Newnan Crossing _ Diplomat Pkwy Signal Plan 2.pdf
PDF 3 MB Posted
- Solicitation number
- PE-63850-NONST-2027-000000031
- Issued by
- Crisp County, Georgia
About this file
This is a Traffic Signal Installation Plan document prepared for the City of Newnan, Georgia, detailing the signal design and construction specifications for the intersection of Newnan Crossing Boulevard East, Diplomat Parkway, and Stonebridge Crossing. The project encompasses the installation of a complete traffic signal system including controller and cabinet assembly with battery backup, radar detection equipment, and all associated materials and labor necessary for full operational implementation. In addition to traffic signal installation, the project scope includes related construction activities: sidewalk construction, curb and gutter installation, curb ramps, mill and overlay of asphalt surface, and application of thermoplastic pavement markings and retroreflective pavement markers (RPMs). The plan document provides detailed engineering drawings, specifications, and technical requirements to guide contractors in accurate bidding and execution of the work.
The signal plan establishes comprehensive technical standards for equipment installation, placement, and integration at the three-way intersection. Contractors must provide all materials, labor, tools, equipment, and traffic control services necessary to complete the installation in compliance with the specifications outlined in the plan document. The project represents infrastructure improvements to enhance traffic flow and safety at a critical intersection within the City of Newnan's jurisdiction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement for Bid _ Traffic Signal Instal.pdf | ||
| Invitation to Bid_ Traffic Signal Installatio.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E(B)
E(B)
E(B) E(B)
T(B) T(B) T(B)
T(B) T(B) T(B)
T(B)
T(B) T(B)
T(B) T(B)
W(B) W(B) W(B)
THT
E
W
W
WW
W
HTT WWWW
W
HT
WWW T
SS
S T
SS
S T
S T
S T
SS(C
S TS T
S T
SS(C)
S T
S T
S T
S T
S T
S T
SS(C)
SS(C)
SS
(C
SS(D) SS(D) SS(D)
HT
SS
SS
S T
NEWNAN CROSSING BLVD
(45 MPH)
NEWN
AN
CROS
SING
BL
VD
(45
MPH)
D I P L O M A T
P K W Y
M P H
ST
ON
EB
RI
DG
E
CR
OS
SI
NG
(2
MP
H)
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM P.I. No.GPLOT-V8 gplotborder-v8I-PO.tbl ########
11/05/2020
GPLN-CE
50 200
SCALE IN FEET
0 100
01-0001
GEORGIA
NV5 ENGINEERS & CONSULTANTS, INC.
10745 WESTSIDE WAY, SUITE 300
ALPHARETTA, GA 30009
P: 678.795.3600 www.NV5.com GA License # PEF003715, LSF000935
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE 2026
CONSTRUCTION STANDARDS AND DETAILS BOOK AND ATTACHED APPLICABLE
REVISIONS. THE 2026 CONSTRUCTION STANDARDS AND DETAILS BOOK IS
AVAILABLE AT:
https://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/AllItems.aspx
ANY REVISIONS CONTAINED WITHIN THIS PLAN SET SUPERSEDE THE 2026
CONSTRUCTION STANDARDS AND DETAILS BOOK WHICH THEY REVISE OR IN
WHICH THERE IS A CONFLICT.
FUNCTIONAL CLASS:
MINOR ARTERIAL
THIS PROJECT IS 100% IN THE CITY
OF NEWNAN AND IS NOT A STATE OR
COUNTY MAINTAINED ROADWAY.
THIS PROJECT HAS BEEN PREPARED
USING THE HORIZONTAL GEORGIA
COORDINATE SYSTEM OF 1984 (NAD
1983) / 94 WEST ZONE, AND THE
NORTH AMERICAN VERTICAL DATUM
(NAVD) OF 1988.
THIS DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN
ANYWAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER
MANNER, ARE BASED UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE
INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE SAME ARE SHOWN AS
INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THE DEPARTMENT OF
TRANSPORTATION IN ANY WAY. THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED
TO SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE SPECIFICATIONS.
LOCATION SKETCH
PLANS PREPARED
BY:
PLANS COMPLETED 07-10-2026
REVISIONS
DEPARTMENT OF THE CITy ENgINEER CITy OF NEwNAN
NEWNAN CROSSING BOULEVARD @
DIPLOMAT PARKWAY / STONEBRIDGE CROSSING
INTERSECTION IMPROVEMENTS
PROJECT LOCATION
LIMIT OF CONSTRUCTION
STA. 3+90.21
OFFSET=133.08'R
N:1232223.99 E:2118337.62
BEGIN PROJECT
STA. 3+63.57
OFFSET=53.46'R
N:1232292.56 E:2118290.51
END PROJECT
STA. 8+62.18
OFFSET=44.89'L
N:1232491.90 E:2118751.56
LIMIT OF CONSTRUCTION
STA. 4+24.33
OFFSET=87.60'L
N:1232445.35 E:2118309.35
AutoCAD SHX Text DRAWING No.
John.Karnowski
GA PE
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
INDEX
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
02-0001GEORGIA
DRAWING NO.
01-0001 02-0001
04-0001 TO 04-0002
06-0001
13-0001 TO 13-0002
26-0001
27-0001 TO 27-0002
DESCRIPTION DRAWING NO. DESCRIPTION
COVER
INDEX
GENERAL NOTES
QUANTITIES
CONSTRUCTION PLAN SHEETS
SIGNING & MARKING PLAN SHEETS
SIGNAL PLAN SHEETS
24-0001 UTILITY PLAN SHEETS
AutoCAD SHX Text DRAWING No.
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
GENERAL NOTES
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
04-0001GEORGIA
1. ALL CONCRETE SIDEWALKS AND WHEELCHAIR RAMPS LOCATED IN RADIUS
RETURNS SHALL BE 8" THICKNESS.
