This document is Amendment 0003 to Solicitation N6945024R0005, which is a design-build, firm-fixed-price construction contract with an award fee for an Ambulatory Care Center and Dental Clinic Replacement at Naval Station Guantanamo Bay, Cuba.

The key details of this amendment are:

  • It is intended for offerors selected to proceed to Phase II of the procurement, as identified in separate Evaluation Notices.
  • It updates the Solicitation Submittal Requirements to replace references to the DD 1155 form with the SF 1442 form.
  • It clarifies that offerors must submit two PDF files in response - one for the Non-Price Proposal and one for the Price Proposal.
  • It provides additional details on the evaluation factors, including the requirements for Factor 1 - Technical Approach, Factor 2 - Experience, Factor 3 - Past Performance, Factor 4 - Safety, and Factor 5 - Technical Solution.

The solicitation has a proposal due date of July 25, 2024. Pricing will be evaluated based on the total price, including all options. Award will be made to the offeror whose proposal is determined to represent the best value to the Government.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-9837

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N69450-24-R-0005, DESIGN BUILD FIRM-FIXED PRICE WITH AWARD FEE CONSTRUCTION CONTRACT - P-9837 AMBULATORY CARE CENTER AND DENTAL CLINIC REPLACEMENT AT NAVAL STATION GUANTANAMO BAY (NSGB), CUBA.

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945024R0005

X 9B. DATED (SEE ITEM 11)

09-Nov-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Mar-2024

CODE

NAVFAC ENGINEERING SYSTEMS COMMAND SE

CORE CONSTRUCTION

BLDG 903 YORKTOWN

PO BOX 0030

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945024R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

This amendment, and all subsequent amendments, to this solicitation are intended for those offerors that have been selected to proceed to Phase II, as identified in offerors Evaluation Notice (EN) provided separately from this amendment.

The purpose of this amendment is as follows:

1.) Update Solicitation Submittal Requirements paragraph (i) to replace reference to DD 1155 with SF 1442.

2.) Clarify Phase II Proposal Instructions to reflect that two PDF files should be uploaded, one for the Non-

Price Proposal and one for the Price proposal.

All other terms and conditions of the solicitation remain unchanged.

Acknowledgement of this Amendment is required with your proposal submissions.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

PHASE II PROPOSAL INSTRUCTIONS

Proposals submitted in response to this RFP must be received no later than 2:00 PM Eastern Time on 25 July 2024. Proposals must be uploaded to the Procurement Integrated Enterprise Environment (PIEE) portal, Solicitation Module, no later than the date and time stated above or PIEE will consider it a Late Offer.

https://piee.eb.mil/

Late Offers cannot be accessed by the Government without proper justification for the Late Offer. Proposal receipt will be provided by PIEE and by the Contract Specialist through return email. If email acknowledgement is not received, it is the Offeror’s responsibility to follow-up to ensure proposal receipt. The Offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The Offeror shall be compliant with the requirements stated herein, for non-compliance may result in your proposal being rejected as nonresponsive.

PROPOSALS SUBMITTED IN RESPONSE TO THIS REQUEST FOR PROPOSAL MUST BE RECEIVED NO

LATER THAN THE DATE AND TIME SPECIFIED. LATE SUBMITTALS WILL NOT BE CONSIDERED.

Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 "Instructions to Offerors – Competitive Acquisitions" and may be rejected. You are strongly encouraged to submit at least one day prior to avoid late submission (See FAR 15.208(b)(1)(i)).

