ATTACHMENT_A_Vessel_Information.doc

DOC document 62 KB Posted

Attached to
Sanak Island, Alaska Vessel Charter CANCELLED
Solicitation number
NFFS7100-16-03492
Issued by

About this file

Vessel Information

View the file

Other files

File Type Posted
ATTACHMENT_D_SAM_Registration.doc DOC document
ATTACHMENT_E_Tax_Liability.docx DOCX document
ATTACHMENT_C_Reps_and_Certs.docx DOCX document
ATTACHMENT_B_Coast_Guard_Requirements.docx DOCX document
MOORING_LOCATIONS_-_MOORING_ASSEMBLY.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VESSEL INFORMATION

SANAK MOORING DEPLOYMENT

OFFEROR BACKGROUND INFORMATION

Vessel Name:

USCG Registration No.:

Vessel Owner/Manager:

Vessel Owner/Manager Contact Information

(Office and cell numbers, email address):

Location and Dates Vessel Available for Coast Guard Inspection, date of most recent inspection:

Year Built:

Vessel Length (LOA):

Vessel Draft:

Vessel Beam:

Number and Type of Engine(s) and Configuration (include main and auxiliary):

VESSEL REQUIREMENTS

Is the vessel at least 58 feet length overall (LOA)?
Yes or No.
Does the vessel have an echosounder?
What is the operating frequency of the transducer(s)?
Is the echosounder transceiver (deck unit) and/or the transducer made by Simrad?
What is the model of the transceiver? What is the model of the transducer?
Does the vessel have back deck space to carry 2 moorings each weighing 850 lbs, and each with a footprint of 4 ft x 6 ft by 2 feet tall?
Yes or No
Does the vessel have the capability to deploy the moorings described in the statement of work from the sea surface without rough handling?
Please describe how the mooring can be deployed to a depth of 200 m by the vessel. Attach more pages if needed.
Is a crane or A-frame available aboard the vessel to lift the mooring over the side of the ship?
Yes or No
Does the vessel have the capability to lower the mooring to a depth of 200 m?
Yes or No
Does the vessel have the capability to bring the mooring back on deck during the deployment operation if an unexpected problem occurs (e.g., acoustic release does not release mooring from lowering line)?
Yes or No
Does the vessel have the capability to temporarily attach a transducer pole to the side of the ship so the user-supplied transducer described in the statement of work can be positioned 4-6 ft below the water surface where it will remain in position at a maximum ship speed of 4 kts?
Yes or No.

Is fuel for vessel operations included in the price?

Yes or No

Does the vessel have a suitable interior dry space approximately (1x3 feet) with adjacent 110 Volt AC power outlets to charge batteries and a user-supplied laptop?
Yes or No.

Is the vessel outfitted with the following electronic equipment?

( Plotter with GPS positioning

( Radar

( Cell or Satellite phone

( VHF and SSB radio Yes or No.

CREW REQUIREMENTS

Is the Captain or at least one crew member certified in first aid and at least one certified in CPR?

Yes or No.

ACCOMMODATION REQUIREMENTS

Is the vessel capable of accommodating two (2) fishery scientists/observers for five days?
Yes or No.
Does the vessel have a marine head (toilet) that is clean and sanitary?
Yes or No.
Are working spaces on board the vessel adequately ventilated and free from excessive noise and fumes?
Yes or No.

Is the vessel capable of carrying provisions for 5 days at sea for all personnel?

Yes or No.

Is the vessel and crew available to conduct operations for 5 days during late Oct or Nov 2016?
Yes or No.

File details come from the government source that posted it. Updated .