your company may have regarding the Requirements.

(2) What else has your company seen that could help better structure the NGA Statement of Work?

(3) What is the suggested North American Industry Classification System (NAICS) code for this requirement?

(4) Provide an example of a Contract Line Item Number (CLIN) Structure that your company feels would be the most efficient and effective for type of procurement.

(5) Provide your company is pricing model.

(6) Provide anticipated project milestones for all phases.

(7) Provide a Rough Order Magnitude Estimate (ROM).

A.5. DISCLAIMER:

(a) This SS/RFI notice is issued solely for information and planning purposes only, and does not constitute a solicitation, Request for Proposal (RFP), promise to issue an RFP or any obligation on the part of the Government.

Per FAR 15.201(e), responses to this notice are not considered offers, shall not be used as a proposal, and cannot be accepted by the Government to form a binding contract. Furthermore, those who respond to this RFI should not anticipate feedback with regards to its submission; other than acknowledgement of receipt – if a request for an acknowledgement is requested by the submitter. Neither unsolicited proposals nor any other kinds of offers will be considered in response to this notice. No evaluation letters and/or results will be issued to the respondents; however, the Government does reserve the right to contact any respondent and/or respondent reference to obtain additional information. At this time no solicitation exists; therefore, please do not request a copy of the solicitation.

(b) Any resulting procurement action will be the subject of a separate, future announcement. The information is provided for discussion purposes and any potential strategy for this acquisition may change prior to any solicitation release. The acquisition strategy, evaluation methodology, contract type, and other acquisition decisions are to be determined.

(c) Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this SS/RFI. All costs associated with responding to this SS/RFI will be solely at the responding party’s expense. Not responding to this RFI does not preclude participation in any future RFP. The information provided in this RFI is subject to change and is not binding on the NGA. All submissions becomes the property of the NGA, and will not be returned.

