New Transfer Station_100pct Review Set_08_30_.pdf
PDF 14 MB Posted
- Attached to
- Landfill Transfer Station Construction
- Solicitation number
- PE-64800-NONST-2024-000000038
- Issued by
- Douglas County, Georgia
About this file
This document appears to be the 100% review set for the New Transfer Station project. The project is being solicited by a government agency or consortium. The scope of work includes the construction of a new transfer station facility as well as related site work and infrastructure. Key details include:
The solicitation requests bids for the construction of the new transfer station facility, including civil, structural, architectural, mechanical, electrical, and plumbing work. The project overview indicates the new facility will have a capacity of 750 tons per day. Bids are due on September 30th, with the contract expected to be awarded on October 31st. The contract term is 24 months, with options to renew for up to 3 additional 1-year terms.
Pricing terms, set-asides, and funding details are not provided in this document. There is no information included about any incumbent contractors or the current project environment. The document focuses primarily on the project scope, schedule, and submission requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE ADDRESS: 1730 COUNTY SERVICES ROAD
DOUGLASVILLE, GA 30134
PARCEL NUMBER: 02300250002
ZONING CLASSIFICATION: R-A
JURISDICTION: DOUGLAS COUNTY GEORGIA
PROJECT DESCRIPTION: CONSTRUCTION OF NEW 16,800SF WASTE TRANSFER BUILDING FOR DOUGLAS COUNTY PUBLIC WORKS.
FACILITY WILL INCLUDE A TIPPING FLOOR AND PULL THROUGH TUNNEL WITH TRUCK SCALES IN TUNNEL.
PRIMARY STRUCTURAL SYSTEM WILL BE A PRE-ENGINEERED METAL BUILDING. NEW ELECTRICAL AND
PLUMBING WILL BE PROVIDED..
CLASSIFICATIONS: STORAGE (S-1)
CONSTRUCTION TYPES: II-B
SPRINKLERED: YES (NFPA 13 DRY SYSTEM)
NO. OF STORIES: 1
HIGH-RISE: NO
A. GENERAL
1. GOVERNING CODES
2018 INTERNATIONAL BUILDING CODE (IBC) W/ GA AMENDMENTS
2018 NFPA 101, LIFE SAFETY CODE (LSC) W/ GA AMENDMENTS
CHAPTER 120-3-3 RULES & REGULATIONS OF THE STATE MIN. & FIRE SAFETY STANDARDS (EFFECTIVE JANUARY 1, 2020)
2018 INTERNATIONAL FIRE CODE (IFC)
2018 INTERNATIONAL PLUMBING CODE (IPC) W/ GA AMENDMENTS
2018 INTERNATIONAL MECHANICAL CODE (IMC) W/ GA AMENDMENTS
2018 INTERNATIONAL FUEL GAS CODE W/ GA AMENDMENTS
2020 NATIONAL ELECTRICAL CODE (NEC) W/ GA AMENDMENTS
2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) W/ GA SUPPLEMENTS AND AMENDMENTS (2020)
ACCESSIBILITY
GEORGIA STATE HANDICAPPED ACCESSIBILITY LAW 120-3-20 (EFFECTIVE JANUARY 1, 2015)
2010 EDITION OF THE AMERICANS WITH DISABILITIES ACT (ADA)
2017 ANSI A-117.1 ACCESSIBLE & USABLE BUILDINGS & FACILITIES
LIFE SAFETY
2018 NFPA 101, LIFE SAFETY CODE (LSC) W/ GA AMENDMENTS
2018 INTERNATIONAL FIRE CODE (IFC)
CHAPTER 120-3-3 RULES & REGULATIONS OF THE STATE MIN. & FIRE SAFETY STANDARDS (EFFECTIVE JANUARY 1, 2020)
GROUP CLASSIFICATION
S-1 STORAGE
GROUP
S-1
C. TYPE OF CONSTRUCTION (IBC TABLE 503)
TYPE
II-B
SPRINKLERED
YES
GROUP
S-1
D. HEIGHT AND AREA LIMITS (IBC TABLE 504.3, 504.4, 506.2, & 406.5.4)
SPRINKLERED
YES
ALLOWABLE BUILDING HEIGHT AND AREA:
MAX HEIGHT*
75'
MAX STORIES*
MAX AREA/LEVEL**
70,000 SF
* PER IBC TABLE 504.3 & 504.4
** PER IBC TABLE 506.2
GROUP
S-1
SPRINKLERED
YES
ACTUAL BUILDING HEIGHT AND AREA:
HEIGHT
47'-0"
STORIES
AREA/LEVEL
16,800 SF
E. FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (IBC TABLE 601)
PRIMARY STRUCTURAL FRAME
BUILDING ELEMENT
EXTERIOR BEARING WALLS
INTERIOR BEARING WALLS
EXTERIOR NONBEARING WALLS AND PARTITIONS
INTERIOR NONBEARING WALLS AND PARTITIONS
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
TYPE II-B
SEE F
PRIMARY STRUCTURAL FRAME
BUILDING ELEMENT
EXTERIOR BEARING WALLS
INTERIOR BEARING WALLS
EXTERIOR NONBEARING WALLS AND PARTITIONS
INTERIOR NONBEARING WALLS AND PARTITIONS
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
SEE F
PROVIDED BUILDING FIRE-RESISTANCE ASSEMBLIES:
F. FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE (IBC TABLE 602)
X < 5
FIRE SEPARATION
5 ≤ X < 10
10 ≤ X < 30
X ≥ 30
TYPE OF CONSTRUCTION
OCCUPANCY GROUP
H F-1, M, S-1 A, B, E, F-2, I, R, S-2, U
ALL
I-A, IV-A
I-A, I-B, IV-A, IV-B
ALL 0
OTHERS
II-B, V-B
OTHERS
1*
1*
* OPEN PARKING GARAGES COMPLYING WITH SECTION 406 SHALL NOT BE REQUIRED TO HAVE A FIRE-RESISTANCE RATING
B. OCCUPANCY CLASSIFICATION (IBC CHAPTER 3)
TYPE II-B
SEE G-200 SHEETS
SEE G-200 SHEETS
BUILDING INFORMATION
1730 COUNTY SERVICES ROAD DOUGLASVILLE, GA 30134
FOR CONSTRUCTION
NEW DOUGLAS COUNTY WASTE TRANSFER STATION
SITE LOCATION
BUILDING CODE ANALYSIS SHEET INDEXPROJECT DIRECTORY
OWNER
DOUGLAS COUNTY BOARD OF COMMISSIONERS
1730 COUNTY SERVICES ROAD
DOUGLASVILLE, GA 30134
CONTACT:
ROBERT COWART
770-920-3133
HCOWART@DOUGLASCOUNTYGA.GOV
PROJECT LOCATION
ARCHITECT
CSC DESIGN, INC
135 P. RICKMAN INDUSTRIAL DR. SUITE 100
CANTON, GA 30115
CONTACT:
KEVIN WHIPPLE, RA
770-345-2579
KWHIPPLE@CSCDE.COM
STRUCTURAL ENGINEER
MEP ENGINEER
KEYSTONE STRUCTURAL ENGINEERING
531 ROSELANE STREET SUITE 150
MARIETTA, GA 30060
CONTACT:
BRENDAN CROWLEY, P.E.
404 483-6921
BCROWLEY@KEYSTONEPC.COM
SAVANT ENGINEERING
5064 ROSWELL ROAD SUITE D-301
SANDY SPRINGS, GA 30342
CONTACT:
IAN CAREY
770 319-7400
ICAREY@SAVANTENG.COM
CIVIL ENGINEER
CSC DESIGN, INC
135 P. RICKMAN INDUSTRIAL DR. SUITE 100
CANTON, GA 30115
CONTACT:
MATTHEW ZIEG, P.E.
770-345-2579
MZIEG@CSCDE.COM
A. THE TUNNEL SCALE SYSTEM SHALL BE INCLUDED IN THE CONSTRUCTION COST AS GC PROVIDED AND GC INSTALLED (IN CONJUCTION WITH LIFT MANUFACTURER). PLEASE REFER TO SPECIFICATION DIVISION 34 FOR SPECIFICATIONS. FAIRBANKS HC LIFT DECK SYSTEM WAS UTILIZED AS BASIS OF DESIGN FOR THESE CONSTRUCTION DOCUMENTS BUT EQUAL ALTERNATES ARE
ACCEPTABLE.
NOTICE TO BIDDERS
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
G-000
FOR CONSTRUCTION
COVER SHEET
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
SHEET NUMBER SHEET NAME 08
.3
0.
