NCR MATOC Rate Sheet.pdf

PDF 101 KB Posted

Attached to
NATIONAL CAPITAL REGION MULTIPLE AWARD TASK ORDER CONTRACT DRAFT SOW Federal contract opportunity
Solicitation number
W51EW7-26-R-NCR2
Issued by
Department of the Army

About this file

This document is a Rate Sheet for the National Capital Region (NCR) Multiple Award Task Order Contract (MATOC) with solicitation number W51EW7-25-R-A006. The rate sheet provides Not-To-Exceed (NTE) hourly rates for professional labor categories across a five-year base ordering period and two option years, specifically for labor categories including Program Manager, Project Superintendent, and Quality Control Inspector. The document indicates that these rates are fully burdened with fringe benefits and will be incorporated into the base contract for task order price proposals.

The rate sheet includes two key sections: labor category hourly rates and overhead/profit percentages. Both G&A and Profit percentages are set at 0.0% across all years, and bonds are specified to be cost-only with no additional profit, G&A, or overhead allowed. The document emphasizes that contractors may quote rates lower than the stated NTE rates but cannot exceed them. Task orders may include all, some, or none of these rate categories, and the rates are specifically for professional labor categories not subject to the Construction Wage Rate Requirements Statute.

View the file

Other files for this federal contract opportunity

Other files attached to NATIONAL CAPITAL REGION MULTIPLE AWARD TASK ORDER CONTRACT DRAFT SOW, newest first.
File Type Posted
NCR MATOC SOW V6 DRAFT 7.1.25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Category N T

E H ou rl y R at es

B as ic

Y ea r

N T

E H ou rl y R at es

B as ic Y ea r

N T

E H ou rl y R ic

Y ea r

N T

E H ou rl y R ic

Y ea r

N T

E H ou rl y R ic

Y ea r

N T

E H ou rl y R

O pt io n Y ea r

N T

E H ou rl y R io n Y ea r

Program Manager

Project Superintendant

Quality Control Inspector

Category N T

E A pp lie d Pe rc en ta ge

B as ic Y ea r

N T

E A pp lie d Pe rc en ta ge

B as ic Y ea r

N T

E A pp lie d Pe rc en ta ge ic

Y ea r

N T

E A pp lie d Pe rc en ic

Y ea r

N T

E A pp lie d Pe rc en ic

Y ea r

N T

E A pp lie d Pe rc en io n Y ea r

N T

E A pp lie d Pe rc en ta ge

O pt io n

Y ea r

G&A (Applied to total cost less bonds) Profit (Applied to total cost to include G&A less bonds)

Five (5) Year Base Ordering Period

Five (5) Year Base Ordering Period

Bonds shall only be cost, no profit, G&A or overhead allowed on bonding

NOTE: These rates will be incorporated into the base contract and all rates in this attachment shall be Not To Exceed (NTE) rates the offerors will use when preparing Task Order price proposals. Contractors may quote less than the stated rates but are not to exceed what is in this attachment for each Task Order. Based on individual task Order Requirements, task Orders may include all, some or none of these rate categories.

Attachment XX - Rate Sheet National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)

RFP # W51EW7-25-R-A006

Professional Labor Category Rate Requirements- Not Subject to the Construction Wage Rate Requirements Statute

All rates are NTE per year and are hourly rates and are fully burdened w/Fringe Benefits. *Fully burdened hourly labor rates for the six (6) month extension of services option ordering period will be the same as the fully burdened hourly rate for the option year two (2) ordering period

Sheet1

Text1:
Text2:
Text3:
Text10:
Text12:
Text13:
Text14:
Text9:
Text8:
Text7:
Text6:
Text5:
Text4:
Text15:
Text16:
Text21:
Text20:
Text19:
Text18:
Text17:
Text11:
Text22:
Text23:
Text24:
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Text31:
Text32:
Text33:
Text34:
Text35:

File details come from the government source that posted it. Updated .