Navios Salient Characteristics.pdf
PDF 67 KB Posted
- Attached to
- Beckman Coulter Flow Cytometry Reagents and Maintenance, Service Training & Upgrade of Instruments
- Solicitation number
- W81K0223Q0060
- Issued by
-
Department of the Army Medical Command
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Navios PWS_DRAFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOW CYTOMETRY SALIENT CHARACTERISTICS
The Contractor shall provide flow cytometry reagents used in support of the mission at Madigan Army Medical Center, Joint Base Lewis McChord, WA. The Contractor shall be responsible for maintaining government owned Beckman Coulter Navios 8 analyzer system and TQ Prep (inclusive of instruments, ancillary equipment (computer, external drives, printer, UPS, sturdy wheeled table, etc.), maintenance, services, repairs, support, and parts as required in order to maintain the systems in optimal operating condition at no extra cost to the Government.
The Contractor shall maintain government owned flow cytometry analyzers. The contractor shall provide training, supplies, reagents, unscheduled maintenance, and preventive maintenance for the equipment.
Reagents, maintenance, service, training, and laser upgrade shall be provided by a single contractor.
Reagents, calibrators, quality control, and consumables needed to perform the method validation for the new laser and reagents shall be provided by the contractor at no cost to the government.
Vendor must assist with the conversion of 8 color to 10 color panels and
The contractor must (shall) include 10 color/ 3 laser field upgrade kit.
The Contractor shall ship requested reagents within 24 hours upon request and be deliver within seven days. The reagents must be shipped and stored at the appropriate temperatures.
Reagents must have a shelf life not less than 6 months upon receipt.
Reagent quality controls must have a shelf life not less than 3 months upon receipt.
Alternate quality control shall be provided by the contractor if the newly delivered lots are within 2 weeks of their expiration date.
File details come from the government source that posted it. Updated .