N69450-23-R-0100 AMENDMENT 0005.pdf
PDF 504 KB Posted
- Attached to
- REPLACE HVAC SYSTEM - BUILDING 3766 Federal contract opportunity
- Solicitation number
- N6945023R0100
About this file
This amendment modifies Solicitation Number N6945023R0100 issued by the Department of the Navy Naval Facilities Engineering Command to replace the HVAC system at Building 3766. The amendment provides responses to contractor questions, clarifying that hazardous material surveys will be conducted after award, ceiling tile and grid will match existing in size and style, and only one pair of 6'x7' doors will be installed in the mechanical room. Proposals are due by 3 PM Central Time on September 8, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N69450-23-R-0100 AMEND 0004.pdf | ||
| SITE VISIT SIGN-IN SHEET - BLDG 3766.pdf | ||
| N69450-23-R-0100 AMEND 0003.pdf | ||
| PART 1- B3766 22X34 DWGS COMBINED.pdf | ||
| N69450-23-R-0100 - AMEND 0002.pdf | ||
| PART 2- B3766 22X34 DWGS COMBINED.pdf | ||
| N69450-23-R-0100 AMEND 0001.pdf | ||
| SECNAV 5512.pdf | ||
| N69450-23-R-0100 - REPLACE HVAC SYSTEM BLDG 3766.pdf | ||
| SOW - B3766 Final Specs 6-23.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6001034
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to incorporate the follow ing:
PPI Responses (See Page 2)
Proposals due on/by 3 pm (CST) Friday, 8 September 2023.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945023R0100
X 9B. DATED (SEE ITEM 11)
01-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2023
CODE
NAVFAC ENGINEERING SYSTEMS COMMAND SE
PWD CORPUS CHRISTI
8851 OCEAN DRIVE, BLDG 19
CORPUS CHRISTI TX 78419-5021
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945023R0100
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
PPI RESPONSES
1. Has there been any hazardous material surveys done on any of the existing door frames, doors, ceiling tile, brick, block, walls, insulation, ceiling insulation, if any? No – contractor to execute survey after award and present findings to Government. Modification, if necessary, to follow based on those findings.
2. Has there been a hazardous survey done on the mastic under the existing VCT or Carpet? No – contractor to execute survey after award and present findings to Government. Modification, if necessary, to follow based on those findings
3. On keynote #2 on A-101 it states to install 3’x7’ door and frame in mechanical room 106 but it has 2 locations on the drawings. During the site visit it was stated that there is only one 3’x7’ door and frame to be installed. Is there only one location or two locations where a 3’x7’ door and frame will be installed? Drawings indicate requirements; See attached for clarification.
4. Is the whole room in the new mechanical room 106 going to be painted? Or only the area where new wall is removed. No reference. Areas in public space must be painted. Mechanical room space can be taped and mudded.
5. Is the wall that is being removed between the conference room and breakroom a load bearing wall? Not to AE knowledge.
6. Is the louver above the door staying and a 20ga panel to be placed over the existing louver on both sides or just one side? Louver stays-Panel on inside
7. Is the new ceiling tile, ceiling insulation, ceiling grid to match existing, or is the existing to be reused?
Size Ceiling tile? Specs say 2X2. Drawings match existing.-Match existing by area
8. Demo Re: Page MD 101 – Demo Basement bathroom and Demo Basement Office.
Note D. States NO DEMOLITION WORK ON THIS SHEET. SEE NEW WORK SHEET FOR AIR FLOW VALES
FOR BALANCING.
Verifying No Demo work done in bathroom and basement.-Work is as indicated and specified
(End of Summary of Changes)
N6945023R0100
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
FINAL SUBMITTAL
hector.a.gomez Rectangle hector.a.gomez Line hector.a.gomez Line hector.a.gomez Callout Only install a pair of 6'x7' door as per note #2.
| N69450-23-R-0100 AMENDMENT 0005 |
| B3766 HVAC Door PPI AMEND 0005 |
File details come from the government source that posted it. Updated .