New Dutton (BP #2) - Advertisement for Bid.pdf
PDF 45 KB Posted
- Attached to
- Caledonia Schools - Dutton Elementary Bid Pack 2
- Solicitation number
- RFP - CCS - 240000000105
- Issued by
- Kent County, Capac Village, Michigan
About this file
The document is an Advertisement for Bids for the New Dutton Elementary Bid Package #2 project, issued by Caledonia Community Schools (the Owner) in Caledonia, Michigan. The project will be managed by The Christman Company (the Construction Manager) and designed by Tower Pinkster (the Architect/Engineer). Bids are being solicited for various work categories described in the Project Manual, with a submission deadline of Thursday, November 2, 2023 at 11:00 AM. A pre-bid conference will be held on October 18, 2023, and all questions must be directed to the Construction Manager by October 26, 2023. Bids must include a 5% bid security, and the successful bidder will be required to provide performance and payment bonds. Bid documents are available on Procore, and bids will remain valid for 60 days after the submission date.
The Advertisement for Bids does not provide details on pricing, set-asides, incumbents, funding sources, or other financial information. It focuses solely on the administrative requirements and timeline for the bidding process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| New Dutton (BP #2) - Add 1.pdf | ||
| New Dutton (BP #2) - Advertisement for Bid_ADD #2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Caledonia Community Schools – New Dutton Elementary BP 2 Project Manual The Christman Company October 13, 2023
00 11 13 Advertisement for Bids 5
00 11 13 Advertisement for Bids
Project: Caledonia Community Schools – New Dutton
Elementary Bid Package No. 2 – Building Superstructure/Enclosure/Finishes/MEP+F/S
Owner: Caledonia Community Schools
8948 Kraft Ave. SE Caledonia, MI 49316
Owner’s Representative: Plante Moran Cresa
3000 Town Center, Suite 100 Southfield, MI 48075
Architect/Engineer: Tower Pinkster
4 Fulton St. E, Suite 200 Grand Rapids, MI 49503
Construction Manager: The Christman Company
801 Broadway Ave NW, Suite 300 Grand Rapids, MI 49504
Proposals for all work categories as described in the Project Manual for the above project will be received no later than Thursday, November 2, 2023 at 11:00 AM. Proposals should be addressed to Josh Bachert, Project Manager, and hand delivered to The Christman Company at 801 Broadway Ave NW, Suite 300, Grand Rapids, MI 49504. All required proposal documents including the trade contractor proposal form, bid security, and affidavits shall be completed in full and included as attachments to the submitted bid.
Bids will be opened and read aloud on the date bids are due, at 12:00 pm. Bid opening will be virtual via Microsoft Teams. A link to join the meeting will be sent out prior to it taking place.
All contractors bidding on work must be bondable and must include on their bid form the cost for furnishing a Co-Obligee Labor and Material Payment Bond and a Co-Obligee Performance Bond. On the proposal form the contractor will identify a cost to be added to their bid should bonds be required.
There will be a pre-bid conference held at the project site (4950 76th Street SE, Caledonia, MI 49316) on Wednesday, October 18, 2023, at 10:00 AM conducted by the Construction Manager. It is strongly recommended that bidders attend the pre-bid conference.
Bid documents are available on Procore. For access to the bid documents, contact Josh Bachert (josh.bachert@christmanco.com) to be added to the project site.
All questions are to be directed to the Construction Manager, sent to Josh Bachert (josh.bachert@christmanco.com). No direct contact with the Owner or Architect is allowed. The
Caledonia Community Schools – New Dutton Elementary BP 2 Project Manual The Christman Company October 13, 2023
00 11 13 Advertisement for Bids 6 deadline for questions is Thursday, October 26, 2023 at 5:00 PM.
Each Proposal shall be accompanied by a certified check, cashiers' check, money order, or bid bond made payable to The Christman Company in an amount not less than five percent (5%) of the base bid as a bid security. The Bid Security of Bidders under consideration will be returned immediately after award of contracts by the Construction Manager. The amount of the guarantee shall be forfeited to the Owner if the successful Bidder fails to enter into a contract and furnish required bonds and insurance within 30 days after award of contracts.
Bid documents will be available by the close of business on October 13, 2023. Bid documents may be downloaded online via Procore. Contact Josh Bachert at josh.bachert@christmanco.com to be added to the bidders’ list and receive downloading instructions.
All proposals submitted shall remain valid for a period of sixty (60) days after the bid date. The Owner, Architect, and Construction Manager reserve the right to waive any irregularities, reject any or all proposals, or accept any proposal, which, in their opinion, will serve their best interest.
END OF SECTION