In response to this Request for Proposal (RFP), the proposals shall be uploaded as two (2) electronic files. One file shall be the Phase II Non-Price Proposal and the other shall be the Phase II Price Proposal. Both files shall be formatted as Adobe PDF files and uploaded to the PIEE Portal. It shall be organized as follows:

A. Non-Price Proposal –

Section 5 – Factor 5, Technical Solution (See solicitation for Factor specifics)

Phase II Non-Price proposal shall not exceed 37 single sided pages (as further defined in Factor 5 in the solicitation) in length utilizing a minimum Arial Font or Times New Roman of 12 with pages numbered, or comparable size font for Factor 5 unless otherwise specified in the factor. Title page, table of contents, dividers and any pages specifically excluded under each factor do not count towards the total page count and should not be numbered. If page count exceeds 37 pages, only the first 37 pages will be reviewed.

The front of the Proposal should clearly state:

RFP Number and Title of Project Offeror’s Name Offerors shall include the following information with their proposals:

Authorized negotiator’s Point of Contact (POC) POC telephone number POC email address Unique Entity Identifier number (Offeror and any team members) CAGE Code

B. Price Proposal - (See solicitation for specifics) There is no page limitation for the price proposal.

The front of the Proposal should clearly state:

RFP Number and Title of Project Offeror’s Name Offerors shall include the following information with their proposals:

Authorized negotiator’s Point of Contact (POC) POC telephone number POC email address Unique Entity Identifier number (Offeror and any team members) CAGE Code

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:

1. One (1) signed bank reference demonstrating adequate financial resources.If offeror's firm has a line of credit - provide information on how many figures the offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signedby an authorized officer of the organization.

Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

3. Description of offeror's facilities and equipment.

4. Other offeror's work presently under contract.

Although required to be submitted with offeror's price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm's responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.

SECTION 00 22 13 - SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

The following have been modified:

EVALUATION FACTORS

EVALUATION FACTORS FOR AWARD

1. For Two-Phase DB procurement, Factors 1-4 will be evaluated in Phase I. Price and Factor 5 will be evaluated in Phase II. Factor 1 will be rated Acceptable or Unacceptable. If an Offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II unless corrected through discussions.

2. The solicitation requires the evaluation of price and the following non-cost/price factors:

Phase I:

Factor 1 – Technical Approach (acceptable/unacceptable) Factor 2 – Experience Factor 3 – Past Performance Factor 4 – Safety

Phase II:

Factor 5 – Technical Solution

Instructions to Offeror’s

FAR Part 9.6 defines Contractor team arrangements. Contractor team arrangement, as used in this subpart, means an arrangement in which -- (1) Two or more companies form a partnership or joint venture to act as a potential prime Contractor; or (2) A potential prime Contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent /LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate how the affiliate/subsidiary/parent/LLC/LTD member companies will have involvement in the performance of the contract in order for the experience information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g., personnel, management, equipment that the affiliate/subsidiary/parent/LLC/LTD member companies shall commit to the performance of this contract). In particular, the proposal shall clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in the performance of the contract. Vague commitments to support are likely insufficient;

rather, they must demonstrate intent/manner of actual performance on the contract action being solicited.

The Offeror shall submit a signed copy of partnership agreement, teaming agreement, or letter of commitment for each member of the Offeror’s team (e.g., partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.) whose projects are submitted to demonstrate Construction or Design Experience. The Government will not consider any project submitted for Factor 2 if it was performed by a firm other than the Offeror and there is no supporting partnership agreement, teaming agreement, or letter of commitment demonstrating the necessary level of meaningful involvement. Note: See specific restrictions on the use of subcontractor experience under Factor 2.

The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price Proposal

(1) Solicitation Submittal Requirements:

(i) Executed SF 1442. Offeror shall insert their MAC contract number in Block 1, its company name, address, Unique Entity Identifier (UEI) Number, CAGE Code, Federal Tax ID number, and telephone number in Block 9; signature, name and title of person authorized to sign and date signed in Block 16; and the price proposed on for the CLIN(s) in the Schedule of Supplies/Services. Price shall be considered available for award, based on the number of calendar days from award as stated on page 2 of the SF 1442.

(ii) Acknowledgement of all amendments (if applicable).