08NGA03039BG-TO2 R4-09_0108-TTL FEE.pdf
09_0423-gilson-08NGA03039BG-TO3 Mod 1-Revised.pdf
09_0423-08NGA03039BG-TO1 MODS 1 - R1.pdf
08NGA03039BG-TO 3- Mod 1-R1-TOTAL
08NGA03039BG-TO 3- Mod 1-sumodc
08NGA03039BG-TO 3- Mod 1-HCA
08NGA03039BG-TO 3- Mod 1-HCA TASKS
08NGA03039BG-TO 3- Mod 1-HCA ODC
08NGA03039BG-TO 3- Mod 1-R1-SAKO
08NGA03039BG-TO 3- Mod 1-R1-SAKO TASKS
09_0424-gilson-08NGA03039BG-TO3 Mod 1-R2.pdf
R2 fee.pdf
08NGA03039BG-TO 3- Mod 1-R2-TTL FEE
08NGA03039BG-TO 3- Mod 1-sumodc
08NGA03039BG-TO 3- Mod 1-HCA
08NGA03039BG-TO 3- Mod 1-HCA TASKS
08NGA03039BG-TO 3- Mod 1-HCA ODC
08NGA03039BG-TO 3- Mod 1-R2-SAKO
08NGA03039BG-TO 3- Mod 1-R2-SAK0 TASKS
RFP-1 Add Design Security Entrance.pdf
April 14, 2009
Hartman-Cox Architects
1074 Thomas Jefferson Street NW
Subject: Contract No. 08NGA03039BG-03
Dear Ms. Lanzillotta,
Scope of Work for Non-Title 1 Additional Design Services WA4 04 10 2009.pdf
Scope of Work
The National Gallery of Art is planning renovations to the main Service Entrance within the northeast portion of the West Building known as Work Area 4. The goal of this Request for Proposal (RFP) is to assist NGA with the identification and specification of the existing and new furniture, fixtures, and equipment (FFE) for this reconfigured space.
Additional Design Services are to include, but are not limited to:
09_1228-gilson-08NGA03039BG-TO3-Design Changes.pdf
09_1228-TO3-AHU MOD-FINAL.pdf
09_1216-08NGA03039BG-TO 3-AHU Redesign-total
09_1216-08NGA03039BG-TO 3-AHU Redesign-sumodc
09_1216-08NGA03039BG-TO 3-AHU Redesign-HCA
09_1216-08NGA03039BG-TO 3-AHU Redesign-HCA TAKS
09_1216-08NGA03039BG-TO 3-AHU Redesign-HCA ODC
09_1216-08NGA03039BG-TO 3-AHU Redesign-TTG
09_1216-08NGA03039BG-TO 3-AHU Redesign-TTG TASKS
09_1216-08NGA03039BG-TO 3-AHU Redesign-URS
09_1216-08NGA03039BG-TO 3-AHU Redesign-URS TASKS
09_1216-08NGA03039BG-TO 3-AHU Redesign-HAI ODC
09_1216-08NGA03039BG-TO 3-AHU Redesign-HAI TASKS
09_1216-08NGA03039BG-TO 3-AHU Redesign-HAI
12_0104-gilson-08NGA03039BG-TO7-1-WA9-EBX.pdf
RFP-7-1 EBX-WA9 Predesign-signed Letter.pdf
Subject: Contract Number: 08NGA03039BG
Task Order No. 08NGA03039BG-07
Request for Proposal: RFP-7-1: EBX-WA9 Predesign
Please submit a cost/price proposal for the additional Predesign Services for the Implementation Scenarios for the East Building Work Area #9/Gallery Expansion Project (EBX)the work identified shall be performed in accordance with the subject Contract...
SOW EBX-WA Predesign.pdf
Statement of Work – Task Order 7
Background & Objectives: In conjunction with the Master Facilities Plan Update for the East Building and Connecting Link, develop a detailed phasing and implementation plan using existing documents, that encompasses public space in the East Building....
Task 1: Existing Conditions Survey
Task 2: Project Integration and Implementation Planning
Task 3: Implementation Plan Report
Task 4: Prototype Floor Plan
5. Include a final presentation meeting.
12_0126-gilson-08NGA03039BG-TO7-1-WA9-EBX.pdf
12_0126-08NGA03039BG-TO 7 mod 6.pdf
11_1225-08NGA03039BG-TTL-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-SUM ODC-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-HC-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-HC TASKS-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-HC ODC-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-TT-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-TT TASKS-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-TT ODC-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-URS-HAI TASK-TO 7 mod 6.xlsx
11_1225-08NGA03039BG- URS tasks-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-HAI-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-HAI TASK-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-HAI ODC-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-BF-TO 7 mod 6.xlsx
11_1225-08NGA03039BG- bf tasks-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-BF ODC-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-SAKO-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-SAKO TASKS-TO 7 mod 6.xlsx
11_1225-08NGA03039BG-SAKO ODC-TO 7 mod 6.xlsx
blank
RFP-7-1 EBX-WA9 Predesign- Letter.pdf
Subject: Contract Number: 08NGA03039BG
Task Order No. 08NGA03039BG-07
Request for Proposal: RFP-7-1: EBX-WA9 Predesign
Please submit a cost/price proposal for the additional Predesign Services for the Implementation Scenarios for the East Building Work Area #9/Gallery Expansion Project (EBX)the work identified shall be performed in accordance with the subject Contract...
SOW EBX-WA Predesign.pdf
Statement of Work – Task Order 7
Background & Objectives: In conjunction with the Master Facilities Plan Update for the East Building and Connecting Link, develop a detailed phasing and implementation plan using existing documents, that encompasses public space in the East Building....
Task 1: Existing Conditions Survey
Task 2: Project Integration and Implementation Planning
Task 3: Implementation Plan Report
Task 4: Prototype Floor Plan
5. Include a final presentation meeting.
12_0319-gilson-08NGA03039BG-TO7 Mod 007.pdf
RFP-EB Expansion Feasibility.pdf
Subject: Contract Number: 08NGA03039BG
Task Order No. 08NGA03039BG-07
Request for Proposal: RFP-7: Modification 007
12_0525-gilson-08NGA03039BG-TO7 Mod 008.pdf
12_0525-TO 7 MOD 9.pdf
12_0510-ttl-08NGA03039BG-TO 7-Mod 9.xls
12_0510-08NGA03039BG-TO 7-Mod 9.xls
03-12_0510-08NGA03039BG-TO 7-Mod 9.xls
04-12_0510-08NGA03039BG-TO 7-Mod 9.xls
05-12_0510-08NGA03039BG-TO 7-Mod 9.xls
06-12_0510-08NGA03039BG-TO 7-Mod 9.xls
07-12_0510-08NGA03039BG-TO 7-Mod 9.xls
08-12_0510-08NGA03039BG-TO 7-Mod 9.xls
09-12_0510-08NGA03039BG-TO 7-Mod 9.xls
10-12_0510-08NGA03039BG-TO 7-Mod 9.xls
11-12_0510-08NGA03039BG-TO 7-Mod 9.xls
12_1227-gilson-08NGA03039BG-TO11 Mod 001.pdf
00-12_1227-gilson-08NGA03039BG-TO11 Mod 001
01-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
02-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
03-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
04-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
05-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
06-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
07-12_1221-08NGA03039BG-TO 10 Mod XX.xlsx
Attachment 1_12-11-13.pdf
Part I – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, August 30, 2013 and its revision, dated October 29, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as ...
The work identified shall be performed in accordance with the terms and conditions described herein, Contract No. 08NGA03039BG, Task Order F012 awarded on March 27, 2013 and A-E Special Conditions, dated December 1, 2008.
Statement of Work
The National Gallery of Art is planning major capital renewal renovations for the public spaces in the East Building. Public spaces include the Concourse galleries, large and small auditoria, the main atrium and lobby, Pods 1, 2, and 3, and the galle...
Additional Design Services are to include, but are not limited to:
Statement of Work
The National Gallery of Art is planning major capital renewal renovations for the public spaces in the East Building. Public spaces include the Concourse galleries, large and small auditoria, the main atrium and lobby, Pods 1, 2, and 3, and the galle...
Additional Design Services are to include, but are not limited to:

Revised 2: Statement of Work

Attachment 1_12-18-13.pdf
Part I – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, August 30, 2013 and its revision, dated October 29, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as ...
The work identified shall be performed in accordance with the terms and conditions described herein, Contract No. 08NGA03039BG, Task Order F012 awarded on March 27, 2013 and A-E Special Conditions, dated December 1, 2008.
Statement of Work
The National Gallery of Art is planning major capital renewal renovations for the public spaces in the East Building. Public spaces include the Concourse galleries, large and small auditoria, the main atrium and lobby, Pods 1, 2, and 3, and the galle...
Additional Design Services are to include, but are not limited to:
Statement of Work
The National Gallery of Art is planning major capital renewal renovations for the public spaces in the East Building. Public spaces include the Concourse galleries, large and small auditoria, the main atrium and lobby, Pods 1, 2, and 3, and the galle...
Additional Design Services are to include, but are not limited to:

Revised 2: Statement of Work

Revised 13_1125-gilson-08NGA03039BG-TO 12 Mod 01.pdf
13_1118-gilson-08NGA03039BG-TO 12 Mod 01.pdf
13_1118-combined fee.pdf
01-08NGA03039BG-TO 12 Mod 01-R1.xlsx
02-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
03-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
04-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
05-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
06-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
07-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
08-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
09-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
10-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
11-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
12-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
13-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
14-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
15-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
16-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
17-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
18-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
19-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
20-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
21-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
22-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
23-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
24-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
25-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
13_1212-gilson-08NGA03039BG-TO 12 Mod 01.pdf
13_1212-ttl fee-08NGA03039BG-TO 12 Mod 01.pdf
01-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
02-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
03-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
04-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
05-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
06-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
07-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
08-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
09-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
10-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
11-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
12-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
14-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
15-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
16-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
17-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
18-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
19-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
20-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
21-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
22-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
23-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
24-13_1031-08NGA03039BG-TO 12 Mod 01-R1.xlsx
M002 Attachment 1_12-11-13.pdf
Part 1 – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, December 9, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as expressly provided herein, timely perfor...
The work identified shall be performed in accordance with the terms and conditions described herein, Contract No. 08NGA03039BG, Task Order F012 awarded on March 27, 2013 and A-E Special Conditions, dated December 1, 2008.
Scope of Work
1. Hartman-Cox Architects (HCA) and their consultants (hereinafter referred to jointly as the A/E) shall perform construction administration (CA) services in accordance with the contract A/E Special Conditions and with the design and construction Cont...
2. The Construction Administration Services are to include, but are not limited to:
M007 Attachment 1.pdf
Part 1 – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, December 9, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as expressly provided herein, timely perfor...
I.1. 52.217-8. Option to Extend Services (Nov 1999)
Exhibit 1-SOW 12-9-14.pdf
1. Hartman-Cox Architects (HCA) and their consultants (hereinafter referred to jointly as the A/E) shall perform construction administration (CA) services in accordance with the contract A/E Special Conditions and with the design and construction Cont...
2. The Construction Administration Services are to include, but are not limited to:
M007 Attachment 1.pdf
Part 1 – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, December 9, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as expressly provided herein, timely perfor...
I.1. 52.217-8. Option to Extend Services (Nov 1999)
M007 Attachment 1.pdf
Part 1 – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, December 9, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as expressly provided herein, timely perfor...
I.1. 52.217-8. Option to Extend Services (Nov 1999)
M007 Attachment 1.pdf
Part 1 – The Schedule
Section B – Supplies or Services and Price/Cost
Section C – Statement of Work
C.1. Statement of Work
Statement of Work. The Statement of Work dated, December 9, 2013 provided as Exhibit 1 herein is hereby incorporated into this modification. Hartman-Cox Architects shall, at no cost to the Gallery other than as expressly provided herein, timely perfor...
I.1. 52.217-8. Option to Extend Services (Nov 1999)
Exhibit 1-SOW 12-9-14.pdf
1. Hartman-Cox Architects (HCA) and their consultants (hereinafter referred to jointly as the A/E) shall perform construction administration (CA) services in accordance with the contract A/E Special Conditions and with the design and construction Cont...
2. The Construction Administration Services are to include, but are not limited to:
M008 Attachment 1.pdf
Part 1 – The Schedule
M008 Attachment 1.pdf
Part 1 – The Schedule
M008 Attachment 1.pdf
Part 1 – The Schedule
M0010 Attachment 1.pdf
Part 1 – The Schedule
M0010 Attachment 1.pdf
Part 1 – The Schedule
IDCode:
Page: 1
Pages: 6
AmendNo: M0001
EffDate: 08/31/15
ReqNo: N/A
ProjNo:
IssCode:
IssuedBy: National Gallery of Art

Office of Procurement and Contracts 200B South Club Drive Landover, MD 20785

AdmCode:
AdminBy:
ContName: RFI Interested Parties
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo: NGA-RFI-15-0088
AmendDate: 08/17/15
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
ApprData: N/A
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: See attached revised RFI.NGA-RFI-15-0088. Amendment 1.
SignName:
SignTitl:
ContDate:
CoName: Denise B. Gilson
CoTitle: Contract Specialist
CODate:
SolChgYs: Off
SolChgNo: Off
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off

File details come from the government source that posted it. Updated .