SIDEWALK NOTES
1. THE WORK AUTHORIZED MUST BEGIN WITHIN THREE MONTHS AND BE COMPLETED
WITHIN TWELVE MONTHS ON A SCHEDULE SATISFACTORY WITH THE CITY OF
NEWNAN FROM THE PERMIT APPROVAL DATA, AND ALSO, BE COMPLETED BEFORE
THIS FACILITY IS OPEN TO THE PUBLIC.
2. THE FOLLOWING WILL NOT BE ALLOWED ON THE PUBLIC RIGHT OF WAY: (1)
DIVERSION OF ADDITIONAL DRAINAGE AREA ON THE RIGHT OF WAY, OR
INCREASE IN THE CFS OF CURRENT VOLUMES OF WATER; (2) GRADING
EXCEPT AT DRIVEWAY CONSTRUCT LOCATIONS; (3) HEADWALLS; (4) SIGNS,
DISPLAYS, DEVICES, AND OTHER STRUCTURES WHICH ARE DESIGNED, INTENDED,
OR USED TO ADVERTISE OR INFORM; (5) LANDSCAPING WITHOUT PRIOR
APPROVAL OF LANDSCAPE PLANS.
3. ALL EXISTING UTILITIES WHICH WOULD BE UNDER NEW PAVEMENT OR IN
ACCELERATION / DECELERATION LANES SHALL BE RELOCATED BEFORE FINAL
GRADING OR PAVING AND AT NO COST TO THE CITY OF NEWNAN OR AN
APPROVED RETENTION LETTER FROM THE UTILITY OWNER.
4. CONSTRUCTION OF EROSION CONTROL BARRIERS PER GEORGIA DEPARTMENT OF
NATURAL RESOURCES CODE 291-3-7 AND SHALL BE MAINTAINED UNTIL
PERMANENT VEGETATION IS ESTABLISHED.
5. APPLICANT SHALL RESTORE ALL EXISTING SIGNS AND REGRASS TO CITY
SPECIFICATION ALL RIGHT OF WAY THAT IS DISTURBED DURING WORK AND
AUTHORIZED HEREIN.
6. THE PERMIT APPLICANT IS RESPONSIBLE FOR REPLACEMENT OF ALL EXISTING
PAVEMENT MARKINGS DAMAGED BY PERMIT CONSTRUCTION AND THE ADDITION OF
NEW PAVEMENT MARKINGS AND/OR SIGNS AS SHOWN ON THE APPROVED PLAN,
OR CURRENT M.U.T.C.D. GUIDELINES.
7. ALL CURBED ISLANDS SHALL BE FILLED TO THE TOP OF CURB WITH TOP
SOIL AND GRASSED. NOTE: THIS APPROVAL DOES NOT ALLOW ANY WORK ON
RIGHT OF WAY IN CONNECTION WITH UTILITY LINES (SANITARY SEWER,
WATER, TELEPHONE, GAS, ETC.)
REQUIRED PAVEMENT SPECIFICATIONS:
1 1/4" 9.5 mm SUPERPAVE 2" 19 mm SUPERPAVE 8" 25 mm SUPERPAVE
12" GRADED AGGREGATE BASE COURSE
SIDEWALK NOTES
1. OVERLAY SHALL BE AS DIRECTED BY THE CITY OF NEWNAN INSPECTOR.
2. ALL SIDEWALKS, CROSSWALKS, AND RAMPS SHALL BE ADA STANDARD GDOT
DETAILS.
3. ALL WORK PERFORMED WITHIN CITY R/W SHALL CONFORM TO CITY STANDARDS
AND DETAILS.
NOTICE
1. UTILITY RELOCATIONS MUST BE PERMITTED THROUGH THE CITY ENGINEER.
2. UTILITY OWNERS MUST PROVIDE THE CITY THE PERMIT NUMBER TO ANY GUPS
PERMITS AS PART OF THE WORK DESCRIPTION.
3. PRIOR TO EARTH DISTURBING ACTIVITIES, ALL UNDERGROUND UTILITIES ARE
TO BE LOCATED BY THE UTILITY OWNER OR A "LOCATES" FIRM WHETHER THE
UTILITY IS SHOWN ON THE PLANS OR NOT.
4. ALL UTILITIES RELOCATED OR NEWLY INSTALLED SHALL BE IN ACCORDANCE
WITH THE GDOT UTILITY MANUAL, CURRENT EDITION, AT NO COST TO THE
CITY OF NEWNAN.
UTILITY PLANS
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
GENERAL NOTES
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
04-0002GEORGIA
1. THE COMPLETE SIGNAL INSTALLATION SHALL CONFORM TO ALL APPROPRIATE
PARTS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES CURRENT
EDITION.
2. SIGNAL HEADS SHALL BE ERECTED TO PROVIDE AT LEAST 17 FEET BUT NO
MORE THAN 19 FEET CLEARANCE FROM BOTTOM OF SIGNAL HEADS TO TOP OF
ROAD SURFACE AND A MINIMUM OF 8 FEET MEASURED HORIZONTALLY BETWEEN
CENTERS OF SIGNAL FACES.
3. SHIELDED CABLE WILL BE USED FOR DETECTOR RUNS AS SHOWN ON THE
DETAIL SHEET, DETECTORS SHALL HAVE SEPARATE LEAD-INS TO THE CONTROL
CABINET.
4. THE CONTRACTOR SHALL LOCATE UNDERGROUND UTILITIES IN VICINITY OF NEW
TRAFFIC SIGNAL POLES PRIOR TO ORDERING. AT THE DISCRETION OF THE
ENGINEER, MINOR SHIFTS, (UP TO A MAXIMUM OF 5 FEET), IN LOCATION
OF NEW SIGNAL POLES, ARE ACCEPTABLE TO AVOID UNDERGROUND UTILITIES.