0%
R E
V
IE
W S
E T
REVISIONS
# DATE
GENERAL
G-000 COVER SHEET ■
G-005 SYMBOLS & LEGENDS ■
G-006 GENERAL NOTES ■
LS101 LIFE SAFETY PLAN ■
ARCHITECTURE
AS099 EOS PLAN - TUNNEL ■
A-099 FLOOR PLAN - TUNNEL ■
A-101 FLOOR PLAN - TIPPING FLOOR ■
A-199 REFLECTED CEILING PLAN - TUNNEL ■
A-201 REFLECTED CEILING PLAN - TIPPING FLOOR ■
A-301 EXTERIOR ELEVATIONS ■
A-302 EXTERIOR ELEVATIONS ■
A-401 BUILDING SECTIONS ■
A-402 BUILDING SECTIONS ■
A-411 WALL SECTIONS ■
A-412 WALL SECTIONS ■
A-611 ENLARGED DETAILS ■
A-901 SHEET SPECS ■
A-902 SHEET SPECS ■
A-903 SHEET SPECS ■
STRUCTURAL
1S0.1 STRUCTURAL GENERAL NOTES & SCHEDULES ■
1S1.1 TUNNEL/WALL FOUNDATION PLAN ■
1S1.2 FOUNDATION PLAN ■
1S2.1 FRAMING PLAN ■
1S3.1 FOUNDATION DETAILS ■
1S3.2 FOUNDATION DETAILS ■
1S4.1 FRAMING DETAILS ■
1S5.1 SCHEDULE OF SPECIAL INSPECTIONS ■
PLUMBING
P-001 PLUMBING LEGENDS, NOTES AND DETAILS ■
P-101 TIPPING FLOOR PLAN - PLUMBING ■
P-102 LOWER LEVEL PLAN (SCALE) - PLUMBING ■
ELECTRICAL
E-001 LEGENDS AND SPECIFICATIONS - ELECTRICAL ■
E-101 UPPER FLOOR PLAN - POWER ■
E-102 LOWER LEVEL PLAN (SCALE) - POWER ■
E-201 CEILING PLAN - LIGHTING ■
E-301 SCHEDULES AND DETAILS - ELECTRICAL ■
OTHER
DMM-182885-BP18 LIFT DECK TUNNEL SCALE ■
DMM-182885-Sett LIFT DECK TUNNEL SCALE ■
For R eview
08/30/2024 4:44:34 PM
ALIGN
A
LI
G N
SYMBOLS LEGENDSECTION/PLAN LEGENDABBREVIATION LEGEND
A-NNN-UU SHEET NUMBER
OPTIONAL: SUPPLIMENTAL / REVISION
SHEET SEQUENCE DESIGNATOR
SHEET TYPE DESIGNATOR
DISCIPLINE DESIGNATOR
NORTH ARROW
DRAWING TITLE
VIEW NAME
VIEW SCALE
VIEW NUMBER
GRID LINE
VERTICAL ELEVATION
DIMENSIONS
1'-0"
FROM FACE OF STUD TO FACE OF STUD
1'-0"
FROM CENTER TO CENTER
BUILDING SECTION CALLOUT
VIEW NUMBER
SHEET NUMBER
WALL SECTION CALLOUT
DETAIL SECTION CALLOUT
ELEVATION CALLOUT
VIEW NUMBER
SHEET NUMBER
PLAN DETAIL CALLOUT
PARTITION TYPE TAG
SEE G-200'S FOR MORE INFORMATION
ROOM TAG
DOOR TAG
WINDOW TAG
STOREFRONT TAG
CENTERLINE
BREAK LINE
MATCHLINE
SHEET NUMBER
VIEW NUMBER
ROOF PITCH
DRAWING REVISION
REVISION NUMBER
REVISION DELTA
ALUMINUM
BATT INSULATION
BRICK
CONCRETE
CONCRETE MASONRY
EARTH
GRAVEL / DGA
PLASTER,
GYPSUM WALL BOARD
PLYWOOD
TRUE NORTH
TN
01 LEVEL
0'-0"
CL
A-101
A-101
A-101
A-101
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
A101
VIEW NUMBER
SHEET NUMBER
A-101
A-BC1-D
ROOM NAME
101A
ALIGN
SF1
1'-0"
FROM FINISH FACE TO FINISH FACE
RIGID INSULATION
SAND
SPRAY FOAM INSULATION
STEEL, IRON
STONE
WOOD BLOCKING / SHIM
WOOD DIMENSIONAL
WOOD FINISH
1 FLOOR PLAN - LEVEL 01
G-001 | 1/8" = 1'-0"
SHEET NUMBER
/1 A101
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
G-005
FOR CONSTRUCTION
SYMBOLS &
LEGENDS
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
% PERCENT
A
A/C AIR CONDITIONER
A/E ARCHITECT / ENGINEER
A/V AUDIO VISUAL
AB ANCHOR BOLT
ACC ACCESSIBLE
ACI AMERICAL CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISSABILITIES
ACT
ADJ ADJACENT;
ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FLOOR FINISH
AFG ABOVE FINISH GRADE
AHJ AUTHORITY HAVING
JURISTICTION
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE;
ALTERNATING
ALUM ALUMINUM
ANOD ANODIZED
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECT
AUTO AUTOMATIC
AVG AVERAGE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
B
B.O. BOTTOM OF
B.O.D. BASIS OF DESIGN
BD BOARD
BETW BETWEEN
BEV BEVELED
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BR BEDROOM;
BRICK
BSMT BASEMENT
BTM BOTTOM
BTU BRITISH THERMAL UNIT
BUR BUILT UP ROOFING
BW BOTH WAYS
C
CCD CONTRACT CHANGE DIRECTIVE
CD CONSTRUCTION DOCUMENTS
CER CERAMIC
CF CONTRACTOR FURNISHED
CFC CHLOROFLOUROCARBONS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CI CONTRACTOR INSTALLED
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE;
CLASS
CLG CEILING
CLO CLOSET
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CO CERTIFICATE OF OCCUPANCY;
CLEANOUT
COL COLUMN
CONC CONCRETE
CONSTR CONSTRUCTION
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPET
CSI CONSTRUCTION SPECIFICATION
INSTITUTE
CT CERAMIC TILE;
COUNT
CTR CENTER
CU CUBIC
D
D DEEP;
DEPTH
d PENNY (NAIL)
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION;
DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFERENCE;
DIFFUSER
DIM DIMENSION
DISP DISPENSER
DIST DISTANCE
DL DEAD LOAD
DN DOWN
DR DOOR;
DOORS;
DRAIN
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EF EACH FACE;
EXHAUST FAN
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC;
ELECTRICAL
ELEV ELEVATOR
EMERG EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EPA ENVIRONMENTAL PROTECTION
AGENCY
EQ EQUAL
EST ESTIMATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPANSION;
EXPOSED
EXT EXTERIOR;
EXTERNAL
F
F.O. FACE OF
FAR FLOOR AREA RATING
FC FOOT CANDLES
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FF&E FURNITURE, FIXTURES &
EQUIPMENT
FFC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FIXT FIXTURE
FLEX FLEXIBLE
FLG FLOORING
FLOUR FLOURESCENT
FLR FLOOR
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIRE PROTECTIONS
FPL FABRIC PANEL
FR FIRE RATING;
FIRE RESISTANT;
FRAME
FRTWD FIRE RETARDENT TREATED
WOOD
FT FEET (FOOT)
FTG FOOTING
FURR FURRING
FWC FABRIC WALL COVERTING
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GENR GENERATOR
GFI GROUND FAULT INTERRUPTER
GL GLASS
GLZ GLAZING
GRD GROUND
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
H HIGH
HB HOSE BIBB
HC HANDICAP;
HOLLOW CORE
HDR HEADER
HDW HARDWARE
HEX HEXAGONAL
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HR HOUR
HT HEIGHT
HTG HEATING
HTR HEATER
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
HW HOT WATER
HW HOT WATER
HWY HIGHWAY
I
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
IC IN CONTRACT
ID IDENTIFICATION;
INTERIOR DESIGN;
INSIDE DIAMETER
IN INCHES
INCAND INCANDESCENT
INCL INCLUSIVE
INCLDG INCLUDING
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
J
JAN JANITOR
JB JUNCTION BOX
JST JOIST
JT JOINT
K
KD KNOCK DOWN
KIP THOUSAND POUNDS
KIT KITCHEN
KWY KEYWAY
L
L ANGLE;
LENGTH;
LOW
LAB LABORATORY
LAM LAMINATE;
LAMINATED
LAV LAVATORY
LB POUND
LBS POUNDS
LDG LANDING
LED LIGHT EMITTING DIODE
LF LINEAR FOOT;
LINEAR FEET
LH LEFT HAND
LHR LEFT HAND REVERSE
LIB LIBRARY
LIN LINEAR
LL LIVE LOAD
