This is an A-E Industry Day presentation for the construction of a JIATF South Command and Control Facility at Truman Annex, NAS Key West. The presentation outlines the details of a 5-story, 186,000 sq ft facility with an estimated construction cost between $250-500 million.

The facility requires specialized construction features including augered cast-in-place pile foundations, precast construction with blast and wind resistance, approximately 30% SCIF space, and 50% raised access flooring. Key technical requirements include redundant HVAC systems, generators, and switchgear, multiple communication classifications, IDS with future ESS capability, and wet pipe fire protection with clean agent systems. The building will house an auditorium, command group spaces, JOC with overlook, data centers, warehouse with shop space, and vehicle storage. The site encompasses approximately 13 acres and includes features such as a flag court, controlled access areas, redundant electrical and communications infrastructure, and specialized spaces for vehicle displays and entry. The project will be executed in multiple phases (Phase A1-A4 and B1-B3) and must account for the corrosive coastal environment, requiring specific design considerations for sustainability and durability.

View the file

Other files

File Type Posted
JIATFS ZERO LEVEL Command Brief NAVFAC CAO 202411.pdf PDF
NAVFAC P215 CON Industry Day Slides.pptx PPTX presentation
P215 Industry day sign in.PDF PDF
NAVFAC SE SBP Slides_13NOV2024.pdf PDF
HSPD-12 Worksheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

CONSTRUCT JIATF SOUTH

COMMAND AND CONTROL FACILITY

A-E INDUSTRY DAY PRESENTATION

14 NOVEMBER 2024

2 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PROJECT SITE

Project Site on Truman Annex

NAS KW

Boca Chica

Nesting Platform Site

3 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

United Street Gate Project Location

Southard Gate

Barge Access

Existing JIATFS Facilities

Restroom Facility Comm Shelter

Downtown Key West Narrow Roads and Weight/Length Limits

Limited Housing/Lodging

4 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

United Street Gate

Project Location

Southard Gate

Barge Access

Existing JIATFS Facilities

Beach Access

NGIS/UA

MWR

EXISTING

JIATFS

HOUSING

5 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

ENCLAVE PLAN

United Street Gate

Project Location

Southard Gate

Barge Access

Existing JIATFS Facilities

6 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASING

PHASE A

CONSTUCT C2 FACILITY

• A1

• A2

• A3

• A4

PHASE B

DEMOLITION AND SITE

• B1

• B2

• B3

7 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE A1

8 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE A2

9 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE A3

10 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE A4

11 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE B1

12 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE B2

13 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

PHASE B3

14 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

SITE

15 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

SITE

16 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

SITE FLYTHROUGH

17 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

SITE RENDERINGS

18 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

19 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

20 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

21 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

22 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

23 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

FACILITY OVERVIEW

FACILITY OVERVIEW

• 5 STORY

• ~ 186,000 SQ FT

• AUGERED CAST-IN-PLACE

PILE FOUNDATIONS

• PRECAST CONSTRUCTION

• PROGRESSIVE COLLAPSE

• BLAST AND WIND

• ~ 30% SCIF BY AREA

• ~ 50% RAISED ACCESS FLOOR

• HIGHER END FINISHES

• CORROSIVE ENVIRONMENT

24 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

SPACES

• ~ 30% SCIF

• ~ 50% Raised Access Floor

• AUDITORIUM

• SECURITY WITH ARMS SAFE

• COMMAND GROUP

• KITCHEN

• JOC

• JOC OVERLOOK

• DATA CENTERS

• WAREHOUSE WITH SHOP

• VEHICLE STORAGE

25 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

M-P-FP OVERVIEW

• REDUNDANT HVAC

• VAV, FAN ARRAY

• CHILLED WATER

• COOLING TOWERS

• SOLAR WATER HEATING W/ INST

• SMALL COMPRESSED AIR SYS

• 10 DAY FUEL SUPPLY

• 14 DAY HVAC WATER SUPPLY

• WET PIPE FP WITH CLEAN AGENT

26 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

ELEC-COMM OVERVIEW

• REDUNDANT GENERATORS

• 10 DAY FUEL SUPPLY

• 14 DAY HVAC WATER SUPPLY

• LIGHTING CONTROLS

• REDUNDANT SWITCHGEAR

• UPS

• MULTIPLE COMM CLASSIFICATIONS

• IDS, FUTURE ESS

• INFRA FOR ROBUST AV SYSTEMS

27 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

INTERIOR RENDERING 2

ADD RENDERING

28 Construct JIATFS C2 Facility, Truman Annex, NAS Key West

INTERIOR RENDERING

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22
Slide Number 23
Slide Number 24
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28

File details come from the government source that posted it. Updated .