MINIMUM CLEARANCES FROM EDGE OF PAVEMENT SHALL BE MAINTAINED.
PLACEMENT OF THE SIGNAL HEADS SHALL BE RETAINED AS SHOWN ON THE
PLANS.
5. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL NEW GUYS ON EXISTING
UTILITY TIMBER POLES WHEN ATTACHING SPAN WIRE OR INTERCONNECT CABLE
TO THE POLES UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
6. INSTALLATION IS TO BE CHECKED AND ACCEPTED BY THE CITY ENGINEER
PRIOR TO FINAL ACCEPTANCE.
7. MATERIAL CERTIFICATION IS REQUIRED PRIOR TO BEGINNING ANY SIGNAL
INSTALLATION WORK. THE CONTRACTOR SHALL FOLLOW PROCEDURES OUTLINED
IN THE DOT SPECIFICATION.
8. ALL EXISTING STOP BARS, WORDS, ARROWS AND CROSSWALKS THAT ARE NOT
REMOVED OR RELOCATED SHALL BE REPLACED IN ACCORDANCE WITH CURRENT
GDOT STANDARDS AND DIRECTED TO THE CITY ENGINEER.
9. PROPOSED SIGNAL SUPPORT WIRE ATTACHMENT HEIGHTS ON POLES ARE
PROVIDED AS GENERAL GUIDELINES TO INSTALLER, ACTUAL ATTACHMENT
HEIGHTS SHALL BE FIELD DETERMINED BY INSTALLER TO PROVIDE REQUIRED
SIGNAL HEAD MOUNTING HEIGHTS AND CLEARANCE FROM EXISTING UTILITIES.
10. SAWCUTS AND REMOVAL OF ALL CONCRETE ASSOCIATED WITH CURB CUT RAMPS
SHALL BE INCLUDED IN THE SIDEWALK PAY ITEM.
11. THE CONTRACTOR SHALL REPLACE IN KIND AND SIZE, AT NO SEPARATE
EXPENSE TO THE CITY, ANY BARRIER WALL, FENCE, DITCH PAVING,
CURBING, SIDEWALK, GUTTER, SLOPE PAVEMENT, SIGNS, GUARDRAILS,
LANDSCAPING, GRASSINGS, UTILITY SERVICE LINES, STORM DRAIN PIPES,
MASONRY WALLS AND PAVING THAT IS REMOVED, DAMAGED OR DESTROYED, DUE
TO CONTRACTOR'S ACTIVITY.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL
MEASURES TO ENSURE COMPLIANCE TO ALL STATE AND FEDERAL LAWS AND
GUIDELINES. THE COST SHALL BE CONSIDERED INCIDENTAL AND BE INCLUDED
IN THE OVERALL BID PRICE. NO ADDITIONAL PAYMENTS SHALL BE MADE TO
THE CONTRACTOR FOR EROSION CONTROL.
13. ALL TRAFFIC MARKING, SYMBOLS OR STRIPING TO BE REMOVED AND/OR
REPLACED SHALL BE PAID FOR IN THE TRAFFIC CONTROL LUMP SUM ITEM.
TRAFFIC SIGNAL GENERAL NOTES
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
SUMMARY OF QUANTITIES
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
06-0001GEORGIA
DESCRIPTION UNIT QUANTITYNUMBER
636-1041 HIGHWAY SIGNS, TP 2 MATL. REFL SHEETING, TP 9
STEEL STRAIN POLE, TP IV w/ 65 FT MAST ARM, BLACK POWDER COATED
SF
EA
NOTE: QUANTITIES ARE ESTIMATES AND SHOULD BE VERIFIED BY CONTRACTOR
TRAFFIC SIGNAL INSTALLATION NO. 1 LS 1
MICROWAVE VEHICLE DETECTION SYSTEM NO. 1 LS 1
A. MOUNTING ASSEMBLY EA 6
B. CABLES LF 750
TRAFFIC SIGNAL
639-3004
647-1000
937-6010
PEDESTRIAN DETECTION SYSTEM NO. 1937-4100
C. 3-PAIR LOOP LEAD-IN CABLE, 18 AWG, PER 1000 FT.
LS 1
EA 8
EA 4
D. PUSH BUTTON STATION ASSEMBLY WITH SIGN
I. PEDESTRIAN PUSH BUTTON STATION ADAPTER, 4 IN PEDESTAL POLE, ADJUSTABLE (BLACK)
REEL 1
PULL BOX, TYPE 5 EA 1682-2150
CONDUIT, NONMETL, TP 3, 2 IN LF 1020682-6233
CONDUIT, NONMETL, TP 3, 1 IN LF 680682-6230
CONDUIT, NONMETL, TP 2, 2 IN LF 155682-6222
CONDUIT, NONMETL, TP 2, 1 IN LF 85682-6219
DIRECTIONAL BORE, 7 IN LF 340682-9950
CONDUIT, RIGID, 1 IN LF 50682-6110
PULL BOX, TYPE 4S EA 3682-2145
STEEL STRAIN POLE, TP IV w/ 50 FT MAST ARM, BLACK POWDER COATED EA 1639-3004
STEEL STRAIN POLE, TP IV w/ 30 FT MAST ARM, BLACK POWDER COATED EA 1639-3004
DESCRIPTION UNIT QUANTITYNUMBER
636-1041 HIGHWAY SIGNS, TP 2, MATL. REFL SHEETING, TP 9 SF 7.5
SIGNING & MARKING
THERMOPLASTIC SOLID TRAF STRIPE, 8 IN, WHITE LF 1680653-1804
THERMOPLASTIC SOLID TRAF STRIPE, 24 IN, WHITE LF 990653-1704
610-6515 REMOVE HIGHWAY SIGN, STD EA 3
DESCRIPTION UNIT QUANTITYNUMBER
TACK COAT
SY 7670
CONSTRUCTION
CONC SIDEWALK, 6 IN SY 1006
MILL ASPH CONC PVMT, 1 1/2 IN DEPTH
GL 384
402-3130 RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM MATL & H LIME TN 633
THERMOPLASTIC SOLID TRAF STRIPE, 6 IN, WHITE LF 1880653-1906
THERMOPLASTIC SOLID TRAF STRIPE, 6 IN, YELLOW LF 1550653-2602
CONC CURB & GUTTER, 8 IN X 30IN, TP2 LF 130
NOTE: ESTABLISHING FINAL GRADE FOR SIDEWALK CONSTRUCTION IS INCIDENTAL TO INSTALLATION OF SIDEWALK (441-0106).