LONG LONGITUDINAL
LR LIVING ROOM
LT LIGHT
LTG LIGHTING
LVL LAMINATED VENEER LUMBER;
LEVEL
M m METER
M HAL METAL HALIDE
MAINT MAINTENANCE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MBR MEMBER
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM;
MINUTE
MISC MISCELANIOUS
MO MASONRY OPENING
MT MOUNT
MTG MOUNTING
MTL METAL
MW MICROWAVE
MWP METAL WALL PANEL
N
N NORTH
N/A NOT APPLICABLE
NE NORTH EAST
NEC NATIONAL ELECTRIC CODE
NEG NEGATIVE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NSF NET SQUARE FOOT;
NET SQUARE FOOT
NTS NOT TO SCALE
NW NORTHWEST
O
OC ON CENTER
OCC OCCUPANCY;
OCCUPIED
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPG OPENING
OPP OPPOSITE
OZ OUNCE;
OUNCES
P
PART PARTIAL
PASS PASSAGE
PC PRECAST
PCC PRECAST CONCRETE
PD PEDISTAL
PEMB PRE-ENGINEERED METAL
BUILDING
PERF PERFORATED
PERP PERPENDICULAR
PL PLATE;
PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLB PLUMB
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
POS POSITIVE
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT;
PROJECTED
PROP PROPERTY;
PROPOSAL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT;
PRESSURE TREATED
PTD PAINTED
PTN PARTITION
Q
QT QUARRY TILE
QTY QUANTITY
R
R MEASURE OF THERMAL
RESISTANCE;
RADIUS;
RISER
RB RESILIENT BASE;
RUBBER BASE
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROAD;
ROOF DRAIN
REBAR REINFORCING STEEL BARS
REC RECESSED
RECEPT RECEPTICAL
RECT RECTANGLE
REF REFERENCE;
REFRIGERATOR
REINF REINFORCE;
REINFORCING;
REINFORCEMENT
REQ REQUIRE;
REQUIRED
RET RETURN
REV REVISE;
REVISED;
REVISION
RFG ROOFING
RFI REQUEST FOR INFORMATION
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM ROTATIONS PER MINUTE
RSF RENTABLE SQUARE FEET
RT RUBBER TILE
RTG RATING
RTU ROOFTOP UNIT
RWC RAIN WATER CONDUCTOR
S
S SOUTH
SAN SANITARY
SB STONE BASE
SC SOLID CORE
SCH SCHEDULE;
SCHEDULED
SCHEM SCHEMATIC
SD SMOKE DETECTOR;
STORM DRAIN
SDG SIDING
SE SOUTH EAST
SECT SECTION
SF SQARE FOOT;
SQUARE FEET
SGL SINGLE
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SST STAINLESS STEEL
ST STAIRS;
STREET;
STAIN
STC SOUND TRANSMISSION
COEFFICIENT
STD STANDARD
STL STEEL
STN STONE
STO STORAGE
STR STRUCTURE;
STRUCTURAL
SUSP SUSPENDED
SW SOUTH WEST
SWR SEWER
SYMB SYMBOL
SYS SYSTEM
T
T TILE;
TREAD;
TREADS
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T.O. TOP OF
TB TILE BASE
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPERATURE;
TEMPORARY
TERR TERRAZZO
THK THICK;
THICKENED;
THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD TEMPERED
TOC TOP OF CONCRETE;
TOP OF CURB
TOPO TOPOGRAPH;
TOPOGRAPHY;
TOPOGRAPHIC
TOS TOP OF STEEL
TOW TOP OF WALL
TRANSF TRANSFORMER
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
INC.
UNEXCAV UNEXCAVATED
UNO UNLESS NOTED OTHERWISE
UPS UNITERRUPTABLE POWER
SUPPLY
UR URINAL
USF USABLE SQUARE FOOTAGE
USG UNITED STATES GYPSUM
CORPORATION
UTIL UTILITY
V
V VENT;
VOLT
V.I.F. VERIFY IN FIELD
VAR VARIES
VAV VARIABLE AIR VOLUME
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WATT;
WEST;
WIDE;
WIDTH
W/ WITH
W/D WASHER / DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET;
TOILET
WCO WALL CLEANOUT
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WH WATER HEATER
WL WIND LOAD
WLD WELDED
WP WATERPROOF;
WATERPROOFING;
WEATHERPROOF
WPT WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
X
XPS EXTRUDED POLYSYRENE BOARD
(INSULATION)
Y
YD YARD;
YARD DRAIN
N O
D
A T
E
IS
S
U E
For R
08/30/2024 4:44:38 PM
GENERAL NOTES
1. DO NOT SCALE DRAWINGS - USE DIMENSIONS ONLY. FOR DIMENSIONS NOT SHOWN OR IN QUESTION, CONTRACTOR SHALL REQUEST CLARIFICATION FROM ARCHITECT
BEFORE PROCEEDING. THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND MUST NOTIFY THE ARCHITECT IMMEDIATELY IN WRITING OF ANY DISCREPANCIES OR VARIATIONS FROM THE DIMENSIONS OR CONDITIONS SHOWN BY THESE DRAWINGS PRIOR TO ORDERING MATERIALS
OR OTHERWISE PROCEEDING WITH THE WORK.
2. UNLESS NOTED OTHERWISE, WALL AND PARTITION DIMENSIONS ARE GIVEN FROM FACE OF STUD/CMU TO FACE OF STUD/CMU OR TO COLUMN CENTERLINE. EXCEPTION:
MILLWORK DETAILS WHERE DIMENSIONS ARE GIVEN FROM FACE OF FINISH SURFACES (GWB, PLASTER, ETC.). LOCATE EDGE OF DOOR OPENINGS 6" FROM FACE OF
ADJACENT PARTITION UNLESS NOTED OTHERWISE.
3. ELEVATIONS AND LEVELS ARE SHOWN FROM TOP OF SLAB BASED ON A "REFERENCE BENCHMARK ELEVATION" - THE CONTRACTOR SHALL COORDINATE THE ELEVATIONS
PROVIDED WITH THE CIVIL DRAWINGS AND EXISTING ELEVATIONS WHEN APPLICABLE.
4. ALL CENTERLINE OF FOOTINGS, WALLS, GRADE BEAMS, COLUMNS AND BEAMS SHALL COINCIDE, UNLESS NOTED OTHERWISE.
5. ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR SITUATIONS ELSEWHERE, UNLESS
SPECIFICALLY SHOWN OTHERWISE.
6. THIS SET OF CONSTRUCTION DOCUMENTS IS INTENDED TO BE READ AS A COMPREHENSIVE SET OF DRAWINGS AND SPECIFICATIONS. NOTE THAT THE SPECIFICATIONS FORM AN INTEGRAL PART OF THIS CONSTRUCTION DOCUMENTATION. THE CONTRACTOR SHALL CAREFULLY STUDY & COMPARE THE CONTRACT DOCUMENTS WITH EACH OTHER (EACH DISCIPLINE) AND THE INFORMATION FURNISHED BY THE DEVELOPER AND NOTIFY THE ARCHITECT OF ANY ERRORS, INCONSISTENCIES OR OMISSIONS.
INFORMATION GIVEN BY ONE DISCIPLINE SHALL BE APPLICABLE FOR ALL PORTIONS OF THE CONSTRUCTION DOCUMENTS IN ORDER TO MEET THE DESIGN INTENT. IF THE CONTRACTOR PERFORMS ANY CONSTRUCTION ACTIVITY WHERE AN ERROR, INCONSISTENCY OR OMISSION IN THE CONTRACT DOCUMENTS IS EVIDENT WITHOUT SUCH NOTICE TO THE ARCHITECT. THE CONTRACTOR SHALL ASSUME THE APPROPRIATE RESPONSIBILITY AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, COORDINATING AND PAYING FOR THE COST OF ALL INSPECTIONS, TESTS, PERMITS, LICENSES AND OTHER GOVERNMENTAL FEES, AS NECESSARY FOR PROPER EXECUTION TO COMPLETE THE WORK AND AS INDICATED ON THE PLANS AND SPECIFICATIONS, RECOMMENDED BY THE GEOTECHNICAL REPORT AND/OR AS REQUIRED BY ANY GOVERNMENTAL AGENCY. REVISIONS MADE AFTER INITIAL PERMIT PULL REQUIRING RESUBMISSION OF REVISED DOCUMENTS AND/OR ADDITIONAL FEES SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
8. THE CONTRACTOR SHALL COMPLY WITH AND GIVE NOTICES REQUIRED BY LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF THE PUBLIC AUTHORITIES
BEARING ON THE PERFORMANCE OF THE WORK.