(iii) Bid bond (SF-24). Offeror shall submit a bid bond (SF24) in the amount of 20% of your total project bid price or $3,000,000 whichever amount is less.

(iv) SAM registration. Offeror shall ensure current registration on the SAM website, www.sam.gov, including Annual Representations and Certifications, are complete and updated for this procurement. If a Representation or Certification required by Section 00600 of the RFP is not provided in SAM, include the Representation or Certification in your price proposal.

(v) Federal Awardee Performance and Integrity Information System (FAPIIS). Offeror shall ensure FAPIIS

Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters is current through maintaining an active registration in the System for Award Management (SAM). Note: FAPIIS.gov is now responsibility/qualification information on SAM.gov.

(vi) VETS-4212 registration. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor website https://www.dol.gov/agencies/vets/programs/vets4212, if the offeror is required to submit. An email confirmation of submission can be requested and received by the offeror from the DOL website and submitted in the price proposal. If the offeror is not required to submit a report to VETS-4212, include a brief statement stating that the offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.

Note: The bid bond, SAM, and VETS-4212 registrations must be in the name/CAGE/UEI of the offeror identified on the SF 1442.

(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.”

(b) Non-cost/price Factors:

Factor 1 – Technical Approach:

(a) Solicitation Submittal Requirements:

The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.

The Offeror shall submit the following information:

(1) Provide a simple organizational chart that clearly identifies the lines of authority between the proposed primary construction firms and primary design firms for this contract. Include a brief description of the role and responsibility of each entity not to exceed (1) one single-sided page. If the experience of an entity is being claimed in Factor 2, that entity must be named in the organizational chart.

(2) In addition the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment signed by each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.). Letters of commitment for the Designer of Record shall be addressed from the Designer of Record to the Offeror. The Designer of Record’s letter of commitment shall be signed by the Designer of Record’s signing authority.

(b) Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis. If an Offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II unless corrected through discussions.

Factor 2 – Experience:

(a) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

(1) Construction Experience:

Submit a minimum of two (2) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as renovation and/or new construction of medical treatment facilities. At least one (1) of the submitted projects must be new construction. For the purposes of this evaluation, “Medical Treatment Facilities” are hospitals, ambulatory care centers, medical and dental clinics, and medical research laboratories. Relevant new construction projects submitted must consist of reinforced concrete or structural steel frame a minimum of 50,000 square feet. Relevant renovation projects must consist of renovations of a facility or multiple facilities of a minimum of 50,000 square feet.

Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this

RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

instead Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description shall also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through a Sustainable Third Party Certification program.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percentage of employees provided for the overall contract by the JV members as well as the overall percentage of work performed by the JV member. The Offeror shall also submit a SIGNED copy of the Joint Venture agreement indicating the proposed participation of each Joint Venture member. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. The Offeror MAY NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor unless specialized subcontractor experience is stated as acceptable. Failure to submit this information may result in a lower rating.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.

(2) Design Experience

Submit a minimum of two (2) and a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as renovation and/or new construction of medical treatment facilities. At least one (1) of the submitted projects must be new construction. For the purposes of this evaluation, “Medical Treatment Facilities” are hospitals, ambulatory care centers, medical and dental clinics, and medical research laboratories. Relevant new construction projects submitted must consist of reinforced concrete or structural steel frame and a minimum of 50,000 square feet. Relevant renovation projects must consist of renovations of a facility or multiple facilities of a minimum of 50,000 square feet.

A project submitted under design experience will meet the recency requirement if (a) the construction effort was completed within ten (10) years immediately preceding the proposal due date, regardless of the design completion date, OR (b) the construction effort is ongoing, but the design completion date was reached within the seven (7) years immediately preceding the proposal due date. Each relevant completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page or two (2) single-sided pages.

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through a Sustainable Third Party Certification program.

The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. Failure to submit this information may result in a lower rating.

The Offeror may utilize experience of a design subcontractor to demonstrate design experience. The Offeror must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating.

