NEC Change Order Notice_V2.pdf

PDF 1 MB Posted

Attached to
CHANGE ORDER NOTICE - NEC ABIS Interface
Solicitation number
27-493ISP-ADMIN-B-53558
Issued by
Illinois

About this file

This is a Change Order Notice issued by the Chief Procurement Office for General Services involving the Illinois State Police (ISP) and NEC for Criminal History Record Information (CHRI) system interface modifications. The ISP requires NEC to update the Interface Control Document (ICD) and complete Phase 1 interface modifications to enable the existing Automated Biometric Identification System (ABIS) to integrate with a new CHRI system planned for deployment in late 2028. The work includes transitioning the ABIS-CCH interface from legacy socket-based communication to standards-based web services and adding required functionality for SRE (Submission Results Electronic) and ERRT (Tenpring Transaction Error) transaction types. The ABIS system currently operates as a critical, interdependent partner system to the existing CHRI infrastructure, and modifications are necessary to ensure proper functionality with the new CHRI system when it goes live.

The total cost of this change order is $132,283.74. The ISP's CHRI replacement vendor is Computer Projects of Illinois (CPI), and NEC must develop and publish the revised interface specification for CPI to incorporate the additional functionality and modernized communication protocols into the new CHRI system. This Change Order Notice is being posted on the Bulletin/BidBuy for the required 14-day period due to the contract cost increase exceeding $25,000, and the work is considered germane to the original contract as the technical modifications were not reasonably foreseeable at the time the initial contract was executed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: ISP - IL State Police
ProcurementTitle: CCH Interface Modifications Phase I
BBREFNO.: 18-493ISP-ADMIN-P-1872
thedetails: The Illinois State Police (ISP) requires NEC to update the Interface Control Document (ICD) and complete Phase 1 interface modifications to ensure the existing Automated Biometric Identification System(ABIS) can integrate with the new Criminal History Record Information (CHRI) system planned for deployment in 2028. This work includes transitioning the ABIS‑CCH interface from legacy socket‑based communication to standards‑based web services and adding required functionality for SRE (Submission Results Electronic) and ERRT (Tenpring Transaction Error) transaction types and totals $132,283.74

ISP's current Automated Biometric Identification System (ABIS) and Criminal History Record Information (CHRI) systems utilize NEC's ICD v1.4. The ISP is in the process of replacing its legacy CHRI system. The ABIS system is a critical, interdependent partner system to the CHRI. The technical interface that enables communication and data exchanges between the ISP ABIS and CHRI systems in production today must undergo modification in order to function correctly when deployed with the new system CHRI in late 2028. The ISP's CHRI replacement vendor is Computer Projects of Illinois (CPI).

NEC must complete the work of developing and publishing a new ICD. The revised interface specification will be provided to CPI so that the additional functionality and the modernized communication protocols are programmed and in place when the new CHRI system goes live in 2028.

CheckBox1: 1
CheckBox2: 1