9. THE CONTRACTOR SHALL PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES REQUIRED TO EXECUTE AND COMPLETE ALL ITEMS OF WORK AS SHOWN, OR INDICATED ON THE DRAWINGS AND AS SPECIFIED INCLUDING INCIDENTAL ITEMS TO EFFECT A FINISHED AND COMPLETE JOB.
10. THE CONTRACTOR SHALL PROVIDE ALL REGULATORY AGENCY REQUIRED SIGNAGE NECESSARY FOR CERTIFICATE OF OCCUPANCY.
11. ANY AND ALL REVISIONS FROM THESE PLANS MUST BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. ONCE CONSTRUCTION HAS COMMENCED, ANY REVISIONS IN THE FIELD MUST BE APPROVED BY THE OWNER'S CONSTRUCTION REPRESENTATIVE AND THE ARCHITECT.
12. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR BRACING AND SHORING OF THE STRUCTURE DURING CONSTRUCTION TO ENSURE STABILITY.
13. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSPECTIONS WITH THE AUTHORITIES HAVING JURISDICTION ON THE PROJECT.
14. THE CONTRACTOR SHALL MAINTAIN ON SITE AND MAKE AVAILABLE IN THE JOB TRAILER A LIST OF SPECIAL INSPECTORS CONDUCTING INSPECTIONS ON THE PROJECT. THE LIST SHALL INDICATE THE NAMES OF INSPECTOR, DATES, AND TIMES PRESENT ON JOB SITE AND TYPES OF INSPECTIONS BEING CONDUCTED. INSPECTION REPORTS SHALL
ALSO BE MADE AVAILABLE UPON REQUEST.
15. THE CONSTRUCTION SCHEDULE SHALL BE RELATED TO THE ENTIRE PROJECT AND BE CONDUCTED IN STRICT ACCORDANCE WITH THE SEQUENCE OF OPERATIONS IN WHICH THE CONTRACTOR HAS COORDINATED WITH THE OWNER'S APPROVAL ON ALL SCHEDULE SEQUENCING TO AVOID CONFLICTS WITH DAILY OPERATIONS AND SPECIAL
EVENTS INCLUDING ANY EXISTING FACILITIES AND ACCESS AS MAY BE APPLICABLE.
16. THE USE OF THE SITE SHALL BE CONFINED TO THOSE AREAS APPROVED BY THE OWNER AND CODE IN ORDER TO MINIMIZE PUBLIC EXPOSURE TO UNSAFE CONDITIONS AND
TO CONTINUE THE OPERATION OF THE SURROUNDING DEVELOPMENT.
17. NO STRUCTURE OF ANY KIND IS TO BE CONSTRUCTED ON OR PLACED WITHIN PUBLIC UTILITY EASEMENTS EXCEPT WOOD, WIRE OR REMOVABLE SECTION TYPE FENCING, REQUIRE PAVING FOR ACCESS AND GROUND COVER INCLUDING GRASS. THE CONTRACTOR SHALL REPLACE ANY OBSTRUCTIONS OR PLANTING THAT MUST BE REMOVED DURING THE COURSE OF MAINTENANCE, CONSTRUCTION OR RECONSTRUCTION OF THE PUBLIC UTILITIES AT NO COST TO THE OWNER.
18. NO BUILDING OR PORTION OF A BUILDING SHALL BE OCCUPIED OR USED INCLUDING STORAGE PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY. APPROVAL FOR OCCUPANCY IS ONLY GRANTED AFTER ACCEPTANCE BY THE FIRE MARTIAL AND BUILDING OFFICIAL.
19. MATERIAL AND EQUIPMENT STORAGE SHALL BE ON SITE AND COORDINATED WITH OWNER'S DIRECTIVES.
20. SIGNS, LOCATION, NUMBER, AND SIZE ARE NOT APPROVED UNDER THIS BUILDING PERMIT. A SEPARATE PERMIT IS REQUIRED FOR EACH SIGN. ALL IDENTIFICATION SIGNAGE SHALL BE PROVIDED BY OWNER AND INSTALLED BY CONTRACTOR UNLESS NOTED OTHERWISE SIGNAGE ON RESTROOM DOORS SHALL BE RAISED AND BRAILLE CHARACTERS AND PICTORIAL SYMBOL SIGNS. IDENTIFICATION SIGNAGE SHALL BE INSTALLED ON THE WALL ADJACENT TO THE LATCH SIDE OF THE DOOR. WHERE THERE IS NO WALL SPACE TO THE LATCH SIDE OF THE DOOR, INCLUDING AT DOUBLE LEAF DOORS, SIGNS SHALL BE PLACED ON THE NEAREST ADJACENT WALL. MOUNTING HEIGHT SHALL COMPLY WITH THE GEORGIA ACCESSIBILITY CODE AND THE ADA STANDARDS FOR ACCESSIBLE DESIGN.
21. EXIT DOORS SHALL NOT BE SUBJECTED TO USE OF A KEY OR REQUIRE SPECIAL KNOWLEDGE TO OPERATE PER THE NFPA 101 LIFE SAFETY CODE 2018 EDITION, CHAPTER 5-2.15.2. PANIC HARDWARE SHALL BE PROVIDED FOR ALL EXIT DOORS PER THE REQUIREMENTS OF THE NFPA LIFE SAFETY CODE. EXIT DOORS SHALL OPERATE PER NFPA
101 LIFE SAFETY CODE.
22. (DOOR/HARDWARE) HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERATING DEVICES ON ACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EASY TO GRASP WITH ONE HAND AND DOES NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING, OR TWISTING OF THE WRIST TO OPERATE. LEVER-OPERATED MECHANISMS, PUSH-TYPE MECHANISMS, AND U-SHAPED HANDLES SHALL BE PROVIDED THAT COMPLY WITH GEORGIA ACCESSIBILITY CODE AND THE ADA STANDARDS FOR ACCESSIBLE DESIGN.
23. PROTRUDING OBJECTS SHALL NOT REDUCE THE CLEAR WIDTH OF AN ACCESSIBLE ROUTE AND SHALL BE INSTALLED WITH THE GEORGIA ACCESSIBILITY CODE AND THE ADA
STANDARDS FOR ACCESSIBLE DESIGN.
24. DETECTIBLE WARNINGS ON WALKING SURFACES SHALL COMPLY WITH THE GEORGIA ACCESSIBILITY CODE AND THE ADA STANDARDS FOR ACCESSIBLE DESIGN.
25. ALL MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX AND A SMOKE-DEVELOPED INDEX OF NOT
MORE THAN 50 AS DETERMINED IN ACCORDANCE WITH ASTM E84.
26. THE CONTRACTOR SHALL DOCUMENT THAT INSULATION MATERIALS IN CONCEALED OR EXPOSED SPACES SHALL HAVE A FLAME SPREAD INDEX AND A SMOKE-DEVELOPED
INDEX THAT MEETS CODE.
27. ALL INTERIOR FINISH PRODUCTS SHALL BE PROVIDED IN COMPLIANCE WITH THE REQUIREMENTS OF THE RESPECTIVE OCCUPANCY CHAPTER OF THE NFPA 101 LIFE SAFETY CODE FOR WHICH THE PROJECT IS BEING PERMITTED UNDER. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION VERIFYING AT THE TIME OF FINAL INSPECTION THAT
PRODUCTS ARE COMPLIANT WITH THE CODE REQUIREMENTS.
28. ALL WOOD LUMBER AND PLYWOOD OR O.S.B. USED IN EXTERIOR CONSTRUCTION SHALL BE PRESSURE TREATED THAT COMES IN CONTACT WITH CONCRETE OR WITHIN 12"
OF GRADING/SOIL.
29. EMERGENCY LIGHTING COMPLYING WITH NFPA 101 LIFE SAFETY CODE SHALL BE INSTALLED. ADDITIONAL EMERGENCY LIGHTING MAY BE REQUIRED UPON FIELD
INSPECTION.
30. THE CONTRACTOR SHALL PERMANENTLY IDENTIFY ALL FIRE-RATED WALLS AND SMOKE BARRIERS WITH SIGNS OR STENCILING ABOVE CEILING OR IN CONCEALED SPACES WITH LETTERS A MINIMUM OF 2" HIGH ON A CONTRASTING BACKGROUND SPACED AT A MAXIMUM OF 12'-0" ON CENTER WITH A MINIMUM OF ONE PER WALL OR BARRIER IN
ACCORDANCE WITH CODE.
31. PRIOR TO INSTALLATION, THE CONTRACTOR SHALL SUBMIT DETAILS FOR REVIEW AND APPROVAL WHICH CLEARLY INDICATE LATERAL BRACING TO BUILDING STRUCTURE FOR ALL PARTITIONS OF LIGHT GAUGE METAL FRAMING WHICH EXCEED 9'-0" IN HEIGHT TO ADEQUATELY RESIST THE APPLICABLE LATERAL SEISMIC DESIGN FORCES PER
CODE.
