N6945022R0062_GPI_Responses.pdf
PDF 434 KB Posted
- Attached to
- GROUNDS MAINTENANCE AND LANDSCAPING SERVICES AT NAVAL AIR STATION MERIDIAN, MISSISSIPPI AND OUTLYING AREAS
- Solicitation number
- N6945022
About this file
This document contains responses to pre-award inquiries for a solicitation seeking grounds maintenance and landscaping services at Naval Air Station Meridian, Mississippi and surrounding areas. The Navy is seeking these services on an ongoing basis through a follow-on contract to the existing agreement. The incumbent contractor must abide by the current collective bargaining agreement. The dominant grass species on base is bahia. No security clearances or specific software are required. Equipment size is unrestricted and weed control spraying is prohibited. Maps in an appendix define mowing boundaries extending up to 750 feet from runways.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6945022R0062_CBA_IUOE_624.pdf | ||
| N6945022R0062 0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N69450-22-R-0062 Meridian Grounds
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.
1 4-May N/A N/A N/A Will you accept a bid from a company in the process of being 8A certified?
No. This procurement is an 8(a) set-aside. For competitive 8(a) procurements, a firm must be a current 8(a) participant eligible for award of the contract on the date specified in the solicitation for receipt of initial offers. Offers from any businesses without confirmed enrollment in the 8(a) program at the time of initial proposal submission will be considered inellegible for award.
2 4-May 18 Sec C 2.7.3 Will you require specific time keeping and accounting software?
No; Service Contract Reporting (SCR) requirements are not applicable to this solicitation and resulting contract.
Annex 0200000 Spec Item 2.7.3 will be removed from the Section C Performance Work Statement in a forthcoming amendment. The contractor's accounting practices are not dictated by the solicitation.
3 4-May 19 Sec C 2.8.4 Will our employees need security clearance to work on this project?
No; no security clearances will be required to perform work on the project. However, all prospective employees must be able to pass a federal background screening, submitted prior to reporting for work as identified in the Section C Performance Work Statement (PWS), Annex 0200000 Spec Item 2.8.4 Access to Installation and subordinate spec items. All employees are subject to removal at the discretion of the base commander.
4 6-May 15 Attachment
J-1503050-01 Definitions Please define edging
For the purposes of this contract, "edging" is defined as creating a uniform edged cut to promote a neat appearance and prevent ground structures from vegetation encroachment in areas where grass meets any concrete or asphalt surface, where grass abuts planter beds, or wherever needed to maintain grass delineation.
Refer to Section J Attachment J-1503050-01 Definitions and Acronyms.
5 6-May 20 Attachment J-
1503050-01 & J- 1503050-04
Map
Please define how far we are to cut along the roadside on each side? To the Ditch or fifty feet beyond? I noticed the power poles cut was beyond the power line. But on the site visit we were told we do not mow the power line right of way? Does this not include the power line along the roadway?
Areas to be mowed and the boundries thereof are presented in the maps which accompany the solicitation.
Refer to Section J Attachment J-1503050-04 Site Maps.
6 6-May 39 Sec C 3.1.1.1 Is there any limit on the type and size of mowers we can use? Improved or unimproved area? Airfield mowing equipment
No; the Government does not impose any equipment size limitations. Contractors should exercise due dilligence to ensure proposed equipment and proposed mowing schedule will satisfy the contract requirements as identified in the Section C PWS, Annex 1503050 Spec Item 3.1.1.1.
7 6-May N/A N/A N/A What type of grass is dominant on the airfields? Bahia is the dominant grass on the airfields. 0003
8 6-May 20 Sec C 2.8.6 Will the Airfield need a weed control program? Can we spray for broadleaf weed control?
No the Airfield does not require weed control; weed control via spraying at the airfield is not permitted.
9 6-May 20 Attachment J-
1503050-01 & J- 1503050-04
Map
During the Airfield site visit we were told we must mow 750' from the runway centerline to the yellow signs in the "cut over area"? This is considerably further than the previous contractor mowed as evidenced by their recently mowed line.
Areas to be mowed and the boundries thereof are presented in the maps which accompany the solicitation.
Refer to Section J Attachment J-1503050-04 Site Maps.
10 6-May N/A N/A N/A
Who will do the "clean-up" of this new extended ground" prior to our mowing this new ground? The new area to be mowed from all appearance is newly cleared land. This appears to be an extra costly prep and cut with very tall out of scope weeds, saplings, and undergrowth. Looks to be as much as 4' tall and highly likely to have stump holes, stumps and unknown conditions. Seems we need a special bid Clin line item to account for the land prep for our maintaining the new ground on this contract?
Contractor should assume all trees to be four inches or less and lands cleared and all stumps ground winthin the last three years. The Government considers saplings 4 inches or less to be bushoggable. Equipment should be sized accordingly.
Amend No.
REFERENCEQuestion
No.
QUESTION GOVERNMENT RESPONSE
Date Received
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
N69450-22-R-0062 Meridian Ground
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. Amend No.
No.
QUESTION GOVERNMENT RESPONSE
Received
11 6-May 56 Solicitation Instruction to
Offerors Request a Phase-in Clin for bid schedule?
A separate CLIN for Phase-In will not be provided. As stated in the RFP, "Pricing shall include applicable Phase-In and Phase-Out costs. There is no separately priced CLIN for Phase-In and Phase-Out".
All costs associated with Annex 2 management and administration requirements relevant to the entire scope of the contract (including mobilization/demobilization) shall be allocated to the ELINs. This cost is spread to Spec Item 3 for Recurring Work or Spec Item 4 for 100% Non-Recurring Work.
12 6-May N/A N/A N/A Fuel Storage on Base? Where can we locate a fuel tank and how large a tank will you allow?
There is no fuel tank on base at NAS Meridian that is currently in use or allowed
13 9-May N/A FAR 22-1008-2 Is there a current collective bargaining agreement in place on the existing contract? Will the new contract be awarded utilizing a collective bargaining agreement?
Yes, there is a collective bargaining agreement (CBA) in place on the current contract that will apply to the follow-on contract. The current CBA has been incorporated into the solicitation via Amendment 0003 and is provided as an attachment.