Offerors are still limited to a total of five (5) projects combined.

(b) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction and five (5) for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects that demonstrate design and construction experience for any of the following may be considered more favorably:

1. US Defense Health Agency / Military Medical Treatment Facility design and construction projects.

2. Federal and Veterans Affairs Ambulatory Care Center or Hospital design and construction projects.

Proposals demonstrating projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.

Proposals that demonstrate relevant projects that include sustainable features may be considered more favorably than those that do not include sustainable features.

Proposals demonstrating design-build experience may be considered more favorably than those that do not have design-build experience.

Projects completed by the Offeror as Prime Contractor may be considered more favorably than those completed by other than the Offeror (i.e. subcontractors).

Factor 3 – Past Performance:

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE CPARS evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (PPQ) (Attachment B) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed PPQ in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Matthew Abbott at matthew.j.abbott5.civ@us.navy.mil

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues.

Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

(b) Basis of Evaluation:

This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.

The Government will consider the recency and relevance of the information (as defined in Factor 2 - Experience), the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.

Past performance ratings of “Substantial Confidence” or “Satisfactory Confidence” hold more value than a “Neutral Confidence” rating and will be considered more favorably in the evaluation of past performance.

Factor 4 – Safety:

The Offeror shall submit the following information:

The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative as described further below. For a partnership, joint venture, the Offeror shall submit separate DART, TCR for the specified five (5) CY for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors.

(1) DART Rate: Submit five (5) previous complete calendar years’ [CY2022, CY2021, CY2020, CY2019, and CY2018] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. If the DART rate calculation is 0.0, affirmatively state there were no DART cases during that year.

(2) Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required, that includes any corrective actions taken for improvement.

a. Dart cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

(3) TCR Rate: Submit five (5) previous complete calendar years’ [CY2022, 2021, 2020, 2019, and 2018] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why.

Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required, that includes any corrective actions taken for improvement.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.

(4) Technical Approach for Safety: Submit a narrative that addresses the following:

a. Describe the Offeror’s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout the performance of the contract (to include their own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

(5) The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

(b) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

(1) DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the Offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing DART rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

(2) TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the Offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very

Low Risk (VLR) would indicate a strength.

c. An increasing TCR rate trend could be considered a weakness (i.e. MR or better to High Risk (HR) or

Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.

d. This chart correlates the TCR rate to the level of risk:

Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49

Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0

(3) The Technical Approach to Safety Narrative. To determine the degree to which the Offeror:

a. Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. Information on pages beyond this will not be considered.

(4) The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

Factor 5 – Technical Solution

(1) Provide a schedule, project narrative, and conceptual drawings, describing the technical solution to the project that meets the requirements of the RFP. Include the following:

a. A basic project schedule timeline should represent the entire project duration and identify key milestones such as design submittals, procurement and major construction items, along with their construction durations;

b. Illustrate and describe a site development plan which adheres to the RFP. Include the building(s) footprint(s), pertinent site features such as roadways, walkways, landscaping, and utility connections. Identify any site-related AT/FP requirements.

c. Illustrate and describe the overall architectural concept to include a rendering, block plans, room-by-room layout with Room Name and Room Code, exterior wall systems and finish materials, exterior and interior acoustics, floor-to-floor heights, elevations, and roofing materials. Address impact of technically complex equipment and medical systems. Also describe the gross square feet of your proposed building(s) design and confirm the Program for Design will be met with the proposed building(s).

d. Describe the basis for the proposed structural system. Address the seismic design considerations and the level of protection required.

e. Describe the whole building energy approach to provide a technical solution that meets requirements of ASHRAE 90.1 and methodology to achieve 30% or better reduction below baseline. Any deviation from the RFP requirements provided by the offeror that increases energy efficiency shall be supported with an energy optimization and LCCA prepared in accordance with UFC 1-200-02. Deviations that decrease the energy efficacy are not acceptable.

f. Illustrate and describe the design considerations and space requirements for the primary and secondary HVAC systems proposed and how they compare based on a Life Cycle Cost Analysis.

