Att_1_Schedule_10222014.doc
DOC document 63 KB Posted
- Attached to
- Custom Aluminum Rolling Platform/Pulpit Ladders
- Solicitation number
- NAMA-15-Q-0011
About this file
Attach 1 - Schedule of Prices
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NAMA-15-Q-0011_Q A_10312014.doc | DOC document | |
| SF_30R.pdf | ||
| Att_2_28_Inch_Ladder_Std_10222014.pdf | ||
| Att_6_FAR_CLAUSES_10222014.doc | DOC document | |
| Att_7_Quote_REQUIRE_10242014.doc | DOC document | |
| Att_8_PHOTOS_10222014.pdf | ||
| Att_5_FAR_52.212-4_Addendum10222014.doc | DOC document | |
| Att_4_All_Delivery__Locations_10222014.xls | XLS spreadsheet | |
| Att_2_34_Inch_Ladder_Std_10222014.pdf | ||
| Att_3_Ladder_Delivery_10222014.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAMA-14-Q-0059, Amendment 0001
NAR-NAMA-12-R-0002 OVERSIZE MAP AND PLAN FOLDERS
NAMA-15-Q-0011
ATTACHMENT 1
SCHEDULE OF PRICES - REVISED
Pricing: Fixed Price per ladder for the base and option year. Vendors shall quote pricing inclusive of all supplies, labor, and shipping.
CLIN = Contract Line Item Number; NTE = Not-to-Exceed; QTY MIN = Minimum quantity; QTY MAX = Maximum quantity; TOTAL CEILING PRICE = QTY Max (multiplied by) Fixed Unit Price Base Year: Months 1-12
| CLIN |
| DESCRIPTION |
| QTY |
MIN
QTY
MAX
| FIXED UNIT PRICE |
| TOTAL CEILING PRICE |
| 0001 |
| Preproduction submission. |
Note: 20 days after Contract award contractor shall submit fabrication drawings of 30 and 36 inch nominal width aisles ladders. These drawings shall be detailed build drawings. Drawings shall show correct placement of all members and components with detail showing all subassemblies. All dimensions shall be labeled and weld procedures indentified on the drawing. Government will accept or reject within 10 calendar days.
| 1 |
| 1 |
| $____________ |
| 0002 |
| Custom Aluminum Ladder 30 inch nominal width aisles IAW Specification (see Attachment 2). |
Note: 60 days after Contract award one (1) Ladder shall be available as the First Article Test (see Note 1).
| 70 |
| 80 |
| $________ |
| $________ |
Custom Aluminum Ladder 36 inch nominal width aisles IAW Specification (see Attachment 2).
Note: 60 days after Contract award one (1) Ladder shall be available as the First Article Test (see Note 1).
| 168 |
| 178 |
| $________ |
| $________ |
| 0004 |
| Documentation IAW specification including the Manufacturer’s Maintenance Instructions. |
(see Note (2))
| LOT |
| LOT |
| XXXXXXXXX |
| NSP |
BASE YEAR TOTAL CEILING PRICE
Option Year I: Months 13-24
| CLIN |
| DESCRIPTION |
| QTY |
MIN
QTY
MAX
| FIXED UNIT PRICE |
| TOTAL CEILING PRICE |
Custom Aluminum Ladder 30 inch nominal width aisles IAW Specification (see Attachment 2).
| 0 |
| 50 |
| $________ |
| $________ |
Custom Aluminum Ladder 36 inch nominal width aisles IAW Specification (see Attachment 2).
| 0 |
| 50 |
| $________ |
| $________ |
| 0007 |
| Documentation IAW specification including the Manufacturer’s Maintenance Instruction (see Note (2)) |
| LOT |
| LOT |
| XXXXXXXXX |
| NSP |
OPTION YEAR I TOTAL CEILING PRICE
TOTAL CONTRACT CEILING PRICE:
Notes:
(1) First Article Test. See Attachment 6, FAR Clauses, Paragraph 2, FAR 52.209-3, First Article Approval – Contractor Testing, Alternate 1. See Attachment 2, Ladder Specifications, First Article inspection shall include: weld inspection (specification para 3.2), dimension tolerances (specification para 2), load test (specification para 3), step spacing (specification para 6), finish (specification para 5), spring seating (specification para 2.3, 2.4).
(2) Manufacturer’s Maintenance Instructions. The manufacturer shall provide three printed copies of instructions: assembly (if required), use, and maintenance instructions with each delivery. The Maintenance Instructions shall include at a minimum the following:
(a) Visual inspection procedures to be followed prior to the setup and use of any unit.
(b) Visual inspection procedures to be followed after the initial setup and use of a unit to determine its fitness for continued use.
(c) General maintenance, such as cleaning, lubrication, and the replacement of unreadable and missing labels/markings, wheels, casters, and rubber pads, as recommended by the manufacturer.
(d) Instructions to properly tighten and secure (periodically or regularly) all threaded fasteners.
(3) Option Year Fixed Unit Price: The fixed unit price for the option year may vary based on the period of performance for the option year and the minimum and maximum quantities. .
(4) Delivery. FOB destination. Contractor shall be responsible for risk of loss and any damage to items during shipment (See FAR 52.212-4(j).
(5) Minimum Guaranteed Quantity. The initial order of ladders in the base year is the minimum guaranteed quantity. Additional orders could be placed for up to the maximum quantities on all CLINs. (See Attachment 6, FAR Clauses, Paragraph 4, FAR 52.216-19 Added orders will be a minimum of 10 ladders.
(6) Ordering officer: Any NARA, BCN warranted Contracting Officer.
File details come from the government source that posted it. Updated .