This document is a Work Item Schedule for federal-aid highway surface maintenance and spot surfacing projects on two road segments designated as NFSR 2255 and NFSR 2044.

NFSR 2255 extends 4.69 miles beginning at mile post 0.81 (Junction with HWY 22) and ending at mile post 5.50. The project includes surface maintenance with 5% crown specifications over the entire 4.69-mile segment and spot surfacing using ODOT 3/4-inch minus material (538.50 tons, as staked by the County). NFSR 2044 extends 5.58 miles beginning at mile post 0.00 (Junction with HWY 20) and ending at mile post 5.58. This segment also includes surface maintenance with 5% crown specifications over the full 5.58-mile length and spot surfacing with identical ODOT 3/4-inch minus material specifications (538.50 tons, as staked by the County). Both projects are identified by work item numbers 811(3) for surface maintenance and 813(2) for spot surfacing, with the latter project terminating at a junction with 230 Road.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILE POST ITEM

NUMBER QUANTITY UNIT NFSR 2255

0.00 JUNCTION WITH HWY 22

0.81 BOP

811(3) 4.69 MILE BEGIN SURFACE MAINTENANCE, 5% CROWN

813(2) 538.50 TON BEGIN SPOT SURFACING ODOT 3/4-INCH MINUS (AS STAKED BY CO)

5.50 EOP

END SURFACE MAINTANCE, 5% CROWN

END SPOT SURFACING

MILE POST ITEM

NUMBER QUANTITY UNIT NFSR 2044

0.00 JUNCTION WITH HWY 20

BOP

811(3) 5.58 MILE BEGIN SURFACE MAINTENANCE, 5% CROWN

813(2) 538.50 TON BEGIN SPOT SURFACING ODOT 3/4-INCH MINUS (AS STAKED BY CO)

5.58 EOP

END SURFACE MAINTANCE

END SPOT SURFACING

JCT WITH 230 RD RT