Identify equipment redundancies, continuity of service, spare capacity and space provisions for future expansion of energy plants and mechanical rooms.

g. Illustrate and describe design considerations and space requirements for all plumbing and medical gas systems. Describe design considerations and space requirements for medical gas systems to include types, storage, and distribution systems.

h. Illustrate and describe design considerations and interior/exterior space requirements for electrical systems. Include voltage selection, normal and essential or standby electrical systems; and lighting systems.

i. Illustrate and describe design considerations and space requirements for all communications systems required for the project.

j. Describe the commissioning schedule for a 3rd party commissioning agent. Describe procedures for achieving required commissioning of all commissioned systems.

k. Describe the rationale for the proposed transportation, logistics, waste management, and food service solutions. Describe major design parameters and features that address trash removal;

hazardous, infectious, and biological waste; retort sterilizers; and other waste handling features of the design.

(2) OCONUS Work Plan: Provide a work plan narrative demonstrating the Offeror’s ability to successfully carry out construction projects in OCONUS locations. The narrative shall include:

a. The Offeror’s plan for shipping materials and equipment to and from Naval Station Guantanamo Bay, Cuba. Materials and equipment are not available locally and must be provided at the contractor’s expense. Provide a plan of major equipment that is anticipated to be needed, major construction materials, and an anticipated plan for transporting to the worksite.

b. The Offeror’s plan for berthing and medical arrangements. Workforce lodging will not be available, therefore the Contractor shall construct new temporary housing facilities (man camp) in accordance with the RFP SECTION 00 73 01.00 25 for all prime and subcontractor workers required to complete this project. Provide a detailed plan of the temporary housing facilities including but not limited to housing capacity, design criteria, occupancy, shipping, delivery, and installation.

c. The Offeror’s medical plan of action. Describe how the Offeror will provide and sustain a healthy workforce which includes all employees and labor force.

d. The Offeror’s plan for Labor acquisition and sustainment. Local labor is unavailable and must be provided at the contractor’s expense. Provide a detailed plan of your expectations of the staffing requirements for this project, your source of labor for execution of the work, and management of personnel for the duration of the contract. Offerors that demonstrate prior experience establishing international labor agreements may be evaluated more favorably.

e. The Offeror’s plan for operation and demobilization of a concrete batch plant.

f. Provide any other aspects of OCONUS work that the Offeror feels is critical to a successful project.

The Schedule shall not exceed one (1) 11 x 17 single sided page. The project narrative shall not exceed ten (10) double-sided pages (or twenty (20) single-sided pages). A minimum of two (2) and maximum of ten (10) conceptual drawings shall be provided to supplement the narrative. The work plan narrative shall not exceed three (3) double-sided pages (or six (6) single-sided pages).

(b) Basis of Evaluation:

The Government will evaluate the schedule, project narrative, work plan narrative, and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the requirements of the project. The Government will evaluate the Offeror's technical solution in accordance to the following:

(1) Design concept which demonstrates compliance with the requirements of the RFP.

(2) Design concept which reduces the risk with respect to schedule delays. This includes accounting for long lead items, resource availability, and design and submittal reviews.

(3) Design concept which provides the greatest operational and maintenance value for the Defense Health

Agency. The design shall account for building systems that require less maintenance and account for the labor and repair parts available in this project location.

(4) Design concept which confirms that the building layout will meet requirements of the RFP regarding room adjacencies, separation of functions and circulation.

(5) Design concept which demonstrates the best qualities of overall site layout for operations, patient flow, and staff parking.

(6) Work plan that demonstrates an understanding of the complexities associated with performing work in Guantanamo Bay and highlights the solutions that the offeror will use to address those challenges.

(End of Summary of Changes)