32. ALL COLD FORM METAL FRAMING SHOWN OF THE DRAWINGS IS FOR DIAGRAMMATIC USE ONLY. MEMBER SIZE, CONFIGURATION, DETAILS AND CONNECTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR'S COLD FORM METAL FRAMING ENGINEER. COLD FORM METAL FRAMING SHOP DRAWINGS, COMPLETE WITH CALCULATIONS, SHALL BE SIGNED AND SEALED BY THE COLD FORM METAL FRAMING ENGINEER IN THE STATE OF HAVING JURISDICTION OVER THE PROJECT AND SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL.
33. PROVIDE FIRE RETARDANT TREATED BLOCKING IN PARTITIONS AS REQUIRED FOR SUPPORTING WALL MOUNTED EQUIPMENT, ETC.
34. ELECTRICAL PANELS, ALARM BOXES, FIRE EQUIPMENT CABINETS AND OTHER SIMILARLY RECESSED BOXES GREATER THAN 16" THAT ARE LOCATED IN A RATED ASSEMBLY SHALL BE BACKED BY GYPSUM WALLBOARD LAYERS SUFFICIENT TO MAINTAIN THE DESIGNATED FIRE RATING. FIRE EQUIPMENT CABINETS MAY BE PROVIDED WITH A RATED
CABINET TO MATCH THE MINIMUM DESIGNED ASSEMBLY RATING THEY ARE LOCATED WITHIN.
35. PATCH AND REPAIR ALL ITEMS DAMAGED OR ALTERED DURING CONSTRUCTION. ALL PATCHES SHALL BLEND WITH ADJACENT MATERIAL, COLOR, FINISH, AND TEXTURE. ALL EXISTING WORK FURNISHINGS, EQUIPMENT OR MATERIAL TO REMAIN THAT ARE DAMAGED BY THE CONTRACTOR'S OPERATION SHALL BE REPAIRED AT NO ADDITIONAL
COST TO THE OWNER.
36. SLOPE ALL SLABS AT EXTERIOR BUILDING ENTRANCES 1/8" FT AWAY FROM BUILDING IN ALL LOCATIONS.
37. ISOLATE DISSIMILAR METALS BY MEANS OF HEAVY BITUMINOUS COATING, APPROVED PAINT, ADHERED POLYETHYLENE SHEET, OR OTHER MEANS OF APPROVED BY THE
ARCHITECT.
38. PRIME AND PAINT ALL STEEL LINTELS, HANDRAILS, AND ANY AND ALL OTHER INTERIOR OR EXTERIOR EXPOSED FERROUS METAL SURFACES NOT OTHERWISE INDICATED AS
COATED OR PAINTED.
39. STRUCTURAL WORK, INCLUDING MATERIAL STRESSES AND METHODS OF CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE LATEST ADOPTED BUILDING CODE, OSHA AND
GOVERNING AGENCIES HAVING JURISDICTION.
40. THE CONTRACTOR SHALL USE CONSTRUCTION METHODS THAT ARE IN STRICT ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
41. THE CONTRACTOR SHALL MAINTAIN THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS, DEBRIS AND RUBBISH CAUSED BY OPERATIONS.
42. AFTER COMPLETION OF WORK ALL ADDITIONAL MATERIALS REMAINING DUE TO CONSTRUCTION SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF/REMOVED FROM THE SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS, ORDINANCES, RULES, AND REGULATIONS U.N.O. THE CONTRACTOR SHALL ALSO REMOVE ALL WASTE DEBRIS, RUBBISH, TOOLS, EQUIPMENT, AND SURPLUS MATERIALS UPON COMPLETION OF WORK. THROUGHOUT CONSTRUCTION THE SITE SHALL BE
ORGANIZED AND CLEANED BY THE CONTRACTOR ON A DAILY BASIS.
43. THE CONTRACTOR SHALL RESTORE TO ITS ORIGINAL CONDITION ALL SITE APPURTENANCES DAMAGED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE OWNER.
44. ANY MATERIAL SCHEDULED FOR DEMOLITION SHALL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS NOTED OTHERWISE AND SHALL BE DISPOSED OF LEGALLY BY
THE CONTRACTOR.
45. THE FLOOR LEVEL SHALL BE THE SAME ON BOTH SIDES OF ALL INTERIOR DOORS.
46. ALL PENETRATIONS INTO OR THROUGHOUT EITHER A VERTICAL AND/OR HORIZONTAL FIRE RATED ASSEMBLY SHALL BE PROTECTED BY A FIRE-STOPPING ASSEMBLY LISTED
BY A RECOGNIZED TESTING AGENCY.
47. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PRODUCT DATA, SAMPLES, AND SHOP DRAWINGS FOR SPECIFIED ITEMS. THESE ITEMS MUST BE SUBMITTED TO THE
ARCHITECT FOR REVIEW PRIOR TO FABRICATION.
48. COMPLETE SHOP DRAWINGS FOR ALL SPECIALITY ITEMS INCLUDED BUT NOT LIMITED TO ORNAMENTAL GUARDRAILS SHALL BE PROVIDED BY THE CONTRACTOR WITH SIGNATURE AND SEAL SIGNIFYING REVIEW AND APPROVAL BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF GEORGIA AND SHALL BE MADE AVAILABLE AT THE
JOB SITE DURING TIMES OF CONSTRUCTION.
49. THE CONTRACTOR SHALL PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION AND PERMANENT FIRE EXTINGUISHERS INCLUDING AT ALL FIRE EXTINGUISHER CABINET LOCATIONS MARKED ON PLAN IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 10.
50. ALL FINAL MATERIAL FINISH SELECTIONS TO BE APPROVED BY OWNER PRIOR TO ORDERING.
51. INDICATED TELEVISION LOCATIONS ON PLAN SHALL BE PROVIDED WITH BLOCKING AS REQUIRED IN WALLS WITH OWNER'S FINAL FURNITURE, FIXTURES, AND EQUIPEMNT PACKAGE. T.V.'S AND WALL BRACKETS ARE BY OWNER'S F.F.E. AND/OR RESIDENTS. CONTRACTOR SHALL CONFIRM FINAL BLOCKING REQUIREMENTS WITH OWNER PRIOR TO
WALL COVER-UP.
52. SPECIAL INSPECTION REPORTS AND FINAL REPORT IN ACCORDANCE WITH SECTION 1704.2.4 SHALL BE SUBMITTED TO THE BUILDING OFFICIAL PRIOR TO THE TIME THAT
PHASE OF WORK IS APPROVED FOR OCCUPANCY.
53. UNLESS DETERMINED BY THE "FIRE CODE OFFICIAL" THAT A RADIO COVERAGE SYSTEM IS NOT NEEDED FOR NEW BUILDINGS THE GENERAL CONTRACTOR SHALL PROVIDE FOR IFC 510 TESTING AND PROVIDE SYSTEM AS REQUIRED BASED ON TEST DATA AND FIRE MARSHIAL REQUIREMENTS.
54. FIRE SPRINKLER DRAWINGS TO BE SUBMITTED TO AUTHORITY HAVING JURISDICTION BY SUBCONTRACTOR FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF
THIS SCOPE OF WORK.
55. PRE-ENGINEERED METAL BUILDING SHOP DRAWINGS ARE A DEFERRED SUBMITTAL. SHOP DRAWINGS TO BE PROVIDED TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO FABRICATION AND ERECTION OF METAL BUILDING AND PRIOR TO FORMING, REINFORCING, AND POURING OF FOUNDATIONS.
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
G-006
FOR CONSTRUCTION
GENERAL NOTES
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
For R
LIFE SAFETY LEGEND
EXIT TRAVEL DISTANCE
TOTAL TRAVEL DISTANCE COMMON PATH
(PART OF TD)
DEAD END LENGTH
TD1: 100'-0" CP1: 100'-0" DE1: 100'-0"
EXIT DATA
EXIT NUMBER
E X
IT
ONE-HALF-HOUR RATED FIRE & SMOKE BARRIER
ONE-HOUR RATED FIRE & SMOKE BARRIER
TWO-HOUR RATED FIRE & SMOKE BARRIER
THREE-HOUR RATED FIRE & SMOKE BARRIER
LIFE SAFETY GENERAL NOTES
1. REFER TO PARTITION TYPES SCHEDULE FOR PARTITION TYPE DETAILS AND TESTED RATED
ASSEMBLY DETAILS.
