NED_Home_Rehab_-_124_Millet_Cir.pdf
PDF 199 KB Posted
- Attached to
- NED Home Rehab - 124 Millet Cir
- Solicitation number
- NED-S-124-082625
- Issued by
- Escambia County, Florida
About this file
This is a Request for Quote (RFQ) issued by Escambia County, Florida for a Neighborhood and Economic Development (NED) Home Rehabilitation project located at 124 Millet Circle. The RFQ seeks a licensed and insured general contractor to perform residential rehabilitation work, including plumbing repairs, cabinetry replacement, and window replacement. The project is part of the SHIP (State Housing Initiatives Partnership) repair program, aimed at making the home safer, more energy efficient, and more accessible. Key dates include a mandatory pre-quote meeting on September 3, 2025, a question submission deadline of September 10, 2025, and a quote response deadline of September 11, 2025 at 1:00 pm. The county plans to review quotes on September 12, 2025.
The project requires electronic quote submissions through OpenGov Procurement, with vendors needing to create a free account to participate. Contractors must provide proof of Sunbiz registration, a W-9, and a contractor's license. The scope of work includes repairing a leaking water supply line, installing new kitchen and bathroom fixtures, replacing a damaged kitchen sink base cabinet and countertop, and replacing a broken window with a new vinyl impact window. The county may award line items separately for emergency services and notes there is no federal funding for this project. Vendors must also provide a certificate of insurance that lists Escambia County as an additional insured.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Scope_Materials_List.docx | DOCX document | |
| SCOPE_-_124_Millet_Cir_-_Randall_C.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ
NED-S-124-082625
NED HOME REHAB - 124 MILLET CIR
Escambia County
213 Palafox Place
Pensacola, FL 32502-5822
RELEASE DATE: August 26, 2025
DEADLINE FOR QUESTIONS: September 10, 2025
RESPONSE DEADLINE: September 11, 2025, 1:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/escambiacountyfl https://secure.procurenow.com/portal/%7bproject.government.code%7d
Escambia County
RFQ
NED Home Rehab - 124 Millet Cir
1. Introduction
2. Project Details
3. General Terms and Conditions
4. Pricing Table
5. Vendor Submissions
Attachments:
A - SCOPE - 124 Millet Cir - Randall C
B - Bid Scope Materials List
RFQ #NED-S-124-082625
Title: NED Home Rehab - 124 Millet Cir
1. Introduction
1.1. Summary
Residential Rehab - contact Scott Sanchez, NED with questions, 850-595-0827, jssanchez@myescambia.com. General Contractors that are licensed, insured, and in good standing with the County are eligible to bid on the attached scope. New contractors with the county are required to submit a letter of insurability agreeing to these requirements. Escambia County may award Line item by
Line item for emergency items limited to roofing and septic/sewer services. Only OPENGOV submitted bids will be accepted.
1.2. Contact Information
Scott Sanchez
Housing Rehabilitation Specialist
221 Palafox Place #305
Pensacola, FL 32502-5822
Email: jssanchez@myescambia.com
Phone: (850) 595-0827
Department:
Neighborhood and Human Services
1.3. Timeline
Release Project Date August 26, 2025
Pre-Quote Meeting (Mandatory) September 3, 2025, 9:30am
124 Millet Cir
Question Submission Deadline September 10, 2025, 1:00pm
Quote Due Deadline September 11, 2025, 1:00pm
Quote Review Date September 12, 2025
2. Project Details
2.1. Important Instructions for Electronic Submittal
Escambia County is accepting electronic quote submissions. Bidders shall create a FREE account with
OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have mailto:jssanchez@myescambia.com mailto:jssanchez@myescambia.com tel:(850)595-0827 https://procurement.opengov.com/governments/3340/signup completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
2.2. Scope of Work or Project Details
SCOPE OF WORK
The rehabilitation of this owner-occupied, single-family, residence is to make the home safer, more energy efficient, and easier to access within the provisions of federal, state, and county laws and ordinances and the SHIP repair program. The rehabilitation of this home will include the following tasks as outlined below and the repaired areas are to match as close as possible to their existing surroundings.
If additional tasks beyond those included in this scope are discovered, then additional funds may be allocated. Before any additional work is performed, written county approval will be needed. There is no federal funding for this project.
1.PLUMBING:
Repair the damaged fresh water supply line that is leaking in the laundry room as per Escambia County
Building Code and repair any damaged or missing drywall. Install a new stainless-steel double bowl kitchen sink, faucet with sprayer, a 3/4hp garbage disposal, and new waste lines. Install two new matching vanity sinks and faucets with a pop-up drains in the master bathroom and replace all ¼ turn brass shutoff valves on fixtures, new braided supply lines, and replace any old piping and fittings associated with these repairs.
Plumbing total $_____________
2.CABINETRY:
Replace the existing damaged kitchen sink base cabinet with a new matching all-wood cabinet to match the existing configuration. Replace the existing kitchen countertop with square-edge laminate tops, including 4” side and back splashes to match the existing configuration.
Cabinetry total $______________
3.WINDOWS:
Replace one window on the left side of the home that is broken with a new single-hung vinyl impact windows as per the Escambia County Building Code. This unit is to be complete with trims, screens, and low-e glass. Repair any windowsill or buck that is rotten or damaged.
Windows total $_____________
Review the “Bid Scope Materials List” for product lines and or their equivalents.
3. General Terms and Conditions
Escambia County General Terms and Conditions apply to all Purchase Orders resulting from a request for quotes. See the full list of terms and conditions here:
https://myescambia.com/our-services/purchasing/vendor-registration/uniform-contract-format
If you are performing work on Escambia County property, you must provide proof of a certificate of insurance that meets the County’s standard requirements and lists Escambia County as an additional insured. Vendors should contact the designated department or project representative to confirm specific insurance requirements before proceeding with work.
4. Pricing Table
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Plumbing 1 1
2 Cabinetry 1 1
3 Windows 1 1
TOTAL
5. Vendor Submissions
5.1. I understand that this is a written quote request not a formal bid or solicitation. *
☐ Yes https://myescambia.com/our-services/purchasing/vendor-registration/uniform-contract-format
☐ No
*Response required
5.2. I confirm that the pricing submitted in the Pricing Table is valid for the purposes of this written quote request*
☐ Please confirm
*Response required
5.3. Supporting Documents or Specifications for Quotes
Please upload any supporting documents for your quote here such as technical or detailed specifications for solution provided.
5.4. Proof of Sunbiz Registration*
Please provide proof of Sunbiz registration in your submission packet for the quote. Vendors outside the State of Florida are still eligible to participate in purchases with Escambia County, but you must register in Sunbiz before we can issue a payment or finalize the award.
*Response required
5.5. W-9*
Please Provide a copy of your W-9. If awarded the quote, the department will need your W9 to add you to our system for issuing a Purchase Order.
*Response required
5.6. Proof of Contractor Licensure*
Vertical Construction requires a contractors license.
*Response required
File details come from the government source that posted it. Updated .