DETECTABLE WARNING SURFACES ARE INCIDENTAL TO INSTALLATION OF SIDEWALK (441-0106)
413-0750
432-0206
441-0106
441-6222
150-1000 TRAFFIC CONTROL LS 1
THERMOPLASTIC SKIP TRAF STRIPE, 6 IN, WHITE GLF 1865653-2611
RAISED PVMT MARKERS TP 3 EA 52654-1003
THERMOPLASTIC PVMT MARKING, ARROW, TP 2 EA 8653-0120
NEWNAN CROSSING BLVD
(45 MPH)
NEWN
AN
CROS
SING
BL
VD
(45
MPH)
D I P L O M A T
P K W Y
M P H
ST
ON
EB
RI
DG
E
CR
OS
SI
NG
(2
MP
H)
30 120
SCALE IN FEET
0 60 13-0001GEORGIA
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
CONSTRUCTION PLANS
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
TYPE B RAMP
(GDOT DET. A3)
LIMIT OF CONSTRUCTION
END SIDEWALK. TIE
TO EXISTING SIDEWALK
STA. 3+90.02
OFFSET=129.82'R
N:1232227.06 E:2118336.51
BEGIN 5' SIDEWALK
STA. 4+84.16
OFFSET=62.32'R
N:1232313.25 2118402.50
END 5' SIDEWALK
END TYPE 2 CURB & GUTTER
STA. 3+91.73
OFFSET=74.14'L
N:1232422.79 E:2118279.13
BEGIN 5' SIDEWALK. TIE TO
EXISTING SIDEWALK.
STA. 4+59.84
OFFSET=80.06'L
N:1232447.25 E:2118348.53
BEGIN 5' SIDEWALK
BEGIN TYPE 2 CURB & GUTTER
STA. 3+78.97
OFFSET=59.58'L
N:1232404.87 E:2118270.40
END 5' SIDEWALK. TIE TO
EXISTING SIDEWALK.
STA. 4+84.15
OFFSET=69.75'L
N: 1232442.68 E:2118376.24
BEGIN PROJECT
STA. 0+00
OFFSET=39.77'R
N:1232137.83 E:2117981.24
END PROJECT
STA. 8+62.18
OFFSET=44.89'L
N:1232491.90 E:2118751.56
LIMIT OF CONSTRUCTION
STA. 4+24.33
OFFSET=87.60'L
N:1232445.35 E:2118309.35
BEGIN TYPE 2 CURB & GUTTER
STA. 4+53.03
OFFSET=73.72'L
N:1232439.43 E:2118342.82
END TYPE 2 CURB & GUTTER
STA. 4+84.17
OFFSET=59.17'L
N:1232432.32 E:2118378.36
TYPE B RAMP
(GDOT DET. A3)
BEGIN TYPE 2 CURB
& GUTTER
STA. 3+80.12
OFFSET=53.22'R
N:1232297.61 E:2118305.34
END TYPE 2 CURB &
GUTTER
STA. 3+99.21
OFFSET=72.09'R
N:1232284.75 E:2118327.94
BEGIN TYPE 2 CURB
& GUTTER
STA. 4+83.07
OFFSET=52.29'R
N:1232322.87 E:2118399.49
END TYPE 2 CURB &
GUTTER
STA. 4+57.23
OFFSET=69.53'R
N:1232300.87 E:2118379.44
BEGIN TYPE 2 CURB & GUTTER
STA. 3+82.04
OFFSET=49.58'L
N:1232396.29 E:2118276.48
END TYPE 2 CURB & GUTTER
STA. 4+01.16
OFFSET=71.56'L
N:1232423.19 E:2118289.56
STA. 3+88.78
OFFSET=102.93'R
STA. 3+85.94
OFFSET=109.55'R
STA. 3+86.23
OFFSET=119.88'R
STA. 3+94.35
OFFSET=103.10'R
STA. 3+89.39
OFFSET=110.78'R
STA. 3+90.58
OFFSET=121.05'R
END 5' SIDEWALK. TIE
TO EXISTING TRAIL
STA. 4+67.90
OFFSET=106.84'R
N:1232266.61 E:2118397.14
STA. 4+69.73
OFFSET=124.57'R
TIE TO EXISTING SIDEWALK
STA. 4+72.67
OFFSET=119.32'R
STA. 4+72.25
OFFSET=115.62'RSTA. 3+86.02
OFFSET=125.25'R
STA. 4+69.03
OFFSET=117.33'R
STA. 4+72.71
OFFSET=104.29'R
STA. 4+68.59
OFFSET=98.24'R
STA. 4+63.13
OFFSET=99.77'R
BEGIN 5' SIDEWALK
STA. 3+80.94
OFFSET=63.19'R
N:1232288.32 E:2118309.06
MILL & OVERLAY, 1-1/2 IN DEPTH
885885
890885
883 884
NEWNAN CROSSING BLVD
(45 MPH)
NEWN
AN
CROS
SING
BL
VD
(45
MPH)
D I P L O M A T
P K W Y
M P H
ST
ON
EB
RI
DG
E
CR
OS
SI
NG
(2
MP
H)
