This is a Performance Work Statement for the installation of a Technical Services Group (TSG) 501015 interlock system in the x-ray vault at Building 536, Joint Base Charleston. The TSG 501015 unit represents an upgrade featuring enhanced LED and conversion capabilities for the existing interlock system.
The vendor must provide certified service technicians to perform all installation and repair work required to make the x-ray vault interlock system operational without a waiver. Key deliverables include removal of the existing monitoring system and installation of the TSG 501015 with appropriate wiring; evaluation and replacement of door switches with TSG 503008 CDRH switches if necessary; installation of Federal Signal Red Beacons to replace existing beacons if required; proper installation of the 501015 Interface box and cable set; software evaluation and testing to verify proper operation; removal and preparation of unusable components and cabling for base disposal; site cleanup upon completion; and basic training on interlock operation for available personnel. The completed installation must comply with 21 CFR 1020.40 (US Code of Federal Regulations). Work must be coordinated with the 437th Maintenance Squadron (MXS) hours of operation, which are 06:30 AM to 12:00 AM, Monday through Friday, unless otherwise notified by Non-Destructive Inspection Supervision.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
INSTALLATION OF TECHNICAL SERVICES GROUP 501015 IN X-RAY VAULT
BUILDING 536
JOINT BASE CHARLESTON
GENERAL REQUIRMENTS: This performance work statement (PWS) is designed to define the expectations and deliverables for those certified service technicians and the company that will assist the 437th MXS Joint Base Charleston for the installation of the Technical Services Group (TSG) 501015 unit in the x-ray vault. TSG has upgraded LED and conversion of the TSG 501015 interlock and now needs to remove and replace old unit and connect new unit in x-ray vault.
SCOPE OF WORK:
o The certified service technicians shall perform all repairs and updates as required to get the X-ray vault interlock system, located in Building 536 on Joint Base Charleston operational so we can x-ray machine without a waver. The vendor shall provide all certified service technicians to carry out all work and operations as necessary.
o TSG technicians will remove the existing monitoring system from the room and replace it with a TSG 501015 wired appropriately.
o The switches on the doors will be evaluated. They will be replaced with TSG 503008 CDRH switch included with the 501015, if necessary.
o If necessary, Federal Signal Red Beacons included with the 501015 will be installed to replace existing beacons.
o The 501015 Interface box will be properly installed as well as the cable set.
o Technicians will evaluate software and installation to verify proper operation.
o TSG will remove any unusable components, cabling, etc., and prepare them for base disposal.
o TSG will leave the area clean upon completion.
o TSG will provide basic training on the use of the interlock to personnel available at the completion of the installation.
o Completed installation will be in compliance with US Code of Federal
Regulations: 21CFR1020.40
GENERAL INFORMATION: 437 MXS hours of operation are 06:30AM to 12:00AM, Monday through Friday, unless otherwise notified by the Non-Destructive Inspection Supervision.