About this file
This document is an Addendum No. 1 related to the Dutton Elementary School Early Site Package contract opportunity for Caledonia Community Schools in Caledonia, Michigan. The addendum includes changes and clarifications to the original bidding documents, such as revisions to the concrete sidewalk layout, addition of silt sacks, changes to the underdrain system, and updates to the grading plan. The original bid issue date was September 8, 2023, and this addendum was issued on September 22, 2023. The project is located at 4950 76th Street, SE in Caledonia, Michigan, and the contracting authority is Caledonia Community Schools.
The addendum does not include any changes to the bidding requirements, contract conditions, or specifications. The changes are focused on the drawings, including C 101, C 200, C 201, C 204, and C 503. The addendum does not provide any information about pricing, set asides, incumbents, funding sources, or other salient commercial terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| New Dutton (BP #2) - Advertisement for Bid_ADD #2.pdf | ||
| New Dutton (BP #2) - Advertisement for Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nurturing curiosity through design since 1953 • towerpinkster.com
©2023 Tower Pinkster Titus Associates, Inc.
ADDENDUM NO. 1
DATE OF ISSUANCE: September 22, 2023
PROJECT: Dutton Elementary School Early Site Package
4950 76th Street, SE
Caledonia, MI 49316
OWNER: Caledonia Community Schools
ARCHITECT’S PROJECT NO.: 20167.30
ORIGINAL BID ISSUE DATE: September 8, 2023
SCOPE OF WORK
This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the Bid Form. Failure to do so may result in disqualification of the Bid.
DOCUMENTS INCLUDED IN THIS ADDENDUM
This Addendum includes 2 pages of text and the following documents:
• Bidding Documents: None
• Contract Conditions: None
• Specification Sections: None
• Drawings: C 100, C 200, C 201, C 204, C 503
CHANGES TO PREVIOUSLY ISSUED ADDENDA
None.
CHANGES TO BIDDING REQUIREMENTS
None.
CHANGES TO CONTRACT CONDITIONS
None.
CHANGES TO SPECIFICATIONS
None.
CHANGES TO DRAWINGS
9.22.2023 Addendum No. 1 // Dutton Elementary School Early Site Package // 20-167.30 2
©2023 Tower Pinkster Titus Associates, Inc.
ADD-1 Item No. D-1 - Sheet C 101
Refer to Sheet(s): C 101
The location of the concrete sidewalk on the west side of the gymnasium were revised to line up with the new door locations.
Concrete sidewalk was added to provide barrier free access to the playground area.
The playground area was revised per landscape architect and is shown for illustration purposes.
ADD-1 Item No. D-2 - Sheet C 200
Refer to Sheet(s): C 200
The SESC details were not shown on the SESC plan and are now included.
Silt sacks are now included for the two (2) CBs near the playground on the east side of the building.
ADD-1 Item No. D-3 - Sheet C 201
Refer to Sheet(s): C 201
Underdrain is now included underneath the playground area.
CB 1 was revised to include the new underdrain connections.
A CB was added at the northwest corner of the playground area and is now labeled CB 15.
The CB in the grass area northwest of the playground area closer to the doors is now shown to connect to
CB 15 and is now labeled as CB 16.
ADD-1 Item No. D-4 - Sheet C 204
Refer to Sheet(s): C 204
Grading points were revised on the west side of the gymnasium for the revised door locations.
Grading points were added to the new sidewalk adjacent to the playground.
Additional grading points were added in the greenspace north of the new sidewalk to illustrate the drainage pattern and the drainage swale labeled.
Additional grading points were added to the playground area.
Additional grading points were added west of the playground and basketball court area to illustrate a drainage swale and a label was added.
ADD-1 Item No. D-5 - Sheet C 503
Refer to Sheet(s): C 503
The underdrain detail was modified to change the underdrain pipe size to be as specified.
END OF ADDENDUM.