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
CONTOUR MAP
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
13-0002GEORGIA 30 120
SCALE IN FEET
0 60
E(B) E(B)
E(B) E(B)
E(B) E(B)
E(B)
T(B)
T(B) T(B)
T(B) T(B) T(B)
T(B) T(B)
T(B) T(B) T(B) T(B)
T(B) T(B)
T(B) T(B)
T(B) T(B)
T(B) T(B) T(B) T(B)
W(B) W(B)
W(B) W(B) W(B)
THT
E
W
W
WW
W
HTT WWW
W
W
HT
WWW T
SS
S T
SS
S T
S T
S T
SS(C
SS(C
SS(C
S TS T
S T
SS(C)
SS(C)
SS(C)
S T
S T
S T
S T
S T
S T
SS(C)
SS(C)
SS(C)
SS
(C
SS
(C
SS(D) SS(D) SS(D) SS(D) SS(D) SS(D)
HT
SS
SS
T(B)
S T
NEWNAN CROSSING BLVD
(45 MPH)
NEWN
AN
CROS
SING
BL
VD
(45
MPH)
D I P L O M A T
P K W Y
M P H
ST
ON
EB
RI
DG
E
CR
OS
SI
NG
(2
MP
H)
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
UTILITY PLANS
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
30 120
SCALE IN FEET
0 60 24-0001GEORGIA
NEWNAN CROSSING BLVD
(45 MPH)
NEWN
AN
CROS
SING
BL
VD
(45
MPH)
D I P L O M A T
P K W Y
M P H
ST
ON
EB
RI
DG
E
CR
OS
SI
NG
(2
MP
H)
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
SIGNING & MARKING PLAN
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
30 120
SCALE IN FEET
0 60 26-0001GEORGIA
REMOVE EXISTING R1-1
SIGN
REMOVE EXISTING
R1-1 SIGN
REMOVE EXISTING
SIGN
INSTALL:
R2-1 (30X36) N:1232231.2850 E:2118339.7779
STRIPE IN ACCORDANCE
WITH GDOT DETAIL T-14,
DETAIL "B" (WHITE)
CROSSWALK PER GDOT
DETAIL T-11A (TYP)
SPEED
LIMIT
TP 2 TRAFFIC
ARROW (TYP)
6 IN. SOLID WHITE w/
TYPE 3 CLR/RED RPMS
1EA 20' O.C
6 IN. SOLID
WHITE (TYP)
6 IN. DOUBLE
YELLOW
6 IN. SOLID
WHITE (TYP)
6 IN SOLID
WHITE
24 IN. SOLID
WHITE
6 IN. SOLID WHITE
24 IN. SOLID
WHITE (TYP)
REMOVE EXISTING "STOP" &
"AHEAD" MARKING 240'/210' NORTH
OF INTERSECTION
24 IN. SOLID WHITE
6 IN. SKIP WHITE
10' SEG, (30' GAP) w/
TYPE 3 CLR/RED RPMS
15' FROM SKIP (40' O.C.)
6 IN. SKIP WHITE
2' SEG (6' GAP)
6 IN. SKIP WHITE
10' SEG, (30' GAP) w/
TYPE 3 CLR/RED RPMS
15' FROM SKIP (40' O.C.)
6 IN. SOLID YELLOW
6 IN. SKIP WHITE
2' SEG (6' GAP)
6 IN. SKIP WHITE
2' SEG (6' GAP)
6 IN. SKIP WHITE
2' SEG (6' GAP)
6 IN. SOLID YELLOW
6 IN. SKIP WHITE
10' SEG, (30' GAP) w/
TYPE 3 CLR/RED RPMS
15' FROM SKIP (40' O.C.)
6 IN. SKIP WHITE
10' SEG, (30' GAP) w/
TYPE 3 CLR/RED RPMS
15' FROM SKIP (40' O.C.)
6 IN. SOLID WHITE
STRIPE IN ACCORDANCE
WITH GDOT DETAIL T-14,
DETAIL "B" (WHITE)
6 IN. SOLID WHITE w/
TYPE 3 CLR/RED RPMS
1EA 20' O.C
6 IN. SOLID WHITE
t t t t t t t t t t t t t t t t t t t t t t t t t t
NEWNAN CROSSING BLVD
(45 MPH)
NEWN
AN
CROS
SING
BL
VD
(45
MPH)
D I P L O M A T
P K W Y
M P H
ST
ON
EB
RI
DG
E
CR
OS
SI
NG
(2
MP
H)
R10-12a
D3-1 #4
D3-1 #5
D3-1 #2
R a
D
D
R D S
RDS 8
R2C
R2B
R2A
R6B R6A
R1
R
R A
R B
R C
RDS 2
RDS 6
RDS 2
RDS 1
R10-12a
D3-1 #3
2A 1
4 4 4A
8 86S
P4
P6 P6
P8
P8
P2P2
P4
3/1/2022
Aaron Karnowski
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
SIGNAL LEGEND DETECTION LEGEND TRAFFIC SIGNAL PLAN
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
6 X 40 DETECTION ZONE
