PERFORMANCE REQUIREMENTS SUMMARY (PRS)

COL Koehler Plaque Removal/Relocation

Performance Objective (from PWS Section 5)

Performance Standard Acceptable Quality Level Method of Surveillance Incentive / Disincentive

Work description, procedures and compliance

SOW, SEC. 1.4.1

and 1.4.2

Work is to be performed IAW with all federal, state, and local regulations.

Work is as per the SOW or payment may be withheld.

Periodic Inspection and customer feedback.

Contractor may not be paid in full until the customer and COR are in agreement that all aspects of the

SOW

requirements are met.

Removal of plaque

SEC 1.4.1

Contractor shall minimize damage to existing structure and safely remove plaque from the wall IAW SOW.

100% ‐ Contractor is required to meet the expected performance standards with minimal damage to the wall and no damage to the plaque

Direct observation and inspection of plaque and wall upon removal.

Contractor responsible for repairing any damage to the plaque or wall during process.

Repair of removal site

SEC 1.4.1

Contractor shall ensure wall is repaired IAW SOW with new brick and point.

Brick and wall repair blend in with surrounding wall.

Direct observation performed periodically or through 100% surveillance.

Periodic inspections.

100% completion of this task is necessary for payment.

Performance Objective (from PWS Section 5)

Performance Standard Acceptable Quality Level Method of Surveillance Incentive / Disincentive

Installation of plaque SOW SEC 1.4.2

Contractor must install the plaque IAW SOW and ensure the plaque is securely mounted to the wall.

Shall be submitted as per the SOW requirements.

Contractor is expected to meet the standards of the Service requirements.

Direct observation of installation and periodic inspections.

100% completion of this task is necessary for payment.

Clean up of work site SOW SEC 1.4.1

Contract must clean up work site daily IAW SOW.

100% ‐ Contractor expected to clean up all dust/debris at work site daily.

Periodic inspections and final walk thru with COR when project complete.

100% completion of this task is necessary for payment.