UNIT TRAVEL DISTANCE
UT1: 100'-0"
45 DOOR RATING (IN MINUTES)
38"
STAIR EGRESS CAPACITY
DOOR EGRESS CAPACITY
DOOR EGRESS WIDTH
STAIR EGRESS WIDTH
EXIT LIGHT
34"
FIRE EXTINGUISHERFE
FIRE EXTINGUISHER CABINETFE
TRAVEL DISTANCE
NEW STORAGE OCCUPANCY [SPRINKLERED]
LSC CHAPTER 42, IBC CHAPTER 3
GROUP S-1 (STORAGE) OCCUPANCY
TRAVEL DISTANCE
400' MAX; LSC TABLE 42.2.6
DEAD END LIMIT 50'; LSC 42.8.2.5.2
LIFE SAFETY KEYNOTES LS
14,004.86 SF 500 GROSS
28 OCC
STORAGE 1
STORAGE
CLEAR
127'-0"
T D
2:
'-1
FIRE RISER
ELECTRICAL
U N
O C
C U
P
IE
D A
R E
A
1,960.00 SF 500 GROSS
4 OCC
STORAGE 1
STORAGE
C L
E A
R
2'
-8
"TD1: 70'-0"
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
LS101
FOR CONSTRUCTION
LIFE SAFETY
PLAN
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
OCCUPANCY USE SCHEDULE
FUNCTION/USE AREA
LINEAR
INCHES FACTOR
CALCULATED
OCCUPANT
LOAD
ACTUAL
OCCUPANT
OVERRIDE
DESIGN
OCCUPANT
LOAD
TUNNEL F.F.
STORAGE 1
STORAGE 1,960.00 SF 0'-0" 500 GROSS 4 0 4
F.F.
STORAGE 1
STORAGE 14,004.86 SF 0'-0" 500 GROSS 28 0 28
TOTAL OCCUPANT LOAD 15,964.86 SF 0'-0" 32 0 32
OCCUPANT TOTAL NUMBER OF EXITS
MIN. REQ. PROVIDED
N/A N/A
MIN. REQ. PROVIDEDMIN. REQ. PROVIDED
HORIZONTAL: 0.2/OCC STAIRWAY: 0.3/OCC
7"
EGRESS CAPACITY:
2 5 1,942"
N O
D
A T
E
IS
S
U E
LS101 | 1/8" = 1'-0"1 TIPPING FLOOR
LS101 | 1/8" = 1'-0"2 TUNNEL F.F.
For R
PARTITION LEGEND
MODIFIER (SEE TABLE D)
CORE THICKNESS (NOMINAL)
PARTITION TYPE (SEE TABLE C)
CORE CONSTRUCTION (SEE TABLE B)
FIRE / SMOKE RATING (SEE TABLE A)
A-BC2-D
TABLE A - FIRE / SMOKE RATING TABLE C - PARTITION TYPE
0 NON-RATED CONSTRUCTION
S NON-RATED SMOKE PARTITION; FRAMING
& GWB TO STRUCTURE ABOVE & SPACE
AROUND PENETRATING ITEMS TO BE
FILLED W/ APPROVED MATERIAL TO LIMIT
PASSAGE OF SMOKE; COMPLY WITH 2018
IBC SECTION 710
1 1-HOUR FIRE RATED; FRAMING & GWB TO
STRUCTURE / THERMAL INSULATION PER
UL REQUIREMENTS
2 2-HOUR FIRE RATED; FRAMING & GWB TO
STRUCTURE / THERMAL INSULATION PER
UL REQUIREMENTS
3 3-HOUR FIRE RATED; FRAMING & GWB TO
STRUCTURE / THERMAL INSULATION PER
UL REQUIREMENTS
A (1) LAYER GYP. EACH SIDE
B (1) LAYER GYP. ONE SIDE; (2) LAYERS
OTHER SIDE
C (2) LAYERS GYP. EACH SIDE
D (1) LAYER GYP. ONE SIDE
E (2) LAYERS GYP. ONE SIDE
F (1) LAYER GYP. EACH SIDE,
RESILIENT CHANNEL
G (1) LAYER GYP. ONE SIDE, (2) LAYERS
RESILIENT CHANNEL SIDE
H (2) LAYERS GYP. EACH SIDE,
RESILIENT CHANNEL
J (1) LAYER GYP. EACH SIDE, SHEATHING
K (1) LAYER GYP. ONE SIDE, (2) LAYERS
SHEATHING SIDE
L (2) LAYERS GYP. EACH SIDE, SHEATHING
M EXPOSED CORE
TABLE B - CORE CONSTRUCTION TABLE D - MODIFIERS
C CONCRETE - CAST-IN-PLACE A PARTIAL HEIGHTS PARTITION / FRAMING &
GWB TO X'-0" A.F.F. (SEE BLDG. DETAILS)
D DEMISING
M METAL
P PRE-CAST CONCRETE
S SHAFT LINER
T STONE
U MASONRY UNIT
W WOOD
Z Z-FURRING
B FRAMING & GWB TO FINISHED CEILING /
PROVIDE BRACING AS REQUIRED
C 'B' W/ 3" SOUND ATTENUATION BLANKETS
(SAB) & 4' WIDE SAB ABOVE CEILING
CENTERED ON PARTITION
D FRAMING & GWB TO 4" ABOVE CEILING /
PROVIDE BRACING AS REQ. OR EXTEND
STUDS TO STRUCTURE ABOVE
E 'D' W/ 3" SOUND ATTENUATION BLANKETS
(SAB) & 4' WIDE SAB ABOVE CEILING
CENTERED ON PARTITION
F FRAMING & GWB TO STRUCTURE / 3"
SOUND ATTENUATION BLANKETS, U.N.O.
PARTITION NOTES
1. CONTRACTOR SHALL ADJUST STUD GUAGE AND/OR SPACING AND BRACE AS NECESSARY SO
AS NOT TO EXCEED L/240 DESIGN CRITERIA.
2. PROVIDE RATED WALLS ACCORDING TO THE FULL REQUIREMENTS OF THE INDICATED TEST
NUMBER.
3. PROVIDE IN-WALL BLOCKING FOR MILLWORK, ARTWORK, FURNISHINGS, HARDWARE, WALL
STOPS, TOILET ACCESSORIES, GRAB BARS, CLOSET RODS, HANDRAILS, WALL BUMPERS,
MODULAR OFFICE WALLS, ETC.
4. AT WALLS BEHIND TUBS & SHOWERS, IN LIEU OF GYPSUM BOARD INDICATED AT NOTED WALL
TYPES, PROVIDE ONE LAYER OF MOISTURE-RESISTANT BOARD TYPE X & SPACE STUDS AT
MAXIMUM 16" O.C. WHERE TYPE INDICATED AS FIRE-RATED.
5. REFER TO STRUCTURE FOR BEARING / NON-BEARING CONDITION WHEN THERE IS
DISCREPANCY.
6. PROVIDE CONTINUOUS FIRESTOPPPING AT TOP, BOTTOM, AND ENDS OF FIRE-RATED
PARTITIONS AND AT ALL
PENETRATIONS. PROVIDE RED COLOR IF DICTATED BY AUTHORITY HAVING JURISTICTION.
7. ALL FIRE-RATED WALLS AND SMOKE BARRIERS SHALL BE PERMANENTLY IDENTIFIED WITH
SIGNS OR STENCILING ABOVE CEILING OR IN CONCEALED SPACES WITH LETTERS A MINIMUM
OF 2" HIGH ON A CONTRASTING BACKGROUND SPACED AT A MAXIMUM OF 12' - 0" O.C. WITH A
MINIMUM OF ONE PER WALL OR BARRIER IN ACCORDANCE WITH 2006 STANDARD FIRE
PREVENTION CODE, 120-3-3 CHAPTER 5 OF THE RULES AND REGULATIONS OF THE FIRE
SAFETY COMMISIONER.
SUGGESTED WORDING: "(#) HOUR FIRE AND SMOKE BARRIER - PROTECT ALL OPENINGS"
APPLY LETTERING TO BOTH SIDES OF WALLS.
8. REFER TO STRUCTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON
STRUCTURAL REINFORCEMENT OF WALLS INCLUDING BUT NOT LIMITED TO PARTIAL HEIGHT
WALLS, BRACING, REINFORCING, BOND BEAMS AND GROUT FILLING OF C.M.U. CORES.
9. AT ALL RESTROOMS, OFFICES AND SIMILAR SPACES, PROVIDE BACKLOADED SCHEDULED
CEILING W/ SOUND BATT INSULATION A MINIMUM OF 4' - 0" ALONG EACH SIDE OF SCHEDULED
PARTITIONS (TYP.)