6 X 6 DETECTION ZONE
PEDESTAL POLE & SIGNAL
3-SECT. HEAD W/ BACKPLATE
t t t
PULLBOX, TP 2
RADAR DETECTION UNIT
30 120
SCALE IN FEET
0 60 27-0001
R10-3E(L) 9"x15"
R10-3E(R) 9"x15"
PEDESTRIAN SIGNSREGULATORY SIGNS
R10-12A 30"x36"
12"
12"
G
R
Y
2,4,6,6S,8
LED SIGNAL HEADS WITH
2" RETRO-REFLECTIVE BORDER ON BACKPLATE
12"
P2,P4,P6,P8
18"
PEDESTRIAN HEADS
08070605
030201
PHASING DIAGRAM
OMIT
R
Y 12"
12"
12"
OMIT
4-SECT. HEAD W/ BACKPLATE 332A CONTROLLER CABINET
STRAIN POLE, TP IV
W/ MAST ARM
PULLBOX, TP 5
PULLBOX, TP 4S
CONDUIT, BORED
OVERHEAD SIGN
OVERHEAD STREET NAME SIGNS
G
R
Y 12"
12"
12"
FY
12"
FY
2A,4A
GEORGIA
6'x40' DETECTION
ZONE (TYP)
6'x6' DETECTION ZONE
330' FROM STOP BAR (TYP)
INSTALL: 10' PEDESTAL POLE
LED COUNTDOWN PEDESTRIAN SIGNAL (P6)
ACCESSIBLE PEDESTRIAN SIGNAL & SIGN
CONDUIT, NM, TP2, 2-2" (30 LF) &
1-1" (15 LF)
PULLBOX, TP 2
INSTALL: STEEL STRAIN POLE, TP IV w/ 50' MAST ARM
STA: 3+83.85, 69.71 RT
COUNTDOWN PEDESTRIAN SIGNALS (P4,P6)
ACCESSIBLE PUSHBUTTON STATIONS & SIGNS
CONDUIT, NM, TP3, 3-2" (300 LF) & 2-1" (200 LF)
IN 7" DIRECTIONAL BORE (100 LF)
PULL BOX, TP 4S
CONDUIT, NM, TP2, 3-2" (15 LF) & 2-1" (10 LF)
INSTALL: STEEL STRAIN POLE, TP IV w/ 65' MAST ARM
RADAR DETECTION SYSTEMS (RDS 2,6,8)
STA: 4+95.25, 61.60 RT
CONDUIT, NM, TP3, 3-2" (420 LF) & 2-1" (280 LF)
IN 7" DIRECTIONAL BORE (140 LF)
PULL BOX, TP 4S
CONDUIT, NM, TP2, 3-2" (15 LF) & 2-1" (10 LF)
INSTALL: STEEL STRAIN POLE, TP IV w/ 65' MAST ARM
RADAR DETECTION SYSTEMS (RDS 1,2)
STA: 3+83.76, 64.42 LT
COUNTDOWN PEDESTRIAN SIGNAL (P4)
ACCESSIBLE PUSHBUTTON STATION & SIGN
CONDUIT, NM, TP3, 3-2" (300 LF) & 2-1" (200 LF)
IN 7" DIRECTIONAL BORE (100 LF)
PULL BOX, TP 4S
CONDUIT, NM, TP2, 3-2" (15 LF) & 2-1" (10 LF)
INSTALL: 10' PEDESTAL POLE
LED COUNTDOWN PEDESTRIAN SIGNAL (P2)
ACCESSIBLE PEDESTRIAN SIGNAL & SIGN
CONDUIT, NM, TP2, 2-2" (20 LF) & 1-1" (10 LF)
PULLBOX, TP 2
INSTALL: 10' PEDESTAL POLE
LED COUNTDOWN PEDESTRIAN SIGNAL (P8)
ACCESSIBLE PEDESTRIAN SIGNAL & SIGN
CONDUIT, NM, TP2, 2-2" (10 LF) &
1-1" (5 LF)
PULLBOX, TP 2
INSTALL: 332A CABINET BASE w/ UPS EXTENSION, 2070LX CONTROLLER w/ AUX FILE
UNINTERRUPTIBLE POWER SUPPLY, EXTERNAL
CONDUIT, NM, TP2, 5-2" (25 LF)
& 2-1" (10 LF)
PULLBOX, TP 5
INSTALL: STEEL STRAIN POLE, TP IV w/
35' MAST ARM
RADAR DETECTION SYSTEMS (RDS 4)
STA: 3+83.76, 64.42 LT
COUNTDOWN PEDESTRIAN SIGNAL (P2)
ACCESSIBLE PUSHBUTTON STATION & SIGN
CONDUIT, NM, TP2, 3-2" (15 LF) & 2-1" (10 LF)
D3-1 #5 24"x120"
D3-1 #1 (24"x120")
D3-1 #2 (24"x08")
D3-1 #4 (24"x108") D3-1 #5 (24"x120")
D3-1 #3 (24"x120")
INSTALL: 10' PEDESTAL POLE
LED COUNTDOWN PEDESTRIAN SIGNAL (P8)
ACCESSIBLE PEDESTRIAN SIGNAL & SIGN
CONDUIT, NM, TP2, 2-2" (10 LF) &
1-1" (5 LF)
PULLBOX, TP 2
INSTALL: 4' PEDESTAL POLE w/ POWER
METER, RUN POWER TO NEAREST SOURCE
CONDUIT, RIGID, 1-1" (50 LF)
6'x6' DETECTION ZONE
330' FROM STOP BAR (TYP)
AutoCAD SHX Text DRAWING No.
