Nay_Aug_Basketball_Pickleball_Courts_Bid_Form_7-8-24.pdf

PDF 174 KB Posted

Attached to
Nay Aug Multicourt Project
Solicitation number
Not on record
Issued by
Lackawanna County, Pennsylvania

About this file

This document is a comprehensive bid form for the Nay Aug Park Basketball/Pickleball Courts project, issued by the City of Scranton Office of Business Administration in Pennsylvania. The bid opportunity involves constructing multicourt facilities with a detailed list of 40 distinct line items to be completed on a lump sum (LS) basis, including site preparation, court construction, infrastructure improvements, and landscaping. The project encompasses mobilization, demolition, excavation, basketball and pickleball court construction with multiple layers of subbase and asphalt, surface coatings, net and pole installations, fencing, sidewalks, parking lot work, stormwater management, and additional site amenities. The bid is scheduled to be received online through the City's e-Procurement Portal until 10:00 am on Thursday, August 8, 2024, with bid opening occurring in City Council Chambers and a video broadcast available on YouTube.

The bid form provides a structured template for contractors to quote unit prices, though the specific pricing columns are currently blank. The project requires comprehensive documentation including certificates of insurance, affirmative action statements, non-segregated facilities forms, non-collusion affidavits, and contractor disclosures. Potential bidders must register on the city's e-Procurement Portal to access documents and submit responses, with technical questions and clarification requests due by 4:30 pm on Thursday, August 1, 2024. The scope involves significant infrastructure development at Nay Aug Park, including court surfaces, associated structures like benches and shade structures, fencing, lighting infrastructure, stormwater management systems, and landscaping, suggesting a holistic park improvement initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nay Aug Park Basketball/Pickleball Courts

ITEM

UNIT OF

MEASURE

QUANTITY

REQUIRED UNIT PRICE TOTAL COST

Mobilization LS 1 Demolition LS 1 Excavation/Fill LS 1 Basketball and Pickleball Court 6" 2a Subbase LS 1 Basketball and Pickleball Court 3" Base Ashphalt Pavement LS 1

Basketball and Pickleball Court 1 1/2" Surface Ashphalt Court Pavement LS 1

Basketball and Pickleball Court Acrylic Surface Coating w/ Striping LS 1

Picleball Court Net and Posts LS 1 Pickleball Benches/Shade Structure/Foundations LS 1 Basketball Bleachers/Foundation LS 1 Basketball Pole/Net/Foundation LS 1 48" Vinyl Chainlink Fence with Gates LS 1 8' Vinyl Chainlink Fence with Gates LS 1 Sidewalk - 6" 2a Stone LS 1 Sidewalk - 1 1/2" Ashpalt Wearing Course LS 1 Parking Lot - 6" 2a Stone LS 1 Parking Lot - 3" Asphalt Base Course LS 1 Parking Lot - 1 1/2" Ashpalt Wearing Course LS 1 Parking Lot Paint/Cross Walk Paint LS 1 Reset Existing Light Pole Foundation to Proposed Grade LS 1 Conduit and Wire Relocation for Existing Lighting LS 1 Conduit for Future Lighting at Pavement Crossings LS 1 Above Ground Basin including Excavation/Fill LS 1 Basin Outlet Control Structure LS 1 12" Conveyance Pipe LS 1 15" Conveyance Pipe LS 1 18" Conveyance Pipe LS 1 24" Conveyance Pipe LS 1 Stormwater Manhole LS 1 Stormwater Nyloplast Drain Basin Inlets LS 1 Stormwater 24"x24" Concrete Inlets LS 2 Trench Drain LS 1 Endwall LS 1 Riprap Apron LS 1 E&S Control LS 1 Seeding LS 1 Landscaping LS 1 Pavillion Concrete Pad LS 1

Estimate

File details come from the government source that posted it. Updated .