NGA-16-RFI-0063MB_A0001.docx
DOCX document 19 KB Posted
- Attached to
- RFI: Disaster Recovery Site/Solution
- Solicitation number
- NGA16RFI0063MB
- Issued by
-
National Gallery of Art
About this file
NGA-16-RFI-0063MB A0001 NGA-16-RFI-0063MB A0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NGA-16-RFI-0063MB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Modification to a Previous Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Modification to a Previous Notice Rev. March 2010 RFI: Disaster Recovery Site/Solution 20785
NGA-16-RFI-0063MB
10-17-2016 N 541519 National Gallery of Art Office of Procurement and Contracts 2000B South Club Drive Landover MD 20785 The following questions and answers are generated as a result of inquiries made regarding this Sources Sought Announcement. The due date for responses of October 17, 2016 has not changed.
1) On the first page of the solicitation... the due date is Oct 17, 2016. But on the last page (6) of the solicitation, it has a date of 09/30/2016. That was my mistake. Would you please let the bidders know the due date is indeed Oct 17, 2016?
2) Is there an incumbent? The answer is: No, this is a brand new strategic initiative, and we are looking for the industry to assist us.
Question 3: What options are available for data replication?
Answer: We currently do not have replication in place other than mirror drives, or hardware RAID 6. Our VMware infrastructure runs on VMware v5.5 with standard licensing model only (thus no advanced features). We do plan on upgrading our VMware v5.5 to v6.x within FY17. Looking to industry to advise us on the way forward.
Question 4: What storage technology is in use to support virtualized machines?
Answer: We use entry level DELL PowerVault MD3220 with MD1220 expansion enclosures for DEV/Test, DELL PowerVault MD3620 and DELL PowerVault MD3820 with MD1220 expansion enclosures for our production environment (public facing and intranet).
Question 5: How much bandwidth is available at each hosting site, including NGA on-premises, that can be used for replication?
Answer: We plan to upgrade our internet links from 1Gbps to 10Gbps in Q1FY17. For internal (between NGA/SI), we are running through a pair of 10Gbps. We don’t have Quality of Service (QoS) rate limiting in place as of yet.
Question 6: What are the recovery time objective (RTO) and recovery point objective (RPO) goals for Tiers 2-4 systems?
Answer:
RTO – As soon as possible. But, in general:
| • | Tier2: By the third day if not sooner. |
| • | Tier3: Within one week if not sooner. |
| • | Tier4: To be brought up shortly after 2 and 3 are operational. |
RPO – The least amount of loses the better. However, not all systems should be treated the same way, and we are looking for recommendations.
Question 7: Does this solution need to support both failover and failback?
Answer:
Failover – automatic as well as manual intervention Failback – manual intervention (assumption is databases can be sync back to the on-premise instances). If we can execute this task with automated scripts to ensure pre and post failback data integrity that will be great.