AutoCAD SHX Text
TO CROSS
AutoCAD SHX Text
PUSH BUTTON
AutoCAD SHX Text
START CROSSING
AutoCAD SHX Text
DON'T START
AutoCAD SHX Text
FINISH CROSSING
AutoCAD SHX Text
IF STARTED
AutoCAD SHX Text
FLASHING
AutoCAD SHX Text
STEADY
AutoCAD SHX Text
WATCH FOR
AutoCAD SHX Text
VEHICLES
AutoCAD SHX Text
DON'T CROSS
AutoCAD SHX Text
TIMER
AutoCAD SHX Text
TO FINISH CROSSING
AutoCAD SHX Text
TIME REMAINING
AutoCAD SHX Text
AutoCAD SHX Text
START CROSSING
AutoCAD SHX Text
STEADY
AutoCAD SHX Text
WATCH FOR
AutoCAD SHX Text
VEHICLES
AutoCAD SHX Text
DON'T CROSS
AutoCAD SHX Text
DON'T START
AutoCAD SHX Text
FINISH CROSSING
AutoCAD SHX Text
IF STARTED
AutoCAD SHX Text
FLASHING
AutoCAD SHX Text
TIMER
AutoCAD SHX Text
TO FINISH CROSSING
AutoCAD SHX Text
TIME REMAINING
AutoCAD SHX Text
AutoCAD SHX Text
TO CROSS
AutoCAD SHX Text
PUSH BUTTON
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
W
Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09.dwg10:16:10 AM
CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
REVISION DATES
GPLOT-V8
gplotborder-v8I-PO.tbl ########
JMK
JMK
AMK
JMK
07/10/2026
07/10/2026
07/10/2026
07/10/2026
TRAFFIC SIGNAL DETAILS
NEWNAN CROSSING BLVD @
DIPLOMAT PKWY / STONEBRIDGE XING
27-0002
332 CABINET INPUT ASSIGNMENT
DESCRIPTION UNIT QUANTITY
LIST OF MATERIALS
SIGNAL CABINET ASSEMBLIES
BATTERY BACKUP SYSTEM-EXTERNAL MOUNTED, CABINET (PER GDOT SPECS)
3-SECTION, 12" SIGNAL FACE LED - ALL BLACK HOUSING & FRONT, POLYCARBONATE
3-SECTION, 12" SIGNAL FACE LED - FYA - ALL BLACK HOUSING & FRONT FRONT, POLYCARBONATE
4-SECTION, 12" SIGNAL FACE LED - FYA - ALL BLACK HOUSING & FRONT, POLYCARBONATE
BACKPLATE FOR 3-SECTION, 12" SIGNAL FACE - ABS POLYCARBONATE, BLACK W/ RETROREFLECTIVE STRIP
BACKPLATE FOR 4-SECTION, 12" SIGNAL FACE - ABS POLYCARBONATE, BLACK W/ RETROREFLECTIVE STRIP
HARDWARE FOR MAST ARM MOUNTING
1-SECTION, 18" x 18" PEDESTRIAN SIGNAL FACE HOUSING, W/ 16" LED COUNTDOWN INSERT, FULL HAND/MAN OVERLAP, BLACK
PULL BOX, PB-2
10' PEDESTAL POLE w/ SQUARE BASE, BLACK POWDER COATED
G. DC ISOLATOR 3EA
2EA
1EA
9EA
1EA
1EA
11EA
12EA
8EA
4EA
4EA
HARDWARE FOR PEDESTAL POLE, TOP POST MOUNTING, ONE-WAY BRACKET ASSEMBLY, BLACK 4EA
C. SWITCH PACK 8EA
332 PREFABRICATED CONTROLLER BASE 1EA
MISCELLANEOUS MATERIALS NEEDED TO COMPLETE INSTALLATION LUMPLS
K. 2010 SIGNAL MONITOR, TYPE B (ETHERNET) 1EA
SIGNAL CONTROLLER UNITS
A. CONTROLLER UNIT, 2070 LX 1EA
A. CABINET ASSEMBLY, MODEL 332A 1EA
SIGNAL CABLE (14 AWG); 7 CONDUCTOR, PER 1000 FT. 1REEL
HARDWARE FOR SIDE-OF-POLE MOUNTING, TWO-WAY BRACKET ASSEMBLY - STEEL POLE 1EA
D3-1 #1 (24"x120")
D3-1 #2 (24"x08")
D3-1 #4 (24"x108") D3-1 #5 (24"x120")
D3-1 #3 (24"x120")
OVERHEAD STREET NAME SIGN DETAIL
HARDWARE FOR SIDE-OF-POLE MOUNTING, ONE-WAY BRACKET ASSEMBLY - STEEL POLE 2EA
DESCRIPTION UNIT QUANTITYNUMBER
636-1041 HIGHWAY SIGNS, TP 2 MATL. REFL SHEETING, TP 9
STEEL STRAIN POLE, TP IV w/ 65 FT MAST ARM, BLACK POWDER COATED
SF
EA
NOTE: QUANTITIES ARE ESTIMATES AND SHOULD BE VERIFIED BY CONTRACTOR
TRAFFIC SIGNAL INSTALLATION NO. 1 LS 1
MICROWAVE VEHICLE DETECTION SYSTEM NO. 1 LS 1
A. MOUNTING ASSEMBLY EA 6
B. CABLES LF 750
PAY ITEMS
639-3004
647-1000
937-6010
PEDESTRIAN DETECTION SYSTEM NO. 1937-4100
C. 3-PAIR LOOP LEAD-IN CABLE, 18 AWG, PER 1000 FT.
LS 1
EA 8
EA 4
D. PUSH BUTTON STATION ASSEMBLY WITH SIGN
I. PEDESTRIAN PUSH BUTTON STATION ADAPTER, 4 IN PEDESTAL POLE, ADJUSTABLE (BLACK)
REEL 1
PULL BOX, TYPE 5 EA 1682-2150
CONDUIT, NONMETL, TP 3, 2 IN LF 1020682-6233
CONDUIT, NONMETL, TP 3, 1 IN LF 680682-6230
CONDUIT, NONMETL, TP 2, 2 IN LF 155682-6222
CONDUIT, NONMETL, TP 2, 1 IN LF 85682-6219
DIRECTIONAL BORE, 7 IN LF 340682-9950
CONDUIT, RIGID, 1 IN LF 50682-6110
PULL BOX, TYPE 4S EA 3682-2145
STEEL STRAIN POLE, TP IV w/ 50 FT MAST ARM, BLACK POWDER COATED EA 1639-3004
STEEL STRAIN POLE, TP IV w/ 30 FT MAST ARM, BLACK POWDER COATED EA 1639-3004
GEORGIA
AutoCAD SHX Text DRAWING No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
C1 PIN
AutoCAD SHX Text
FUNCTION
AutoCAD SHX Text
FIELD TERM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FLASH
AutoCAD SHX Text N/C
AutoCAD SHX Text
TB8 4,6
AutoCAD SHX Text
TB6 9,10
AutoCAD SHX Text
TB6 5,6
AutoCAD SHX Text
TB6 1,2
AutoCAD SHX Text
TB4 9,10
AutoCAD SHX Text
TB4 5,6
AutoCAD SHX Text
TB4 1,2
AutoCAD SHX Text
TB2 9,10
AutoCAD SHX Text
TB2 5,6
AutoCAD SHX Text
TB2 1,2
AutoCAD SHX Text
CHANNEL 1
AutoCAD SHX Text
C1 PIN
AutoCAD SHX Text
FUNCTION
AutoCAD SHX Text
FIELD TERM
AutoCAD SHX Text N/C
AutoCAD SHX Text
CHANNEL 2
AutoCAD SHX Text
C1 PIN
AutoCAD SHX Text
FUNCTION
AutoCAD SHX Text
FIELD TERM
AutoCAD SHX Text
CHANNEL 1
AutoCAD SHX Text
C1 PIN
AutoCAD SHX Text
FUNCTION
AutoCAD SHX Text
FIELD TERM
AutoCAD SHX Text
CHANNEL 2
AutoCAD SHX Text
SLOT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
CARD
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
CARD
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
TBA
AutoCAD SHX Text
TBA
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC ISO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TB8 7,9
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DET
AutoCAD SHX Text
TBA
AutoCAD SHX Text
TBA
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
DC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TB3 1,2
AutoCAD SHX Text
TB3 5,6
AutoCAD SHX Text
TB3 9,10
AutoCAD SHX Text
TB5 1,2
AutoCAD SHX Text
TB5 5,6
AutoCAD SHX Text
TB5 9,10
AutoCAD SHX Text
TB7 1,2
AutoCAD SHX Text
TB7 5,6
AutoCAD SHX Text
TB7 9,10
AutoCAD SHX Text
TB9 4,6
AutoCAD SHX Text
TB9 10,12
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TB3 3,4
AutoCAD SHX Text
TB3 7,8
AutoCAD SHX Text
TB3 11,12
AutoCAD SHX Text
TB5 3,4
AutoCAD SHX Text
TB5 7,8
AutoCAD SHX Text
TB5 11,12
AutoCAD SHX Text
TB7 3,4
AutoCAD SHX Text
TB7 7,8
AutoCAD SHX Text
TB7 11,12
AutoCAD SHX Text
TB9 5,6
AutoCAD SHX Text
TB9 8,9
AutoCAD SHX Text
TB9 11,12
AutoCAD SHX Text
UPPER INPUT FILE
AutoCAD SHX Text
LOWER INPUT FILE
AutoCAD SHX Text
STOP TIME
AutoCAD SHX Text
TB2 3,4
AutoCAD SHX Text
TB2 7,8
AutoCAD SHX Text
TB2 11,12
AutoCAD SHX Text
TB4 3,4
AutoCAD SHX Text
TB4 7,8
AutoCAD SHX Text
TB4 11,12
AutoCAD SHX Text
TB6 3,4
AutoCAD SHX Text
TB6 7,8
AutoCAD SHX Text
TB6 11,12
AutoCAD SHX Text
TB8 5,6
AutoCAD SHX Text
TB8 8,9
AutoCAD SHX Text
TB9 7,9
AutoCAD SHX Text
RADAR
AutoCAD SHX Text
RADAR
AutoCAD SHX Text
RADAR
AutoCAD SHX Text R2A
AutoCAD SHX Text R4A
AutoCAD SHX Text R6A
AutoCAD SHX Text
04 PED
AutoCAD SHX Text
DC ISO
AutoCAD SHX Text
08 PED
AutoCAD SHX Text
02 PED
AutoCAD SHX Text
06 PED
AutoCAD SHX Text
DC ISO
AutoCAD SHX Text R2B
AutoCAD SHX Text R6B
AutoCAD SHX Text
RADAR
AutoCAD SHX Text
RADAR
AutoCAD SHX Text R1
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 15"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 42.8"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 24.5"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 108"
AutoCAD SHX Text 7.5"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 24"
AutoCAD SHX Text 5.5"
AutoCAD SHX Text 12"B
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 5.5"
AutoCAD SHX Text 12"B
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 24"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 42.8"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 24.5"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 15"
AutoCAD SHX Text 6.4"
AutoCAD SHX Text 108"
AutoCAD SHX Text 7.5"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 5.5"
AutoCAD SHX Text 12"B
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 24"
AutoCAD SHX Text 120"
AutoCAD SHX Text 6.2"
AutoCAD SHX Text 33.4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 36"
AutoCAD SHX Text 5"
AutoCAD SHX Text 18.5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4.6"
AutoCAD SHX Text 6.2"
AutoCAD SHX Text 7.5"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 57.4"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 20.9"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 15"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 5.5"
AutoCAD SHX Text 12"B
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 24"
AutoCAD SHX Text 120"
AutoCAD SHX Text 7.5"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 5.5"
AutoCAD SHX Text 12"B
AutoCAD SHX Text 6.5"
AutoCAD SHX Text 24"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 15"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 57.4"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 20.9"
AutoCAD SHX Text 6.7"
AutoCAD SHX Text 120"
AutoCAD SHX Text R4C
AutoCAD SHX Text R4B
AutoCAD SHX Text
RADAR
AutoCAD SHX Text R8
AutoCAD SHX Text
RADAR
R2C
| Sheets and Views |
| Newnan Crossing & Diplomat Pkwy Signal Plan 2026.07.09-27-0002 |
File details come from the government source that posted it. Updated .