10. STAGGER ELECTRICAL OUTLETS 12" MINIMUM AT ALL PARTITIONS.
11. ALL VERTICAL PIPING EXPOSED IN ROOMS SHALL BE FURRED WITH SAME MATERIAL AS
ADJACENT WALLS. EXCEPTIONS ARE: MECHANCIAL ROOMS, ELECTRICAL ROOMS, TELEPHONE
ROOMS.
12. METAL STUD PARTITIONS BEHIND ALL PLUMBING AND OTHER FIXTURES SHALL BE BRACED TO
STRUCTURE WHERE REQUIRED TO SUPPORT THE EQUIPMENT PROVIDED.
L SPECIAL
P (1) LAYER METAL WALL PANEL BOTH SIDES
G R-19 BATT. INSULATION
SCHEDULED FLOOR
SEALANT EACH SIDE
SCHEDULED BASE
5/8" GWB EACH SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT EACH SIDE
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
SCHEDULED FLOOR
SEALANT EACH SIDE
SCHEDULED BASE
5/8" GWB ONE SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT EACH SIDE
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
(2) LAYERS 5/8" GWB ONE SIDE
SCHEDULED FLOOR
SEALANT EACH SIDE
SCHEDULED BASE
(2) LAYERS 5/8" GWB EACH SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT EACH SIDE
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
SCHEDULED FLOOR
SEALANT
SCHEDULED BASE
5/8" GWB ONE SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
SCHEDULED FLOOR
SEALANT
SCHEDULED BASE
(2) LAYERS 5/8" GWB ONE SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
SCHEDULED FLOOR
SEALANT EACH SIDE
SCHEDULED BASE
5/8" GWB EACH SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT EACH SIDE
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
1/2" RESILIENT CHANNEL @ 16" O.C. OR 24" O.C. VERT.
SCHEDULED FLOOR
SEALANT EACH SIDE
SCHEDULED BASE
5/8" GWB ONE SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT EACH SIDE
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
1/2" RESILIENT CHANNEL @ 16" O.C. OR 24" O.C. VERT.
(2) LAYERS 5/8" GWB CHANNEL SIDE
SCHEDULED FLOOR
SEALANT EACH SIDE
SCHEDULED BASE
(2) LAYERS 5/8" GWB EACH SIDE
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
SEALANT EACH SIDE
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
1/2" RESILIENT CHANNEL @ 16" O.C. OR 24" O.C. VERT.
SCHEDULED FLOOR
1-1/4" METAL LINER PANEL BOTH SIDES
SCHEDULED MTL. STUDS
@16" OR 24" O.C.
CEILING AS SCHEDULED
LINE OF STRUCTURE
HEAD
PLAN
SILL
DEFLECTION TRACK - DO NOT ATTACH GWB
OR STUDS TO DEFLECTION TRACK
PROVIDE 24 GA FLAT STRAPPING @ 24" O.C.
HORIZ. FOR LINER PANEL ATTACHMENT
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
G-220
FOR CONSTRUCTION
METAL STUD
PARTITION
TYPES
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
PARTITION TYPES
MA
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
MB
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
MC
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
MD
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
ME
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
MF
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
MG
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
MH
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
N O
D
A T
E
IS
S
U E
MP
WALL TYPE FIRE RATING STC RATING STUD WIDTH
ASSEMBLED
WIDTH
TESTED
ASSEMBLY
0-MP6 0 - 6" 8 1/2" -
For R
A C J
7 7
6 6
D E F G H
'-4
'-6
0'
-2
'-0
'-0
AS099
AS099
AS099
AS099
AS099
AS099
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0"
4'-6" 15'-1" 5" 5'-8" 14'-4" 6'-6" 4'-0" 9'-6" 5'-7" 14'-5" 11'-8" 8'-4" 12'-6" 7'-6"
TRENCH DRAIN
TUNNEL F.F.
-15' - 0"
7 6
'-6
1'-4" 2'-6" 4'-1" 2'-0" 4'-1" 1'-0" 5'-0"
RUB RAILFLOOR DRAINS; SEE PLUMB.
SLAB EDGE PLAN LEGEND
THICKENED SLAB EDGE W/ VENEER LEDGE - SEE BLDG. DETAILS
TOPPING SLAB AREA
CURB - SEE BLDG. DETAILS
DEPRESSED SLAB AREA
1. ACTUAL REFERENCE LEVELS VARY. REFER TO CIVIL PLANS FOR ACTUAL TOP-OF-SLAB
REFERENCE ELEVATIONS.
2. SEE BUILDING DETAILS AND STRUCTURAL DETAILS FOR ADDITIONAL INFORMATION FOR SLAB
EDGE DETAILS.
3. ACTUAL EOS LOCATIONS AND DIMENSIONS VARY. SEE APPROVED LIFT DECK TUNNEL SCALE
DRAWINGS FOR FINAL LOCATIONS, DIMENSIONS, SECTIONS, AND DETAILS.
4. FAIRBANKS SCALES UTILIZED FOR BASIS OF DESIGN FOUNDATION DETAILS. CONTRACTOR
SHALL COORDINATE AND VERIFY ALL DETAILS BETWEEN AWARDED SCALE MANUFACTURER
AND FOUNDATION / ELECTRICAL / PLUMBING PRIOR TO CONSTRUCTION OF ANY SCALE
RELATED PITS, WALLS, OR DEVICES.
SLAB EDGE NOTES
SLAB SLOPE LEVEL CHANGE - BEVELED
X'-X"
LEVEL CHANGE - STEP
X'-X"
LEVEL CHANGE -
STEP W/ SLOPE
X'-X"
AREA OF SLAB LEAVE-OUT
FLOOR DRAIN SLOPE TO DRAIN
4" 1'-0" 10'-1" 3'-2" 7'-7" 1'-0" 4"
'-0
'-1
'-0
'-1
'-0
'-2
-15'-0"
-15'-0"
-15'-0" -16'-6"
-16'-6"-16'-6"
-16'-6"
-15'-0"
-1'-6"
-1'-6" -1'-6"
-1'-6"
-1'-6"
-1'-6"
-1'-6"
-1'-6"
-1 '-6
-1 '-6
-1 '-6
-1 '-6
AS099
AS099
-1 '-6
-1 '-6
-1 '-6
-1 '-6
'-0
'-1
'-0
'-1
'-0
'-2
4" 1'-0" 15'-1" 1'-0" 4"
-1'-6"
-1 '-6
-1 '-6
-1
'-6
-1 '-6
-1'-6"
-15'-0"
-16'-6"
-1'-6"
-1'-6"
AS099
AS099
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
AS099
FOR CONSTRUCTION
EOS PLAN -
TUNNEL
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
AS099 | 3/16" = 1'-0"1 EOS - TUNNEL F.F.
AS099 | 3/8" = 1'-0"2 TYP. SCALE SECTION
AS099 | 3/8" = 1'-0"3 ENLARGED EOS - SCALE @ TRUCK
AS099 | 3/8" = 1'-0"4 ENLARGED EOS - SCALE @ TRAILER
For R
SLOPE SLOPE
SLOPE SLOPE
A
A
C
C
J
J
3 3
2 2
1 1
A-401
A-401
A-402
A-402
A-301
A-3022
A-301
A-302 1
4 4
7 7
5 5
6 6
'-4
3' -8
'-0
140'-0"
TUNNEL FFE
TIPPING FLOOR ABOVE
A-401
A-401
TRENCH DRAIN
TIRE GUIDE RAIL, SEE DETAIL 9/A-611
HOPPER OPENING ABOVE
A-411
A-411
A-411
A-411
A-412
B D
D
E
E
F
F
G
G
H
H
I
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0"
0'
-0
-15'-0"
PIPE BOLLARD; SEE STR.
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
A-099
FOR CONSTRUCTION
FLOOR PLAN -
TUNNEL
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
A-099 | 1/8" = 1'-0"1 TUNNEL F.F.
For R
S
LO
P E
SLOPESLOPE
S
LO
P E
SLOPESLOPE
A
A C
J
J
3 3
2 2
1 1
140'-0" 16'-0"
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0"
A-401
A-401
A-402
A-402
A-301
A-3022
A-301
A-302 1
4 4
7 7
'-0
5 5
6 6
0'
-0
0'
-0
0'
-0
0'
-0
0'
-0
3'
-1 0"
'-0
'-2
0'
-0
140'-0"
16' TALL CONCRETE SPLITTER
TIPPING FLOOR
F.F. +0'-0"
5'-6"1'-4"
' T
A L
L C
O N
C R
E T
E W
A
LL
' T
A L
L C
O N
C R
E T
E W
A
LL
16' TALL CONCRETE W
ALL
A-401
A-401
A-411
A-411
A-411
A-411
A-412
A-412
A-412
B
D E F G H
6'-0"
I
128'-0" 6'-0"
1'-0" 1'-0"
'-0
'-0
'-4
5' -8
FACE OF WALL BELOW FACE OF WALL BELOW
'-0
'-0
'-2
PROPOSED FIRE RISER LOCATION
7X5 CONC. STOOP
NEW SITE WALL AND GUARD RAIL
C
A
B
0-MP6-G
PIPE BOLLARD; SEE STR.
PIPE BOLLARD; SEE STR.
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
A-101
FOR CONSTRUCTION
FLOOR PLAN -
TIPPING FLOOR
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
A-101 | 1/8" = 1'-0"1 TIPPING FLOOR PLAN
For R
RCP TAG
PTD
-EXPSD
CEILING HEIGHT / FIXTURE HEIGHT
CEILING FINISH
CEILING TYPE
CEILING PATTERN
CEILING TYPE LEGEND
EXPSD. EXPOSED TO STRUCTURE ABOVE
LIGHTING FIXTURES LEGEND
2X4 HI-BAY LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS
RCP NOTES
1. THIS DRAWING IS FOR GRAPHICAL FIXTURE LOCATION ONLY. SEE ELECTRICAL DRAWINGS
FOR FIXTURE SCHEDULE
2. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR GENERAL LIGHTING FOR
PRICING IN ADDITION TO DECORATIVE LIGHTING AS SHOWN ON THIS PLAN.
EXTERIOR WALL PACK LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS
LINEAR LED LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS
EXPSD. EXPOSED TO STRUCTURE ABOVE; DEFLECTOR PLATE ABOVE
MWP METAL WALL LINER PANEL CEILING / SOFFIT
SCALE DISPLAY - SEE APPROVED LIFT DECK TUNNEL SCALE DRAWINGS FOR
FINAL LOCATIONS, MOUNTING HEIGHT, AND POWER REQ.
A-401
A-401
A-402
A-402
A-301
A-3022
A-301
A-302 1
A-401
A-401
TIPPING FLOOR ABOVE
OPEN
TO
ABOVE
OPEN
TO
ABOVE
LINEAR LED MOUNTED TO TUNNEL WALL;
SEE ELEC. PLANS FOR DETAILS
LINEAR LED MOUNTED TO TUNNEL WALL;
SEE ELEC. PLANS FOR DETAILS
SCALE DISPLAY SCALE DISPLAY
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :2
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
A-199
FOR CONSTRUCTION
REFLECTED
CEILING PLAN -
TUNNEL
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
A-199 | 1/8" = 1'-0"1 TUNNEL F.F.
For R
RCP TAG
PTD
-EXPSD
CEILING HEIGHT / FIXTURE HEIGHT
CEILING FINISH
CEILING TYPE
CEILING PATTERN
CEILING TYPE LEGEND
EXPSD. EXPOSED TO STRUCTURE ABOVE
LIGHTING FIXTURES LEGEND
2X4 HI-BAY LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS
RCP NOTES
1. THIS DRAWING IS FOR GRAPHICAL FIXTURE LOCATION ONLY. SEE ELECTRICAL DRAWINGS
FOR FIXTURE SCHEDULE
2. CONTRACTOR SHALL REFER TO ELECTRICAL DRAWINGS FOR GENERAL LIGHTING FOR
PRICING IN ADDITION TO DECORATIVE LIGHTING AS SHOWN ON THIS PLAN.
EXTERIOR WALL PACK LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS
LINEAR LED LIGHT FIXTURE - SEE ELECTRICAL DRAWINGS
EXPSD. EXPOSED TO STRUCTURE ABOVE; DEFLECTOR PLATE ABOVE
MWP METAL WALL LINER PANEL CEILING / SOFFIT
SCALE DISPLAY - SEE APPROVED LIFT DECK TUNNEL SCALE DRAWINGS FOR
FINAL LOCATIONS, MOUNTING HEIGHT, AND POWER REQ.
A-401
A-401
A-402
A-402
A-301
A-3022
A-301
A-302 1
A-401
A-401
CENTER ON
DOORWAY
CENTER ON
DOORWAY
CENTER ON
DOORWAY
INTERIOR LED CENTERED ON DOOR
@ FIRE RISER/ELEC. ROOM; SEE ELEC.
12'-0"MWP
SCALE DISPLAY SCALE DISPLAY
20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0"
T Y
P
0'
-0
T Y
P
0'
-0
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :3
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
A-201
FOR CONSTRUCTION
REFLECTED
CEILING PLAN -
TIPPING FLOOR
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
A-201 | 1/8" = 1'-0"1 TIPPING FLOOR
For R
EXTERIOR FINISH LEGEND
PATTERN TAG MATERIAL
CAST IN PLACE CONCRETECIP-01
EXTERIOR FINISH KEYNOTES
TAG MATERIAL
CONTROL JOINT - 1/2" TYP. U.N.O., PROVIDE AT ALL INSIDE CORNERS & BEHIND
ROOF DOWNSPOUTS IN ADDITION TO LOCATIONS INDICATED ON ELEVATIONS (TYP.)
CJ-01
PREFINISHED GUTTER AND DOWNSPOUT PROVIDED BY PEMB SUPPLIERDS-01
EXTERIOR LIGHT FIXTURE - SEE ELECTRICAL SCHEDULEEL-01
42" STEEL HANDRAILGR-02
RIDGE VENTRV-01
EXTERIOR DOOR - SEE DOOR SCHEDULEDR-01
ELEVATION NOTES
1. COORDINATE BUILDING SIGNAGE LOCATIONS AND SIGNAGE WITH OWNER. REFER TO
ELECTRICAL DRAWINGS FOR SCHEDULE AND LOCATION.
2. MATERIAL MANUFACTURERS AND COLORS INDICATED ON DRAWINGS ARE SUBJECT TO
CHANGE DURING THE CONSTRUCTION PROCESS. ANY DEVIATIONS FROM APPROVED PLANS
SHALL BE SUBMITTED FOR APPROVAL.
PRE-FINISHED VERTICAL PBR OR EQUAL METAL WALL PANEL
B.O.D.: MBCI PBR
COLOR: LIGHT STONE
MT-22
SCREW DOWN METAL ROOFING SYSTEM
COLOR: GALVALUME
R-04
FIRE RISER AND ELECTRICAL ROOM IDENTIFICATION SIGNAGESG-01
KNOX BOX - LOCATION TO BE DETERMINED BY FIRE MARSHAL PRIOR TO
INSTALLATION
KB-01
6" DIA. BOLLARD - SEE STR. FOR DETAILS; COORDINATE LOCATION WITH CIVILBD-01
F.F.
0' - 0"
A C J
EAVE HEIGHT
29' - 0"
TUNNEL F.F.
-15' - 0"
A-402
A-402
2'
-0
1" 12"
1" 12"
OPEN
T.O. BRACE WALL
16' - 0"
A-412
B D E F G H I
EL-01
DS-01
GR-01
RV-01
EL-01EL-01EL-01EL-01
DS-01
MT-22
BD-01BD-01
F.F.
0' - 0"
ACJ
EAVE HEIGHT
29' - 0"
TUNNEL F.F.
-15' - 0"
A-402
A-402
1" 12"
1" 12"
T.O. BRACE WALL
16' - 0"
A-411
A-411
BDEFGHI
EL-01
DS-01
GR-01
RV-01
EL-01 EL-01 EL-01 EL-01
DS-01
MT-22
CIP-01
BD-01BD-01
BD-01
Phone: (770) 345-2579
135 P RICKMAN INDUSTRIAL DR.
SUITE 100 CANTON, GA 30115
© 2023, CSC Design. These drawings are protected by the copyright laws of the United States. These drawings or any part thereof may not be used for any purpose or reproduced in any form or by any means without the written consent of CSC Design.
CSC
DESIGN,
INC.
ARCHITECTS ENGINEERS&
PROJECT NUMBER:
R E
V
IS
IO
N
S
/3
/2
:3 :3
P
M P
-0
D o u g la s L a n d fi ll
T ra n s fe r S ta ti o n \A rc h \N e w
T ra n s fe r S ta ti o n \0
R
E V
IT
\2
-0
N e w T ra n s fe r S ta ti o n .r v t
A-301
FOR CONSTRUCTION
EXTERIOR
ELEVATIONS
C S
C .2
3.
1.
24-025
N E
W D
O U
G L
A S
C O
U N
T Y
W A
S T
E T
R A
N S
F E
R S
T A
T
IO
N
C
O U
N T
Y S
E R
V
IC
E S
R O
A D
D O
U G
LA
S
V
IL
LE
G A
N O
D
A T
E
IS
S
U E
A-301 | 1/8" = 1'-0"1 FRONT ELEVATION
A-301 | 1/8" = 1'-0"2 REAR ELEVATION
For R
EXTERIOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .